27. Analog-to-digital converters (ADC1/2)
27.1 ADC introduction
This section describes the implementation of up to 2 ADCs:
- • ADC1 and ADC2 are tightly coupled and can operate in dual mode (ADC1 is master).
Each ADC consists of a 12-bit successive approximation analog-to-digital converter.
Each ADC has up to 19 multiplexed channels. A/D conversion of the various channels can be performed in single, continuous, scan or discontinuous mode. The result of the ADC is stored in a left-aligned or right-aligned 16-bit data register.
The ADCs are mapped on the AHB bus to allow fast data handling.
The analog watchdog features allow the application to detect if the input voltage goes outside the user-defined high or low thresholds.
A built-in hardware oversampler allows improving analog performances while off-loading the related computational burden from the CPU.
An efficient low-power mode is implemented to allow very low consumption at low frequency.
27.2 ADC main features
- • High-performance features
- – Up to 2 ADCs which can operate in dual mode:
- ADC1 is connected to 17 external channels and to 2 internal channels
- ADC2 is connected to 17 external channels and to 2 internal channels
- – 12, 10, 8 or 6-bit configurable resolution
- – ADC conversion time independent from the AHB bus clock frequency
- – Faster conversion time by lowering resolution
- – Manage single-ended or differential inputs
- – AHB slave bus interface to allow fast data handling
- – Self-calibration
- – Channel-wise programmable sampling time
- – Flexible sampling time control
- – Up to 4 injected channels (analog inputs assignment to regular or injected channels is fully configurable)
- – Hardware assistant to prepare the context of the injected channels to allow fast context switching
- – Data alignment with in-built data coherency
- – Data can be managed by DMA for regular channel conversions
- – Data can be routed to ADF interface for post processing
- – Four dedicated data registers for the injected channels
- – Up to 2 ADCs which can operate in dual mode:
- • Low-power features
- – Speed adaptive low-power mode to reduce ADC consumption when operating at low frequency
- – Allows slow bus frequency application while keeping optimum ADC performance
- – Provides automatic control to avoid ADC overrun in low AHB bus clock frequency application (auto-delayed mode)
- • Oversampler
- – 16-bit data register
- – Oversampling ratio adjustable from 2 to 256x
- – Programmable data shift up to 8 bits
- • Data preconditioning
- – Offset compensation
- • Analog input channels
- – External analog inputs (per ADC):
- Up to 6 fast channels from GPIO pads
- Up to 11 slow channels from GPIO pads
- – 1 channel for the internal temperature sensor (\(V_{SENSE}\))
- – 1 channel for the internal reference voltage (\(V_{REFINT}\))
- – 1 channel for monitoring the external VBAT power supply pin
- – 1 channel for monitoring the internal \(V_{DDCORE}\) supply
- – External analog inputs (per ADC):
- • Start-of-conversion can be initiated:
- – By software for both regular and injected conversions
- – By hardware triggers with configurable polarity (internal timers events or GPIO input events) for both regular and injected conversions
- • Conversion modes
- – Each ADC can convert a single channel or can scan a sequence of channels
- – Single mode converts selected inputs once per trigger
- – Continuous mode converts selected inputs continuously
- – Discontinuous mode
- • Interrupt generation at ADC ready, the end of sampling, the end of conversion (regular or injected), end of sequence conversion (regular or injected), analog watchdog 1, 2 or 3 or overrun events
- • 3 analog watchdogs per ADC
- – Watchdog can perform filtering to ignore out-of-range data
- • ADC input range: \(V_{SSA} \leq V_{IN} \leq V_{REF+}\)
Figure 225 shows the block diagram of one ADC.
27.3 ADC implementation
Table 224. ADC features
| ADC modes/features | ADC1 | ADC2 |
|---|---|---|
| Resolution | 12 bit | |
| Maximum sampling speed | 5 Msps (12-bit resolution) | |
| Dual mode operation | X | |
| Hardware offset calibration | X | |
| Hardware linearity calibration | - | |
| Single-end input | X | |
| Differential input | X | |
| Injected channel conversion | X | |
| Oversampling | up to x256 | |
| Data register | 16 bits | |
| Data register FIFO depth | 3 stages | |
| DMA support | X | |
| Parallel data output to ADF | X | |
| Offset compensation | X | |
| Gain compensation | - | |
| Number of Analog watchdog | 3 | |
| Option register | - | X |
Table 225. Memory location of the temperature sensor calibration values
| Name | Description | Memory address |
|---|---|---|
| TS_CAL1 | Temperature sensor 12-bit raw data acquired by ADC1 at 30 °C (±5 °C), \(V_{DDA} = V_{REF+} = 3.3\) V (±10 mV) | 0x08FF F814 - 0x08FF F815 |
| TS_CAL2 | Temperature sensor 12-bit raw data acquired by ADC1 at 130 °C (±5 °C), \(V_{DDA} = V_{REF+} = 3.3\) V (±10 mV) | 0x08FF F818 - 0x08FF F819 |
Table 226. Memory location of the internal reference voltage sensor calibration value
| Name | Description | Memory address |
|---|---|---|
| VREFINT_CAL | 12-bit raw data acquired by ADC1 at 30 °C (±5 °C), \(V_{DDA} = V_{REF+} = 3.3\) V (±10 mV) | 0x08FF F810 - 0x08FF F811 |
27.4 ADC functional description
27.4.1 ADC block diagram
Figure 225 shows the ADC block diagram and Table 227 gives the ADC pin description.
Figure 225. ADC block diagram

27.4.2 ADC pins and internal signals
Table 227. ADC input/output pins
| Pin name | Signal type | Description |
|---|---|---|
| VDDA | Input, analog supply | Analog power supply and positive reference voltage for the ADC |
| VSSA | Input, analog supply ground | Ground for analog power supply, equal to VSS. |
| VREF+ | Input, analog reference positive | The higher/positive reference voltage for the ADC. |
| VREF- | Input, analog reference negative | The lower/negative reference voltage for the ADC. VREF- is internally connected to VSSA |
| ADC1/2_INNi/INPi | Negative/positive external analog input signals | 19 negative/positive external analog input channels (refer to Section 27.4.4: ADC connectivity for details) |
Table 228. ADC internal input/output signals
| Internal signal name | Signal type | Description |
|---|---|---|
| VINPi | Positive analog input channels | Positive internal analog input channels connected either to ADC1/2_INPi external channels or to internal channels. |
| VINNi | Negative analog input channels | Negative internal analog input channels connected either to ADC1/2_INNi external channels or to internal channels |
| adc_ext_trgi | Inputs | ADC external trigger inputs for regular conversions. These inputs are shared between the ADC master and the ADC slave. |
| adc_jext_trgi | Inputs | ADC external trigger inputs for the injected conversions. These inputs are shared between the ADC master and the ADC slave. |
| adc_awdx | Output | Internal analog watchdog output signal connected to on-chip timers. (x = Analog watchdog number 1,2,3) |
| adc_ker_ck_input | Input | ADC kernel clock |
| adc_hclk | Input | ADC peripheral clock |
| adc_it | Output | ADC interrupt |
| adc_dma | Output | ADC DMA request |
| adc_dat[15:0] | Output | ADC data outputs |
Table 229. ADC interconnection
| Signal name | Source/destination |
|---|---|
| ADC1 VINP[16] | VSENSE (internal temperature sensor output voltage). |
| ADC1 VINP[17] | VREFINT (output voltage from internal reference voltage). |
| ADC2 VINP[16] | VBAT/4 (VBAT pin input voltage divided by 4). |
| ADC2 VINP[17] | VDDCORE (internal digital core voltage). |
Table 229. ADC interconnection (continued)
| Signal name | Source/destination |
|---|---|
| adc_dat[15:0] | adf_adc1_dat[15:0], adf_adc2_dat[15:0] |
| adc_ext_trg0 | tim1_oc1 |
| adc_ext_trg1 | tim1_oc2 |
| adc_ext_trg2 | tim1_oc3 |
| adc_ext_trg3 | tim2_oc2 |
| adc_ext_trg4 | tim3_trgo |
| adc_ext_trg5 | tim4_oc4 |
| adc_ext_trg6 | exti11 |
| adc_ext_trg7 | tim12_trgo |
| adc_ext_trg8 | tim9_trgo |
| adc_ext_trg9 | tim1_trgo |
| adc_ext_trg10 | tim1_trgo2 |
| adc_ext_trg11 | tim2_trgo |
| adc_ext_trg12 | tim4_trgo |
| adc_ext_trg13 | tim6_trgo |
| adc_ext_trg14 | tim15_trgo |
| adc_ext_trg15 | tim3_oc4 |
| adc_ext_trg16 | reserved |
| adc_ext_trg17 | reserved |
| adc_ext_trg18 | lptim1_ch1 |
| adc_ext_trg19 | lptim2_ch1 |
| adc_ext_trg20 | lptim3_ch1 |
| adc_ext_trg21 | reserved |
| adc_ext_trg22 | reserved |
| adc_ext_trg23 | reserved |
| adc_ext_trg24 | reserved |
| adc_ext_trg25 | reserved |
| adc_ext_trg26 | reserved |
| adc_ext_trg27 | reserved |
| adc_ext_trg28 | reserved |
| adc_ext_trg29 | reserved |
| adc_ext_trg30 | reserved |
| adc_ext_trg31 | reserved |
| adc_jext_trg0 | tim1_trgo |
| adc_jext_trg1 | tim1_oc4 |
Table 229. ADC interconnection (continued)
| Signal name | Source/destination |
|---|---|
| adc_jext_trg2 | tim2_trgo |
| adc_jext_trg3 | tim2_oc1 |
| adc_jext_trg4 | tim3_oc4 |
| adc_jext_trg5 | tim4_trgo |
| adc_jext_trg6 | exti15 |
| adc_jext_trg7 | tim9_oc1 |
| adc_jext_trg8 | tim1_trgo2 |
| adc_jext_trg9 | tim12_trgo |
| adc_jext_trg10 | tim9_trgo |
| adc_jext_trg11 | tim3_oc3 |
| adc_jext_trg12 | tim3_trgo |
| adc_jext_trg13 | tim3_oc1 |
| adc_jext_trg14 | tim6_trgo |
| adc_jext_trg15 | tim15_trgo |
| adc_jext_trg16 | reserved |
| adc_jext_trg17 | reserved |
| adc_jext_trg18 | lptim1_ch2 |
| adc_jext_trg19 | lptim2_ch2 |
| adc_jext_trg20 | lptim3_ch1 |
| adc_jext_trg21 | reserved |
| adc_jext_trg22 | reserved |
| adc_jext_trg23 | reserved |
| adc_jext_trg24 | reserved |
| adc_jext_trg25 | reserved |
| adc_jext_trg26 | reserved |
| adc_jext_trg27 | reserved |
| adc_jext_trg28 | reserved |
| adc_jext_trg29 | reserved |
| adc_jext_trg30 | reserved |
| adc_jext_trg31 | reserved |
27.4.3 ADC clocks
Dual clock domain architecture
The dual clock-domain architecture means that the ADC clock is independent from the AHB bus clock.
The ADC input clock can be selected between two different clock sources (see Figure 226: ADC clock scheme):
- 1. The ADC clock can be a specific clock source (adc_ker_ck_input), independent and asynchronous with the AHB clock.
Refer to section Reset and clock control (RCC) for more information on how to generate the ADC dedicated clock. To select this scheme, CKMODE[1:0] bits of ADC_CCR register must be set to 00. - 2. The ADC clock can be derived from the AHB clock interface divided by a programmable factor of 1, 2 or 4. To select this scheme, CKMODE[1:0] bits of ADC_CCR must be different from 00. The programmable divider factor can be configured through to CKMODE[1:0] bits of ADC_CCR.
The prescaling factor of 1 (CKMODE[1:0] = 01) can be used only if the AHB prescaler is set to 1 (BMPRE[3:0] = 0XXX in the RCC_BMCFGR register).
Option 1 has the advantage of achieving the maximum ADC clock frequency whatever the AHB clock scheme selected. The ADC clock can eventually be divided by the following ratio: 1, 2, 4, 6, 8, 12, 16, 32, 64, 128, 256, using the prescaler configured with bits PRESC[3:0] in the ADC_CCR register.
Option 2 has the advantage of bypassing the clock domain resynchronizations. This can be useful when the ADC is triggered by a timer and if the application requires that the ADC is precisely triggered without any uncertainty (otherwise, an uncertainty of the trigger instant is added by the resynchronizations between the two clock domains).
The clock is configured through CKMODE[1:0] bits must be compliant with the operating frequency specified in the device datasheet.
Figure 226. ADC clock scheme

The diagram illustrates the ADC clock scheme. The RCC (Reset and clock controller) provides two external clock signals: adc_hclk and adc_ker_ck_input. The adc_hclk signal is connected to the AHB interface within the ADC1 and ADC2 block. The adc_ker_ck_input signal is connected to a prescaler block. Inside the ADC1 and ADC2 block, the adc_hclk signal is also connected to a divider block. The divider block has two inputs: one from adc_hclk and one from the prescaler block. The divider block's output is connected to a multiplexer. The multiplexer has two inputs: one from the divider block and one from the prescaler block. The multiplexer's output is connected to the Analog ADC1 (master) and Analog ADC2 (slave) blocks. The multiplexer is controlled by the CKMODE[1:0] bits of the ADCx_CCR register. The CKMODE[1:0] bits can be 00, 01, 10, or 11. When 00, the multiplexer selects the prescaler output. When 01, it selects the divider output. When 10, it selects the adc_hclk signal. When 11, it selects the adc_ker_ck_input signal. The prescaler block is controlled by the PRESC[3:0] bits of the ADCx_CCR register. The divider block is controlled by the CKMODE[1:0] bits of the ADCx_CCR register. The divider block can divide the adc_hclk signal by 1, 2, or 4. The prescaler block can divide the adc_ker_ck_input signal by 1, 2, 4, 6, 8, 10, 12, 16, 32, 64, 128, or 256. The output of the multiplexer is the adc_ker_ck signal, which is used by the Analog ADC1 (master) and Analog ADC2 (slave) blocks.
MSv63822V3
Clock ratio constraint between ADC clock and AHB clock
There are generally no constraints to be respected for the ratio between the ADC clock and the AHB clock except if some injected channels are programmed. In this case, it is mandatory to respect the following ratio:
- • \(F_{adc\_hclk} \geq F_{ADC} / 4\) if the resolution of all channels are 12-bit or 10-bit
- • \(F_{adc\_hclk} \geq F_{ADC} / 3\) if there are some channels with resolutions equal to 8-bit (and none with lower resolutions)
- • \(F_{adc\_hclk} \geq F_{ADC} / 2\) if there are some channels with resolutions equal to 6-bit
Constraints between ADC clocks
When several ADC interfaces are used simultaneously, it is mandatory to use the same clock source from the RCC block without prescaler ratio for all ADC interfaces.
27.4.4 ADC connectivity
ADC inputs are connected to the external channels as well as internal sources as described below.
Figure 227. ADC1 connectivity

The diagram illustrates ADC1 connectivity with inputs mapped to channels and routed through channel selection switches to the SAR ADC1 block:
- External Pins / Internal Signals:
- ADC12_INP0, ADC12_INN1, ADC12_INP1, ADC1_INP2, ADC12_INP3, ADC12_INP4, ADC12_INP5, ADC1_INN2, ADC1_INP6, ADC12_INN3, ADC12_INP7, ADC12_INN4, ADC12_INP8, ADC12_INN8, ADC1_INP9, ADC12_INP10, ADC12_INN10, ADC1_INP11, ADC12_INN11, ADC12_INP12, ADC1_INP13, ADC12_INN12, ADC12_INP14, ADC12_INP15, VSENSE, VREFINT, ADC1_INP18.
- VSSA reference connections.
- ADC1 Channel Inputs:
- VINP[0] / VINN[0] to VINP[5] / VINN[5] designated as Fast channel.
- VINP[6] / VINN[6] to VINP[18] / VINN[18] designated as Slow channel.
- Channel selection: Switch network routing selected VINP and VINN inputs to the SAR ADC1 core.
- SAR ADC1 core: Receives differential inputs VINP and VINN, along with reference voltages VREF+ and VREF-.
MSv66804V1

The diagram illustrates the connectivity of the ADC2 block. It shows a series of input pins on the left, which are mapped to internal input channels (VINP[0] to VINP[18]) and internal negative inputs (VINN[0] to VINN[18]). The inputs are categorized into fast and slow channels. A 'Channel selection' block is shown as a vertical dashed line. The SAR ADC2 core is represented by a trapezoid/block on the right, with VINP and VINN inputs and VREF+ and VREF- references. Various pins/internal channels are connected to VSSA, VBAT/4, or VDDCORE.
| Pin / Source | Internal Channel | Channel Type |
|---|---|---|
| ADC12_INP0 | VINP[0] | Fast channel |
| ADC12_INN1 | VINN[0] / VSSA | Fast channel |
| ADC12_INP1 | VINP[1], VINN[1] | Fast channel |
| ADC2_INP2 | VINP[2], VINN[2] | Fast channel |
| ADC12_INP3 | VINP[3], VINN[3] | Fast channel |
| ADC12_INP4 | VINP[4], VINN[4] | Fast channel |
| ADC12_INP5 | VINP[5], VINN[5] | Fast channel |
| ADC2_INN2 | VINP[6] | Slow channel |
| ADC2_INP6 | VINN[6] / VSSA | Slow channel |
| ADC12_INN3 | VINP[7] | Slow channel |
| ADC12_INP7 | VINN[7] / VSSA | Slow channel |
| ADC12_INN4 | VINP[8] | Slow channel |
| ADC12_INP8 | VINN[8] / VSSA | Slow channel |
| ADC12_INN8 | VINP[9] | Slow channel |
| ADC1_INP9 | VINN[9] / VSSA | Slow channel |
| ADC12_INP10 | VINP[10], VINN[10] | Slow channel |
| ADC12_INN10 | VINP[11] | Slow channel |
| ADC1_INP11 | VINN[11] | Slow channel |
| ADC12_INN11 | VINP[12] | Slow channel |
| ADC12_INP12 | VINN[12] | Slow channel |
| ADC1_INP13 | VINP[13] | Slow channel |
| ADC12_INN12 | VINN[13] / VSSA | Slow channel |
| ADC12_INP14 | VINP[14], VINN[14] / VSSA | Slow channel |
| ADC12_INP15 | VINP[15], VINN[15] / VSSA | Slow channel |
| VBAT/4 | VINP[16], VINN[16] / VSSA | Slow channel |
| VDDCORE | VINP[17], VINN[17] / VSSA | Slow channel |
| ADC2_INP18 | VINP[18], VINN[18] / VSSA | Slow channel |
MSv66805V1
27.4.5 Slave AHB interface
The ADCs implement an AHB slave port for control/status register and data access. The features of the AHB interface are listed below:
- • Word (32-bit) accesses
- • Single cycle response
- • Response to all read/write accesses to the registers with zero wait states.
The AHB slave interface does not support split/retry requests, and never generates AHB errors.
27.4.6 ADC Deep-power-down mode (DEEPPWD) and ADC voltage regulator (ADVREGEN)
By default, the ADC is in Deep-power-down mode where its supply is internally switched off to reduce the leakage currents (the reset state of bit DEEPPWD is 1 in the ADC_CR register).
To start ADC operations, it is first needed to exit Deep-power-down mode by setting bit DEEPPWD = 0.
Then, it is mandatory to enable the ADC internal voltage regulator by setting the bit ADVREGEN = 1 into ADC_CR register. The software must wait for the startup time of the ADC voltage regulator (\(T_{ADCVREG\_STUP}\)) before launching a calibration or enabling the ADC. This delay must be implemented by software.
For the startup time of the ADC voltage regulator, refer to device datasheet for \(T_{ADCVREG\_STUP}\) parameter.
When ADC operations are complete, the ADC can be disabled (ADEN = 0). It is possible to save power by also disabling the ADC voltage regulator. This is done by writing bit ADVREGEN = 0.
Then, to save more power by reducing the leakage currents, it is also possible to re-enter in ADC Deep-power-down mode by setting bit DEEPPWD = 1 into ADC_CR register. This is particularly interesting before entering Stop mode.
Note: Writing DEEPPWD = 1 automatically disables the ADC voltage regulator and bit ADVREGEN is automatically cleared.
When the internal voltage regulator is disabled (ADVREGEN = 0), the internal analog calibration is kept.
In ADC Deep-power-down mode (DEEPPWD = 1), the internal analog calibration is lost and it is necessary to either relaunch a calibration or re-apply the calibration factor which was previously saved (refer to Section 27.4.8: Calibration (ADCAL, ADCALDIF, ADC_CALFACT)).
27.4.7 Single-ended and differential input channels
Channels can be configured to be either single-ended input or differential input by programming DIFSEL[i] bits in the ADC_DIFSEL register. This configuration must be written while the ADC is disabled (ADEN = 0). Note that the DIFSEL[i] bits corresponding to single-ended channels are always programmed at 0.
In single-ended input mode, the analog voltage to be converted for channel “i” is the difference between the external voltage \(V_{\text{INP}[i]}\) (positive input) and \(V_{\text{REF}-}\) (negative input).
In differential input mode, the analog voltage to be converted for channel “i” is the difference between the external voltage \(V_{\text{INP}[i]}\) (positive input) and \(V_{\text{INN}[i]}\) (negative input).
The output data for the differential mode is an unsigned data. When \(V_{\text{INP}[i]}\) equals \(V_{\text{REF}-}\), \(V_{\text{INN}[i]}\) equals \(V_{\text{REF}+}\) and the output data is 0x000 (12-bit resolution mode). When \(V_{\text{INP}[i]}\) equals \(V_{\text{REF}+}\), \(V_{\text{INN}[i]}\) equals \(V_{\text{REF}-}\) and the output data is 0xFFF.
When ADC is configured as differential mode, both inputs should be biased at \((V_{\text{REF}+}) / 2\) voltage.
The input signals are supposed to be differential (common mode voltage should be fixed).
Internal channels (such as \(V_{\text{REFINT}}\) and \(V_{\text{SENSE}}\)) are used in single-ended mode only.
For a complete description of how the input channels are connected for each ADC, refer to Section 27.4.4: ADC connectivity.
Caution: When configuring the channel “i” in differential input mode, its negative input voltage \(V_{\text{INN}[i]}\) is connected to another channel. As a consequence, this channel is no longer usable in single-ended mode or in differential mode and must never be configured to be converted. Some channels are shared between ADC1/ADC2: this can make the channel on the other ADC unusable. Only exception is interleaved mode for ADC master and the slave.
27.4.8 Calibration (ADCAL, ADCALDIF, ADC_CALFACT)
Each ADC provides an automatic calibration procedure which drives all the calibration sequence including the power-on/off sequence of the ADC. During the procedure, the ADC calculates a calibration factor which is 7-bit wide and which is applied internally to the ADC until the next ADC power-off. During the calibration procedure, the application must not use the ADC and must wait until calibration is complete.
Calibration is preliminary to any ADC operation. It removes the offset error which may vary from chip to chip due to process or bandgap variation.
The calibration factor to be applied for single-ended input conversions is different from the factor to be applied for differential input conversions:
- • Write ADCALDIF = 0 before launching a calibration which is applied for single-ended input conversions.
- • Write ADCALDIF = 1 before launching a calibration which is applied for differential input conversions.
The calibration is then initiated by software by setting bit ADCAL = 1. Calibration can only be initiated when the ADC is disabled (when ADEN = 0). ADCAL bit stays at 1 during all the
calibration sequence. It is then cleared by hardware as soon the calibration completes. At this time, the associated calibration factor is stored internally in the analog ADC and also in the bits CALFACT_S[6:0] or CALFACT_D[6:0] of ADC_CALFACT register (depending on single-ended or differential input calibration)
The internal analog calibration is kept if the ADC is disabled (ADEN = 0). However, if the ADC is disabled for extended periods, then it is recommended that a new calibration cycle is run before re-enabling the ADC.
The internal analog calibration is lost each time the power of the ADC is removed (example, when the product enters in Standby or \(V_{BAT}\) mode). In this case, to avoid spending time recalibrating the ADC, it is possible to re-write the calibration factor into the ADC_CALFACT register without recalibrating, supposing that the software has previously saved the calibration factor delivered during the previous calibration.
The calibration factor can be written if the ADC is enabled but not converting (ADEN = 1 and ADSTART = 0 and JADSTART = 0). Then, at the next start of conversion, the calibration factor is automatically injected into the analog ADC. This loading is transparent and does not add any cycle latency to the start of the conversion. It is recommended to recalibrate when \(V_{REF+}\) voltage changed more than 10%.
Software procedure to calibrate the ADC
- 1. Ensure DEEPPWD = 0, ADVREGEN = 1 and that ADC voltage regulator startup time has elapsed.
- 2. Ensure that ADEN = 0.
- 3. Select the input mode for this calibration by setting ADCALDIF = 0 (single-ended input) or ADCALDIF = 1 (differential input).
- 4. Set ADCAL = 1.
- 5. Wait until ADCAL = 0.
- 6. The calibration factor can be read from ADC_CALFACT register.
Figure 229. ADC calibration
![Timing diagram for ADC calibration showing ADCALDIF, ADCAL, ADC State, and CALFACT_x[6:0] signals over time.](/RM0477-STM32H7Rx-7Sx/2f68d1de42d24bcdd20f55a3e042b039_img.jpg)
The diagram illustrates the ADC calibration sequence. It shows four signals over time:
- ADCALDIF: A control signal that can be 0 (Single-ended input) or 1 (Differential input).
- ADCAL: A signal that is set to 1 to initiate calibration and returns to 0 when calibration is complete. The duration of the high state is labeled \(t_{CAB}\).
- ADC State: Shows the ADC transitioning from OFF to Startup, then to Calibrate, and finally back to OFF.
- CALFACT_x[6:0]: Shows the calibration factor being written to the register during the Calibrate state. The value 0x00 is shown as a placeholder.
Below the signals, there are two boxes indicating the control method:
- by S/W: With a rising edge arrow, indicating software control for ADCALDIF.
- by H/W: With a rising edge arrow, indicating hardware control for ADCAL.
A box labeled Indicative timings is also present. The reference ID MSv30263V2 is located in the bottom right corner.
Software procedure to reinject a calibration factor into the ADC
- 1. Ensure ADEN = 1 and ADSTART = 0 and JADSTART = 0 (ADC enabled and no conversion is ongoing).
- 2. Write CALFACT_S and CALFACT_D with the new calibration factors.
- 3. When a conversion is launched, the calibration factor is injected into the analog ADC only if the internal analog calibration factor differs from the one stored in bits CALFACT_S for single-ended input channel or bits CALFACT_D for differential input channel.
Figure 230. Updating the ADC calibration factor
![Timing diagram showing the process of updating the ADC calibration factor. The diagram includes five horizontal tracks: ADC state, Internal calibration factor[6:0], Start conversion (hardware or software), WRITE ADC_CALFACT, and CALFACT_S[6:0]. The ADC state track shows transitions between 'Ready (not converting)', 'Converting channel (Single ended)', and 'Ready'. The Internal calibration factor track shows a transition from F1 to F2. The Start conversion track shows two rising edges. The WRITE ADC_CALFACT track shows a single rising edge. The CALFACT_S[6:0] track shows a transition from F1 to F2. A legend at the bottom indicates that transitions can be triggered 'by s/w' (software) or 'by h/w' (hardware).](/RM0477-STM32H7Rx-7Sx/3d9d5da815d581177884e08d35fae474_img.jpg)
The diagram illustrates the timing for updating the ADC calibration factor. It shows the relationship between the ADC state, internal calibration factor, start conversion signal, write ADC_CALFACT signal, and the CALFACT_S[6:0] register. The ADC state transitions from 'Ready (not converting)' to 'Converting channel (Single ended)', then back to 'Ready', and then to 'Converting channel (Single ended)' again. The internal calibration factor transitions from F1 to F2. The start conversion signal has two rising edges. The WRITE ADC_CALFACT signal has one rising edge. The CALFACT_S[6:0] register transitions from F1 to F2. A legend at the bottom indicates that transitions can be triggered 'by s/w' (software) or 'by h/w' (hardware).
Converting single-ended and differential analog inputs with a single ADC
If the ADC is supposed to convert both differential and single-ended inputs, two calibrations must be performed, one with ADCALDIF = 0 and one with ADCALDIF = 1. The procedure is the following:
- 1. Disable the ADC.
- 2. Calibrate the ADC in single-ended input mode (with ADCALDIF = 0). This updates the register CALFACT_S[6:0].
- 3. Calibrate the ADC in differential input modes (with ADCALDIF = 1). This updates the register CALFACT_D[6:0].
- 4. Enable the ADC, configure the channels and launch the conversions. Each time there is a switch from a single-ended to a differential inputs channel (and vice-versa), the calibration is automatically injected into the analog ADC.
Figure 231. Mixing single-ended and differential channels
![Timing diagram showing the sequence of ADC states (RDY, CONV CH 1, RDY, CONV CH 2, RDY, CONV CH 3, RDY, CONV CH 4) triggered by external events. It also shows the internal calibration factor [6:0] and the CALFACT_S[6:0] and CALFACT_D[6:0] registers. The diagram illustrates how single-ended and differential channels are mixed in a sequence.](/RM0477-STM32H7Rx-7Sx/c4181d38f971e5e8a8a6f7020430c2dd_img.jpg)
The diagram illustrates the timing and calibration factor management for mixing single-ended and differential channels in an ADC. It shows a sequence of events triggered by external trigger events.
- Trigger event: A series of four external trigger events are shown as vertical pulses.
- ADC state: The ADC state transitions through RDY (Ready), CONV CH 1 (Single ended inputs channel), RDY, CONV CH 2 (Differential inputs channel), RDY, CONV CH 3 (Differential inputs channel), RDY, and CONV CH 4 (Single inputs channel).
- Internal calibration factor[6:0]: The internal calibration factor is shown as a sequence of values: F2, F3, and F2.
- CALFACT_S[6:0]: The single-ended calibration factor is shown as a constant value F2.
- CALFACT_D[6:0]: The differential calibration factor is shown as a constant value F3.
MSv30530V2
27.4.9 ADC on-off control (ADEN, ADDIS, ADRDY)
First of all, follow the procedure explained in Section 27.4.6: ADC Deep-power-down mode (DEEPPWD) and ADC voltage regulator (ADVREGEN).
Once DEEPPWD = 0 and ADVREGEN = 1, the ADC can be enabled and the ADC needs a stabilization time of \(t_{STAB}\) before it starts converting accurately, as shown in Figure 232. Two control bits enable or disable the ADC:
- • ADEN = 1 enables the ADC. The flag ADRDY is set once the ADC is ready for operation.
- • ADDIS = 1 disables the ADC. ADEN and ADDIS are then automatically cleared by hardware as soon as the analog ADC is effectively disabled.
Regular conversion can then start either by setting ADSTART = 1 (refer to Section 27.4.18: Conversion on external trigger and trigger polarity (EXTSEL, EXTEN, JEXTSEL, JEXTEN)) or when an external trigger event occurs, if triggers are enabled.
Injected conversions start by setting JADSTART = 1 or when an external injected trigger event occurs, if injected triggers are enabled.
Software procedure to enable the ADC
- 1. Clear the ADRDY bit in the ADC_ISR register by writing '1'.
- 2. Set ADEN = 1.
- 3. Wait until ADRDY = 1 (ADRDY is set after the ADC startup time). This can be done using the associated interrupt (setting ADRDYIE = 1).
- 4. Clear the ADRDY bit in the ADC_ISR register by writing '1' (optional).
Caution: ADEN bit cannot be set when ADCAL is set and during four ADC clock cycles after the ADCAL bit is cleared by hardware (end of the calibration).
Software procedure to disable the ADC
- 1. Check that both ADSTART = 0 and JADSTART = 0 to ensure that no conversion is ongoing. If required, stop any regular and injected conversion ongoing by setting ADSTP = 1 and JADSTP = 1 and then wait until ADSTP = 0 and JADSTP = 0.
- 2. Set ADDIS = 1.
- 3. If required by the application, wait until ADEN = 0, until the analog ADC is effectively disabled (ADDIS is automatically reset once ADEN = 0).
Figure 232. Enabling / disabling the ADC

by S/W ↑ by H/W ↓
MSv62472V1
27.4.10 Constraints when writing the ADC control bits
The software is allowed to write the RCC control bits to configure and enable the ADC clock (refer to RCC Section), the DIFSEL[i] control bits in the ADC_DIFSEL register and the control bits ADCAL and ADEN in the ADC_CR register, only if the ADC is disabled (ADEN must be equal to 0).
The software is then allowed to write the control bits ADSTART, JADSTART and ADDIS of the ADC_CR register only if the ADC is enabled and there is no pending request to disable the ADC (ADEN must be equal to 1 and ADDIS to 0).
For all the other control bits of the ADC_CFGR, ADC_SMPRx, ADC_TRy, ADC_SQRy, ADC_JDRy, ADC_OFRy, ADC_OFCHy and ADC_IER registers:
- • For control bits related to configuration of regular conversions, the software is allowed to write them only if the ADC is enabled (ADEN = 1) and if there is no regular conversion ongoing (ADSTART must be equal to 0).
- • For control bits related to configuration of injected conversions, the software is allowed to write them only if the ADC is enabled (ADEN = 1) and if there is no injected conversion ongoing (JADSTART must be equal to 0).
- • ADC_TRy registers can be modified when an analog-to-digital conversion is ongoing (refer to Section 27.4.29: Analog window watchdog (AWD1EN, JAWD1EN, AWD1SGL, AWD1CH, AWD2CH, AWD3CH, AWD_HTx, AWD_LTx, AWDx) for details).
The software is allowed to write the ADSTP or JADSTP control bits of the ADC_CR register only if the ADC is enabled, possibly converting, and if there is no pending request to disable the ADC (ADSTART or JADSTART must be equal to 1 and ADDIS to 0).
The software can write the register ADC_JSQR at any time, when the ADC is enabled (ADEN = 1). Refer to Section 27.7.16: ADC injected sequence register (ADC_JSQR) for additional details.
Note: There is no hardware protection to prevent these forbidden write accesses and ADC behavior may become in an unknown state. To recover from this situation, the ADC must be disabled (clear ADEN = 0 as well as all the bits of ADC_CR register).
27.4.11 Channel selection (ADC_SQRy, ADC_JSQR)
The ADC features up to 19 multiplexed channels per ADC, out of which:
- • Up to 17 analog inputs coming from GPIO pads (ADC_INP/INN[i]) depending on the products, not all of them are available on GPIO pads.
- • Up to 4 internal channels (refer to Section 27.4.4: ADC connectivity for details)
To convert one of the internal analog channels, the corresponding analog sources must first be enabled by programming bits VREFEN, VBATEN or TSEN in the ADC_CCR registers.
Refer to Table ADC interconnection in Section 27.4.2: ADC pins and internal signals for the connection of the above internal analog inputs to external ADC pins or internal signals.
The conversions can be organized in two groups: regular and injected. A group consists of a sequence of conversions that can be done on any channel and in any order. For instance, it is possible to implement the conversion sequence in the following order: ADC1/2_INP/INN3, ADC1/2_INP/INN8, ADC1/2_INP/INN2, ADC1/2_INN/INP2, ADC1/2_INP/INN0, ADC1/2_INP/INN2, ADC1/2_INP/INN2, ADC1/2_INP/INN15.
- • A regular group is composed of up to 16 conversions. The regular channels and their order in the conversion sequence must be selected in the ADC_SQRy registers. The total number of conversions in the regular group must be written in the L[3:0] bits in the ADC_SQR1 register.
- • An injected group is composed of up to 4 conversions. The injected channels and their order in the conversion sequence must be selected in the ADC_JSQR register. The total number of conversions in the injected group must be written in the L[1:0] bits in the ADC_JSQR register.
ADC_SQRy registers must not be modified while regular conversions can occur. For this, the ADC regular conversions must be first stopped by writing ADSTP = 1 (refer to Section 27.4.17: Stopping an ongoing conversion (ADSTP, JADSTP)).
The software is allowed to modify on-the-fly the ADC_JSQR register when JADSTART is set to 1 (injected conversions ongoing) only when the context queue is enabled (JQDIS = 0 in ADC_CFGR register). Refer to Section 27.4.21: Queue of context for injected conversions
27.4.12 Channel-wise programmable sampling time (SMPR1, SMPR2)
Before starting a conversion, the ADC must establish a direct connection between the voltage source under measurement and the embedded sampling capacitor of the ADC. This sampling time must be enough for the input voltage source to charge the embedded capacitor to the input voltage level.
Each channel can be sampled with a different sampling time which is programmable using the SMP[2:0] bits in the ADC_SMPR1 and ADC_SMPR2 registers. It is therefore possible to select among the following sampling time values:
- • SMP = 000: 2.5 ADC clock cycles
- • SMP = 001: 6.5 ADC clock cycles
- • SMP = 010: 12.5 ADC clock cycles
- • SMP = 011: 24.5 ADC clock cycles
- • SMP = 100: 47.5 ADC clock cycles
- • SMP = 101: 92.5 ADC clock cycles
- • SMP = 110: 247.5 ADC clock cycles
- • SMP = 111: 640.5 ADC clock cycles
The total conversion time is calculated as follows:
Example:
With \(F_{\text{adc\_ker\_ck}} = 30 \text{ MHz}\) and a sampling time of 2.5 ADC clock cycles:
The ADC notifies the end of the sampling phase by setting the status bit EOSMP (only for regular conversion).
Note: Depending on the ADC conversion mode, the real sampling time can vary compared to the SMP value programmed above, while the equivalent total conversion time (\(T_{\text{CONV}}\)) does not change:
- • For the first conversion in scan or continuous mode and all the conversions in discontinuous mode, the real sampling time is 0.5 clock cycle less compared to the value configured above.
- • For the second and subsequent conversions in scan or continuous mode, 0.5 cycle is added to the configured sampling time. This additional 0.5 clock cycle overlaps with the previous conversion cycle.
Constraints on the sampling time
For each channel, SMP[2:0] bits must be programmed to respect a minimum sampling time as specified in the ADC characteristics section of the datasheets.
Bulb sampling mode
When the BULB bit is set in ADC register, the sampling period starts immediately after the last ADC conversion. A hardware or software trigger starts the conversion after the sampling time has been programmed in ADC_SMPR1 register. The very first ADC conversion, after the ADC is enabled, is performed with the sampling time programmed in SMP bits. The bulb mode is effective starting from the second conversion.
The maximum sampling time is limited (refer to the ADC characteristics section of the datasheet).
The bulb mode is neither compatible with the continuous conversion mode nor with the injected channel conversion.
When the BULB bit is set, it is not allowed to set SMPTRIG bit in ADC_CFGR2.
Figure 233. Bulb mode timing diagram

The diagram illustrates the timing of ADC states and triggers for two modes:
- Normal (discontinuous) mode: Shows a sequence of ADC states: idle, sample, conversion, idle, sample, conversion, idle. A trigger signal (a single pulse) starts the first sample period.
- BULB (continuous) mode: Shows a sequence of ADC states: idle, sample, conversion, sample, conversion, sample. A trigger signal (a single pulse) starts the first sample period. The sampling time for the subsequent samples is indicated by a double-headed arrow labeled "Sampling time programmed in SMP bits".
MSv46157V2
Sampling time control trigger mode
When the SMPTRIG bit is set, the sampling time programmed through SMPx bits is not applicable. The sampling time is controlled by the trigger signal edge.
When a hardware trigger is selected, each rising edge of the trigger signal starts the sampling period. A falling edge ends the sampling period and starts the conversion.
When a software trigger is selected, the software trigger is not the ADSTART bit in ADC_CR but the SWTRIG bit. SWTRIG bit has to be set to start the sampling period, and the SWTRIG bit has to be cleared to end the sampling period and start the conversion.
The maximum sampling time is limited (refer to the ADC characteristics section of the datasheet).
This mode is neither compatible with the continuous conversion mode, nor with the injected channel conversion.
When SMPTRIG bit is set, it is not allowed to set BULB bit.
I/O analog switch voltage booster
The resistance of the I/O analog switches increases when the \(V_{DDA}\) voltage is too low. The sampling time must consequently be adapted accordingly (refer to the device datasheet for the corresponding electrical characteristics). This resistance can be minimized at low \(V_{DDA}\).
by enabling an internal voltage booster through BOOSTE bit or by selecting a \(V_{DD}\) booster voltage (if \(V_{DD} > 2.7\) V) through the ADV_READY bit of the PWR_PMCR register.
SMPPLUS control bit
The SMPPLUS bit can be used to change the sampling time from 2.5 ADC clock cycles to 3.5 ADC clock cycles.
27.4.13 Single conversion mode (CONT = 0)
In single conversion mode, the ADC performs once all the conversions of the channels. This mode is started with the CONT bit at 0 by either:
- • Setting the ADSTART bit in the ADC_CR register (for a regular channel)
- • Setting the JADSTART bit in the ADC_CR register (for an injected channel)
- • External hardware trigger event (for a regular or injected channel)
Inside the regular sequence, after each conversion is complete:
- • The converted data are stored into the 16-bit ADC_DR register
- • The EOC (end of regular conversion) flag is set
- • An interrupt is generated if the EOCIE bit is set
Inside the injected sequence, after each conversion is complete:
- • The converted data are stored into one of the four 16-bit ADC_JDRy registers
- • The JEOC (end of injected conversion) flag is set
- • An interrupt is generated if the JEOCIE bit is set
After the regular sequence is complete:
- • The EOS (end of regular sequence) flag is set
- • An interrupt is generated if the EOSIE bit is set
After the injected sequence is complete:
- • The JEOS (end of injected sequence) flag is set
- • An interrupt is generated if the JEOSIE bit is set
Then the ADC stops until a new external regular or injected trigger occurs or until bit ADSTART or JADSTART is set again.
Note: To convert a single channel, program a sequence with a length of 1.
27.4.14 Continuous conversion mode (CONT = 1)
This mode applies to regular channels only.
In continuous conversion mode, when a software or hardware regular trigger event occurs, the ADC performs once all the regular conversions of the channels and then automatically restarts and continuously converts each conversions of the sequence. This mode is started with the CONT bit at 1 either by external trigger or by setting the ADSTART bit in the ADC_CR register.
Inside the regular sequence, after each conversion is complete:
- • The converted data are stored into the 16-bit ADC_DR register
- • The EOC (end of conversion) flag is set
- • An interrupt is generated if the EOCIE bit is set
After the sequence of conversions is complete:
- • The EOS (end of sequence) flag is set
- • An interrupt is generated if the EOSIE bit is set
Then, a new sequence restarts immediately and the ADC continuously repeats the conversion sequence.
Note: To convert a single channel, program a sequence with a length of 1.
It is not possible to have both discontinuous mode and continuous mode enabled: it is forbidden to set both DISCEN = 1 and CONT = 1.
Injected channels cannot be converted continuously. The only exception is when an injected channel is configured to be converted automatically after regular channels in continuous mode (using JAUTO bit), refer to Auto-injection mode section).
27.4.15 Starting conversions (ADSTART, JADSTART)
Software starts ADC regular conversions by setting ADSTART = 1.
When ADSTART is set, the conversion starts:
- • Immediately: if EXTEN = 0x0 (software trigger)
- • At the next active edge of the selected regular hardware trigger: if EXTEN is not equal to 0x0
Software starts ADC injected conversions by setting JADSTART = 1.
When JADSTART is set, the conversion starts:
- • Immediately, if JEXTEN = 0x0 (software trigger)
- • At the next active edge of the selected injected hardware trigger: if JEXTEN is not equal to 0x0
Note: In auto-injection mode (JAUTO = 1), use ADSTART bit to start the regular conversions followed by the auto-injected conversions (JADSTART must be kept cleared).
ADSTART and JADSTART also provide information on whether any ADC operation is currently ongoing. It is possible to re-configure the ADC while ADSTART = 0 and JADSTART = 0 are both true, indicating that the ADC is idle.
ADSTART is cleared by hardware:
- • In single mode with software regular trigger (CONT = 0, EXTSEL = 0x0)
- – At any end of regular conversion sequence (EOS assertion) or at any end of subgroup processing if DISCEN = 1
- • In all cases (CONT = x, EXTSEL = x)
- – After execution of the ADSTP procedure asserted by the software.
Note: In continuous mode (CONT = 1), ADSTART is not cleared by hardware with the assertion of EOS because the sequence is automatically relaunched.
When a hardware trigger is selected in single mode (CONT = 0 and EXTSEL ≠ 0x00), ADSTART is not cleared by hardware with the assertion of EOS to help the software which does not need to reset ADSTART again for the next hardware trigger event. This ensures that no further hardware triggers are missed.
JADSTART is cleared by hardware:
- • In single mode with software injected trigger (JEXTSEL = 0x0)
- – At any end of injected conversion sequence (JEOS assertion) or at any end of subgroup processing if JDISCEN = 1
- • in all cases (JEXTSEL = x)
- – After execution of the JADSTP procedure asserted by the software.
Note: When the software trigger is selected, ADSTART bit should not be set if the EOC flag is still high.
27.4.16 ADC timing
The elapsed time between the start of a conversion and the end of conversion is the sum of the configured sampling time plus the successive approximation time depending on data resolution:
Figure 234. Analog-to-digital conversion time

The diagram illustrates the timing sequence for an analog-to-digital conversion. It shows the following signals and their states:
- ADC state: Transitions from RDY to Sampling Ch(N), then to Converting Ch(N), and finally to Sampling Ch(N+1).
- Analog channel: Shows the input channel Ch(N) during sampling and conversion, and Ch(N+1) during sampling.
- Internal S/H: Shows the sampling and holding of the analog input. It samples AIN(N) during the sampling phase and holds it during the conversion phase. It then samples AIN(N+1) during the next sampling phase.
- ADSTART: A software-controlled signal that starts the conversion. It is set by software (SW) at the beginning of the sampling phase and cleared by software (SW) at the end of the conversion phase.
- EOSMP: A hardware-controlled signal that indicates the end of sampling. It is set by hardware (HW) at the end of the sampling phase and cleared by software (SW) at the end of the conversion phase.
- EOC: A hardware-controlled signal that indicates the end of conversion. It is set by hardware (HW) at the end of the conversion phase and cleared by hardware/software (HW/SW) at the end of the sampling phase.
- ADC_DR: A hardware-controlled signal that outputs the conversion data. It outputs Data N-1 during the conversion phase and Data N during the sampling phase.
Timing parameters are indicated:
- \(t_{\text{SMPL}}^{(1)}\): Sampling time, measured from the start of sampling to the end of sampling.
- \(t_{\text{SAR}}^{(2)}\): Successive approximation time, measured from the end of sampling to the end of conversion.
Indicative timings
MSv30532V2
- 1. \(T_{\text{SMPL}}\) depends on SMP[2:0].
- 2. \(T_{\text{SAR}}\) depends on RES[2:0].
27.4.17 Stopping an ongoing conversion (ADSTP, JADSTP)
The software can decide to stop regular conversions ongoing by setting ADSTP = 1 and injected conversions ongoing by setting JADSTP = 1.
Stopping conversions resets the ongoing ADC operation. Then the ADC can be reconfigured (ex: changing the channel selection or the trigger) ready for a new operation.
Note that it is possible to stop injected conversions while regular conversions are still operating and vice-versa. This allows, for instance, re-configuration of the injected conversion sequence and triggers while regular conversions are still operating (and vice-versa).
When the ADSTP bit is set by software, any ongoing regular conversion is aborted with partial result discarded (ADC_DR register is not updated with the current conversion).
When the JADSTP bit is set by software, any ongoing injected conversion is aborted with partial result discarded (ADC_JDRy register is not updated with the current conversion). The scan sequence is also aborted and reset (meaning that relaunching the ADC would restart a new sequence).
Once this procedure is complete, bits ADSTP/ADSTART (in case of regular conversion), or JADSTP/JADSTART (in case of injected conversion) are cleared by hardware and the software must poll ADSTART (or JADSTART) until the bit is reset before assuming the ADC is completely stopped.
Note: In auto-injection mode (JAUTO = 1), setting ADSTP bit aborts both regular and injected conversions (JADSTP must not be used).
Figure 235. Stopping ongoing regular conversions

MSv30533V2
Figure 236. Stopping ongoing regular and injected conversions

The diagram illustrates the timing for stopping ongoing regular and injected conversions. It shows the following signals and events:
- ADC state: Shows transitions between RDY, Sample Ch(N-1), Convert Ch(N-1), RDY, Sample Ch(M), and RDY.
- Regular trigger: Indicated by arrows pointing to the start of Sample Ch(N-1) and Sample Ch(M).
- Injected trigger: Indicated by an arrow pointing to the start of Sample Ch(M).
- JADSTART: Set by SW, cleared by HW. It is active during the INJECTED CONVERSIONS ongoing period. A note states: (software is not allowed to configure injected conversions selection and triggers).
- JADSTP: Set by SW, cleared by HW. It is active during the INJECTED CONVERSIONS ongoing period.
- ADC_JDR: Contains DATA M-1.
- ADSTART: Set by SW, cleared by HW. It is active during the REGULAR CONVERSIONS ongoing period. A note states: (software is not allowed to configure regular conversions selection and triggers).
- ADSTP: Set by SW, cleared by HW. It is active during the REGULAR CONVERSIONS ongoing period.
- ADC_DR: Contains DATA N-2 and DATA N-1.
MS30534V1
27.4.18 Conversion on external trigger and trigger polarity (EXTSEL, EXTEN, JEXTSEL, JEXTEN)
A conversion or a sequence of conversions can be triggered either by software or by an external event (such as timer capture, input pins). If the EXTEN[1:0] control bits (for a regular conversion) or JEXTEN[1:0] bits (for an injected conversion) are different from 0b00, then external events are able to trigger a conversion with the selected polarity.
When the Injected Queue is enabled (bit JQDIS = 0), injected software triggers are not possible.
The regular trigger selection is effective once software has set bit ADSTART = 1 and the injected trigger selection is effective once software has set bit JADSTART = 1.
Any hardware triggers which occur while a conversion is ongoing are ignored.
- • If bit ADSTART = 0, any regular hardware triggers which occur are ignored.
- • If bit JADSTART = 0, any injected hardware triggers which occur are ignored.
Table 230 provides the correspondence between the EXTEN[1:0] and JEXTEN[1:0] values and the trigger polarity.
Table 230. Configuring the trigger polarity for regular external triggers
| EXTEN[1:0] | Source |
|---|---|
| 00 | Hardware Trigger detection disabled, software trigger detection enabled |
| 01 | Hardware Trigger with detection on the rising edge |
| 10 | Hardware Trigger with detection on the falling edge |
| 11 | Hardware Trigger with detection on both the rising and falling edges |
Note: The polarity of the regular trigger cannot be changed on-the-fly.
Table 231. Configuring the trigger polarity for injected external triggers| JEXTEN[1:0] | Source |
|---|---|
| 00 |
|
| 01 | Hardware Trigger with detection on the rising edge |
| 10 | Hardware Trigger with detection on the falling edge |
| 11 | Hardware Trigger with detection on both the rising and falling edges |
Note: The polarity of the injected trigger can be anticipated and changed on-the-fly when the queue is enabled (JQDIS = 0). Refer to Section 27.4.21: Queue of context for injected conversions.
The EXTSEL and JEXTSEL control bits select which out of 32 possible events can trigger conversion for the regular and injected groups.
A regular group conversion can be interrupted by an injected trigger.
Note: The regular trigger selection cannot be changed on-the-fly. The injected trigger selection can be anticipated and changed on-the-fly. Refer to Section 27.4.21: Queue of context for injected conversions on page 1106.
Figure 237. Triggers shared between ADC master and slave
The diagram illustrates the trigger sharing mechanism between an ADC Master and an ADC Slave. It shows two main sections: 'Regular sequencer triggers' and 'Injected sequencer triggers'.
- Regular sequencer triggers: A vertical bus on the left provides triggers
adc_ext_trg0throughadc_ext_trg31. These are connected to the 'External regular trigger' input of both the ADC MASTER and ADC SLAVE. The selection is controlled by theEXTSEL[3:0]register in each block. - Injected sequencer triggers: A similar vertical bus provides triggers
adc_jext_trg0throughadc_jext_trg31. These are connected to the 'External injected trigger' input of both the ADC MASTER and ADC SLAVE. The selection is controlled by theJEXTSEL[4:0]register in each block. - ADC MASTER: Contains the
EXTSEL[3:0]andJEXTSEL[4:0]registers, which select the appropriate trigger from the shared buses. - ADC SLAVE: Similarly contains its own
EXTSEL[3:0]andJEXTSEL[4:0]registers for independent trigger selection.
MSv46156V1
Refer to Table ADC interconnection in Section 27.4.2: ADC pins and internal signals for the list of all the external triggers that can be used for regular conversion.
27.4.19 Injected channel management
Triggered injection mode
To use triggered injection, the JAUTO bit in the ADC_CFGR register must be cleared.
- 1. Start the conversion of a group of regular channels either by an external trigger or by setting the ADSTART bit in the ADC_CR register.
- 2. If an external injected trigger occurs, or if the JADSTART bit in the ADC_CR register is set during the conversion of a regular group of channels, the current conversion is reset and the injected channel sequence switches are launched (all the injected channels are converted once).
- 3. Then, the regular conversion of the regular group of channels is resumed from the last interrupted regular conversion.
- 4. If a regular event occurs during an injected conversion, the injected conversion is not interrupted but the regular sequence is executed at the end of the injected sequence.
- Figure 238 shows the corresponding timing diagram.
Note: When using triggered injection, one must ensure that the interval between trigger events is longer than the injection sequence. For instance, if the sequence length is 30 ADC clock cycles (that is two conversions with a sampling time of 2.5 clock periods), the minimum interval between triggers must be 31 ADC clock cycles.
Auto-injection mode
If the JAUTO bit in the ADC_CFGR register is set, then the channels in the injected group are automatically converted after the regular group of channels. This can be used to convert a sequence of up to 20 conversions programmed in the ADC_SQRy and ADC_JSQR registers.
In this mode, the ADSTART bit in the ADC_CR register must be set to start regular conversions, followed by injected conversions (JADSTART must be kept cleared). Setting the ADSTP bit aborts both regular and injected conversions (JADSTP bit must not be used).
In this mode, external trigger on injected channels must be disabled.
If the CONT bit is also set in addition to the JAUTO bit, regular channels followed by injected channels are continuously converted.
Note: It is not possible to use both the auto-injected and discontinuous modes simultaneously. When the DMA is used for exporting regular sequencer's data in JAUTO mode, it is necessary to program it in circular mode. If the single-shot mode is selected, the JAUTO sequence is stopped upon DMA Transfer Complete event.
Figure 238. Injected conversion latency

- 1. The maximum latency value can be found in the electrical characteristics of the device datasheet.
27.4.20 Discontinuous mode (DISCEN, DISCNUM, JDISCEN)
Regular group mode
This mode is enabled by setting the DISCEN bit in the ADC_CFGR register.
It is used to convert a short sequence (subgroup) of n conversions (n ≤ 8) that is part of the sequence of conversions selected in the ADC_SQRy registers. The value of n is specified by writing to the DISCNUM[2:0] bits in the ADC_CFGR register.
When an external trigger occurs, it starts the next n conversions selected in the ADC_SQRy registers until all the conversions in the sequence are done. The total sequence length is defined by the L[3:0] bits in the ADC_SQR1 register.
Example:
- • DISCEN = 1, n = 3, channels to be converted = 1, 2, 3, 6, 7, 8, 9, 10, 11
- – 1st trigger: channels converted are 1, 2, 3 (an EOC event is generated at each conversion).
- – 2nd trigger: channels converted are 6, 7, 8 (an EOC event is generated at each conversion).
- – 3rd trigger: channels converted are 9, 10, 11 (an EOC event is generated at each conversion) and an EOS event is generated after the conversion of channel 11.
- – 4th trigger: channels converted are 1, 2, 3 (an EOC event is generated at each conversion).
- – ...
- • DISCEN = 0, channels to be converted = 1, 2, 3, 6, 7, 8, 9, 10, 11
- – 1st trigger: the complete sequence is converted: channel 1, then 2, 3, 6, 7, 8, 9, 10 and 11. Each conversion generates an EOC event and the last one also generates an EOS event.
- – All the next trigger events relaunch the complete sequence.
Note: The channel numbers referred to in the above example might not be available on all microcontrollers.
When a regular group is converted in discontinuous mode, no rollover occurs (the last subgroup of the sequence can have less than n conversions).
When all subgroups are converted, the next trigger starts the conversion of the first subgroup. In the example above, the 4th trigger reconverts the channels 1, 2 and 3 in the 1st subgroup.
It is not possible to have both discontinuous mode and continuous mode enabled. In this case (if DISCEN = 1, CONT = 1), the ADC behaves as if continuous mode was disabled.
Injected group mode
This mode is enabled by setting the JDISCEN bit in the ADC_CFGR register. It converts the sequence selected in the ADC_JSQR register, channel by channel, after an external injected trigger event. This is equivalent to discontinuous mode for regular channels where 'n' is fixed to 1.
When an external trigger occurs, it starts the next channel conversions selected in the ADC_JSQR registers until all the conversions in the sequence are done. The total sequence length is defined by the JL[1:0] bits in the ADC_JSQR register.
Example:
- • JDISCEN = 1, channels to be converted = 1, 2, 3
- – 1st trigger: channel 1 converted (a JEOC event is generated)
- – 2nd trigger: channel 2 converted (a JEOC event is generated)
- – 3rd trigger: channel 3 converted and a JEOC event + a JEOS event are generated
- – ...
Note: The channel numbers referred to in the above example might not be available on all microcontrollers.
When all injected channels have been converted, the next trigger starts the conversion of the first injected channel. In the example above, the 4th trigger reconverts the 1st injected channel 1.
It is not possible to use both auto-injected mode and discontinuous mode simultaneously: the bits DISCEN and JDISCEN must be kept cleared by software when JAUTO is set.
27.4.21 Queue of context for injected conversions
A queue of context is implemented to anticipate up to 2 contexts for the next injected sequence of conversions. JQDIS bit of ADC_CFGR register must be reset to enable this feature. Only hardware-triggered conversions are possible when the context queue is enabled.
This context consists of:
- • Configuration of the injected triggers (bits JEXTEN[1:0] and JEXTSEL bits in ADC_JSQR register)
- • Definition of the injected sequence (bits JSQx[4:0] and JL[1:0] in ADC_JSQR register)
All the parameters of the context are defined into a single register ADC_JSQR and this register implements a queue of 2 buffers, allowing the bufferization of up to 2 sets of parameters:
- • The ADC_JSQR register can be written at any moment even when injected conversions are ongoing.
- • Each data written into the ADC_JSQR register is stored into the Queue of context.
- • At the beginning, the Queue is empty and the first write access into the ADC_JSQR register immediately changes the context and the ADC is ready to receive injected triggers.
- • Once an injected sequence is complete, the Queue is consumed and the context changes according to the next ADC_JSQR parameters stored in the Queue. This new context is applied for the next injected sequence of conversions.
- • A Queue overflow occurs when writing into register ADC_JSQR while the Queue is full. This overflow is signaled by the assertion of the flag JQOVF. When an overflow occurs, the write access of ADC_JSQR register which has created the overflow is ignored and the queue of context is unchanged. An interrupt can be generated if bit JQOVFIE is set.
- • Two possible behaviors are possible when the Queue becomes empty, depending on the value of the control bit JQM of register ADC_CFGR:
- – If JQM = 0, the Queue is empty just after enabling the ADC, but then it can never be empty during run operations: the Queue always maintains the last active context and any further valid start of injected sequence is served according to the last active context.
- – If JQM = 1, the Queue can be empty after the end of an injected sequence or if the Queue is flushed. When this occurs, there is no more context in the queue and hardware triggers are disabled. Therefore, any further hardware injected triggers are ignored until the software re-writes a new injected context into ADC_JSQR register.
- • Reading ADC_JSQR register returns the current ADC_JSQR context which is active at that moment. When the ADC_JSQR context is empty, JSQi is read as 0x00.
- • The Queue is flushed when stopping injected conversions by setting JADSTP = 1 or when disabling the ADC by setting ADDIS = 1:
- – If JQM = 0, the Queue is maintained with the last active context.
- – If JQM = 1, the Queue becomes empty and triggers are ignored.
Note: When configured in discontinuous mode (bit JDISCEN = 1), only the last trigger of the injected sequence changes the context and consumes the Queue. The 1st trigger only consumes the queue but others are still valid triggers as shown by the discontinuous mode example below (length = 3 for both contexts):
- • 1st trigger, discontinuous. Sequence 1: context 1 consumed, 1st conversion carried out
- • 2nd trigger, disc. Sequence 1: 2nd conversion.
- • 3rd trigger, discontinuous. Sequence 1: 3rd conversion.
- • 4th trigger, discontinuous. Sequence 2: context 2 consumed, 1st conversion carried out.
- • 5th trigger, discontinuous. Sequence 2: 2nd conversion.
- • 6th trigger, discontinuous. Sequence 2: 3rd conversion.
Behavior when changing the trigger or sequence context
Figure 239 and Figure 240 show the behavior of the context Queue when changing the sequence or the triggers.
Figure 239. Example of ADC_JSQR queue of context (sequence change)

- 1. Parameters:
P1: sequence of 3 conversions, hardware trigger 1
P2: sequence of 1 conversion, hardware trigger 1
P3: sequence of 4 conversions, hardware trigger 1
Figure 240. Example of ADC_JSQR queue of context (trigger change)

- 1. Parameters:
P1: sequence of 2 conversions, hardware trigger 1
P2: sequence of 1 conversion, hardware trigger 2
P3: sequence of 4 conversions, hardware trigger 1
Queue of context: Behavior when a queue overflow occurs
The Figure 241 and Figure 242 show the behavior of the context Queue if an overflow occurs before or during a conversion.
Figure 241. Example of ADC_JSQR queue of context with overflow before conversion

MS30538V4
- 1. Parameters:
- P1: sequence of 2 conversions, hardware trigger 1
- P2: sequence of 1 conversion, hardware trigger 2
- P3: sequence of 3 conversions, hardware trigger 1
- P4: sequence of 4 conversions, hardware trigger 1
Figure 242. Example of ADC_JSQR queue of context with overflow during conversion

MS30539V4
- 1. Parameters:
- P1: sequence of 2 conversions, hardware trigger 1
- P2: sequence of 1 conversion, hardware trigger 2
- P3: sequence of 3 conversions, hardware trigger 1
- P4: sequence of 4 conversions, hardware trigger 1
It is recommended to manage the queue overflows as described below:
- • After each P context write into ADC_JSQR register, flag JQOVF shows if the write has been ignored or not (an interrupt can be generated).
- • Avoid Queue overflows by writing the third context (P3) only once the flag JEOS of the previous context P2 has been set. This ensures that the previous context has been consumed and that the queue is not full.
Queue of context: Behavior when the queue becomes empty
Figure 243 and Figure 244 show the behavior of the context Queue when the Queue becomes empty in both cases JQM = 0 or 1.
Figure 243. Example of ADC_JSQR queue of context with empty queue (case JQM = 0)

- 1. Parameters:
- P1: sequence of 1 conversion, hardware trigger 1
- P2: sequence of 1 conversion, hardware trigger 1
- P3: sequence of 1 conversion, hardware trigger 1
Note: When writing P3, the context changes immediately. However, because of internal resynchronization, there is a latency and if a trigger occurs just after or before writing P3, it can happen that the conversion is launched considering the context P2. To avoid this situation, the user must ensure that there is no ADC trigger happening when writing a new context that applies immediately.
Figure 244. Example of ADC_JSQR queue of context with empty queue (JQM = 1)

- Parameters:
P1: sequence of 1 conversion, hardware trigger 1
P2: sequence of 1 conversion, hardware trigger 1
P3: sequence of 1 conversion, hardware trigger 1
Flushing the queue of context
The figures below show the behavior of the context Queue in various situations when the queue is flushed.
Figure 245. Flushing ADC_JSQR queue of context by setting JADSTP = 1 (JQM = 0) - JADSTP occurs during an ongoing conversion.

- Parameters:
P1: sequence of 1 conversion, hardware trigger 1
P2: sequence of 1 conversion, hardware trigger 1
P3: sequence of 1 conversion, hardware trigger 1
Figure 246. Flushing ADC_JSQR queue of context by setting JADSTP = 1 (JQM = 0) - JADSTP occurs during an ongoing conversion and a new trigger occurs

The diagram illustrates the behavior of the ADC when JADSTP is set to 1 while a conversion is ongoing. The ADC_JSQR queue initially contains P1 and P2. When JADSTP is set by software (S/W), the queue is flushed, and P2 is lost, leaving P1 as the active context. A hardware trigger (Trigger 1) occurs during this time, which is ignored. The ADC state transitions from RDY to Conv1, then to STP (Aborted), and back to RDY. After the abort, a new trigger occurs, and the queue is flushed again, maintaining P1. The ADC state then transitions to Conversion1 and back to RDY.
MS30543V2
- Parameters:
P1: sequence of 1 conversion, hardware trigger 1
P2: sequence of 1 conversion, hardware trigger 1
P3: sequence of 1 conversion, hardware trigger 1
Figure 247. Flushing ADC_JSQR queue of context by setting JADSTP = 1 (JQM = 0) - JADSTP occurs outside an ongoing conversion

The diagram illustrates the behavior of the ADC when JADSTP is set to 1 outside of an ongoing conversion. The ADC_JSQR queue initially contains P1 and P2. When JADSTP is set by software (S/W), the queue is flushed, and P2 is lost, leaving P1 as the active context. The ADC state transitions from RDY to STP and back to RDY. After the flush, a new trigger occurs, and the queue is flushed again, maintaining P1. The ADC state then transitions to Conversion1 and back to RDY.
MS30544V3
- Parameters:
P1: sequence of 1 conversion, hardware trigger 1
P2: sequence of 1 conversion, hardware trigger 1
P3: sequence of 1 conversion, hardware trigger 1
Figure 248. Flushing ADC_JSQR queue of context by setting JADSTP = 1 (JQM = 1)

MS30545V2
- 1. Parameters:
P1: sequence of 1 conversion, hardware trigger 1
P2: sequence of 1 conversion, hardware trigger 1
P3: sequence of 1 conversion, hardware trigger 1
Figure 249. Flushing ADC_JSQR queue of context by setting ADDIS = 1 (JQM = 0)

MS30546V2
- 1. Parameters:
P1: sequence of 1 conversion, hardware trigger 1
P2: sequence of 1 conversion, hardware trigger 1
P3: sequence of 1 conversion, hardware trigger 1
Figure 250. Flushing ADC_JSQR queue of context by setting ADDIS = 1 (JQM = 1)

MS30547V4
- Parameters:
- P1: sequence of 1 conversion, hardware trigger 1
- P2: sequence of 1 conversion, hardware trigger 1
- P3: sequence of 1 conversion, hardware trigger 1
Queue of context: Starting the ADC with an empty queue
The following procedure must be followed to start ADC operation with an empty queue, in case the first context is not known at the time the ADC is initialized. This procedure is only applicable when JQM bit is reset:
- Write a dummy ADC_JSQR with JEXTEN not equal to 0 (otherwise triggering a software conversion)
- Set JADSTART
- Set JADSTP
- Wait until JADSTART is reset
- Set JADSTART.
Disabling the queue
It is possible to disable the queue by setting bit JQDIS = 1 into the ADC_CFGR register.
27.4.22 Programmable resolution (RES) - fast conversion mode
It is possible to perform faster conversion by reducing the ADC resolution.
The resolution can be configured to be either 12, 10, 8, or 6 bits by programming the control bits RES[1:0]. Figure 255, Figure 256, Figure 257 and Figure 258 show the conversion result format with respect to the resolution as well as to the data alignment.
Lower resolution allows faster conversion time for applications where high-data precision is not required. It reduces the conversion time spent by the successive approximation steps according to Table 232.
Table 232.\(T_{SAR}\) timings depending on resolution| RES (bits) | \(T_{SAR}\) (ADC clock cycles) | \(T_{SAR}\) (ns) at \(F_{ADC} = 30\) MHz | \(T_{CONV}\) (ADC clock cycles) (with Sampling Time = 2.5 ADC clock cycles) | \(T_{CONV}\) (ns) at \(F_{ADC} = 30\) MHz |
|---|---|---|---|---|
| 12 | 12.5 ADC clock cycles | 416.67 ns | 15 ADC clock cycles | 500.0 ns |
| 10 | 10.5 ADC clock cycles | 350.0 ns | 13 ADC clock cycles | 433.33 ns |
| 8 | 8.5 ADC clock cycles | 203.33 ns | 11 ADC clock cycles | 366.67 ns |
| 6 | 6.5 ADC clock cycles | 216.67 ns | 9 ADC clock cycles | 300.0 ns |
27.4.23 End of conversion, end of sampling phase (EOC, JEOC, EOSMP)
The ADC notifies the application for each end of regular conversion (EOC) event and each injected conversion (JEOC) event.
The ADC sets the EOC flag as soon as a new regular conversion data is available in the ADC_DR register. An interrupt can be generated if bit EOCIE is set. EOC flag is cleared by the software either by writing 1 to it or by reading ADC_DR.
The ADC sets the JEOC flag as soon as a new injected conversion data is available in one of the ADC_JDRy register. An interrupt can be generated if bit JEOCIE is set. JEOC flag is cleared by the software either by writing 1 to it or by reading the corresponding ADC_JDRy register.
The ADC also notifies the end of Sampling phase by setting the status bit EOSMP (for regular conversions only). EOSMP flag is cleared by software by writing 1 to it. An interrupt can be generated if bit EOSMPIE is set.
27.4.24 End of conversion sequence (EOS, JEOS)
The ADC notifies the application for each end of regular sequence (EOS) and for each end of injected sequence (JEOS) event.
The ADC sets the EOS flag as soon as the last data of the regular conversion sequence is available in the ADC_DR register. An interrupt can be generated if bit EOSIE is set. EOS flag is cleared by the software either by writing 1 to it.
The ADC sets the JEOS flag as soon as the last data of the injected conversion sequence is complete. An interrupt can be generated if bit JEOSIE is set. JEOS flag is cleared by the software either by writing 1 to it.
27.4.25 Timing diagrams example (single/continuous modes, hardware/software triggers)
Figure 251. Single conversions of a sequence, software trigger

- 1. EXTEN = 0x0, CONT = 0
- 2. Channels selected = 1,9, 10, 17; AUTDLY = 0.
Figure 252. Continuous conversion of a sequence, software trigger

- 1. EXTEN = 0x0, CONT = 1
- 2. Channels selected = 1,9, 10, 17; AUTDLY = 0.
Figure 253. Single conversions of a sequence, hardware trigger

MS31013V2
- 1. TRGx (over-frequency) is selected as trigger source, EXTEN = 01, CONT = 0
- 2. Channels selected = 1, 2, 3, 4; AUTDLY = 0.
Figure 254. Continuous conversions of a sequence, hardware trigger

MS31014V2
- 1. TRGx is selected as trigger source, EXTEN = 10, CONT = 1
- 2. Channels selected = 1, 2, 3, 4; AUTDLY = 0.
27.4.26 Data management
Data register, data alignment and offset (ADC_DR, OFFSET, OFFSET_CH, ALIGN)
Data and alignment
At the end of each regular conversion channel (when EOC event occurs), the result of the converted data is stored into the ADC_DR data register which is 16 bits wide.
At the end of each injected conversion channel (when JEOC event occurs), the result of the converted data is stored into the corresponding ADC_JDRy data register which is 16 bits wide.
The ALIGN bit in the ADC_CFGR register selects the alignment of the data stored after conversion. Data can be right- or left-aligned as shown in Figure 255, Figure 256, Figure 257 and Figure 258.
Special case: when left-aligned, the data are aligned on a half-word basis except when the resolution is set to 6-bit. In that case, the data are aligned on a byte basis as shown in Figure 257 and Figure 258.
Note: Left-alignment is not supported in oversampling mode. When ROVSE and/or JOVSE bit is set, the ALIGN bit value is ignored and the ADC only provides right-aligned data.
Offset
An offset y (y = 1,2,3,4) can be applied to a channel by setting the bit OFFSET_EN = 1 into ADC_OF Ry register. The channel to which the offset is to be applied is programmed into the bits OFFSET_CH[4:0] of ADC_OF Ry register. In this case, the converted value is decreased by the user-defined offset written in the bits OFFSET[11:0]. The result may be a negative value so the read data is signed and the SEXT bit represents the extended sign value.
Note: Offset correction is not supported in oversampling mode. When ROVSE and/or JOVSE bit is set, the value of the OFFSET_EN bit in ADC_OF Ry register is ignored (considered as reset).
Table 235 describes how the comparison is performed for all the possible resolutions for analog watchdog 1.
Table 233. Offset computation versus data resolution
| Resolution (bits RES[1:0]) | Subtraction between raw converted data and offset | Result | Comments | |
|---|---|---|---|---|
| Raw converted Data, left aligned | Offset | |||
| 00: 12-bit | DATA[11:0] | OFFSET[11:0] | Signed 12-bit data | - |
| 01: 10-bit | DATA[11:2],00 | OFFSET[11:0] | Signed 10-bit data | The user must configure OFFSET[1:0] to "00" |
Table 233. Offset computation versus data resolution (continued)
| Resolution (bits RES[1:0]) | Subtraction between raw converted data and offset | Result | Comments | |
|---|---|---|---|---|
| Raw converted Data, left aligned | Offset | |||
| 10: 8-bit | DATA[11:4],00 00 | OFFSET[11:0] | Signed 8-bit data | The user must configure OFFSET[3:0] to “0000” |
| 11: 6-bit | DATA[11:6],00 0000 | OFFSET[11:0] | Signed 6-bit data | The user must configure OFFSET[5:0] to “000000” |
When reading data from ADC_DR (regular channel) or from ADC_JDRy (injected channel, y = 1,2,3,4) corresponding to the channel “i”:
- • If one of the offsets is enabled (bit OFFSET_EN = 1) for the corresponding channel, the read data is signed.
- • If none of the four offsets is enabled for this channel, the read data is not signed.
Figure 255, Figure 256, Figure 257 and Figure 258 show alignments for signed and unsigned data.
Figure 255. Right alignment (offset disabled, unsigned value)

12-bit data
| bit15 | bit7 | bit0 | |||||||||||||
| 0 | 0 | 0 | 0 | D11 | D10 | D9 | D8 | D7 | D6 | D5 | D4 | D3 | D2 | D1 | D0 |
10-bit data
| bit15 | bit7 | bit0 | |||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | D9 | D8 | D7 | D6 | D5 | D4 | D3 | D2 | D1 | D0 |
8-bit data
| bit15 | bit7 | bit0 | |||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | D7 | D6 | D5 | D4 | D3 | D2 | D1 | D0 |
6-bit data
| bit15 | bit7 | bit0 | |||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | D5 | D4 | D3 | D2 | D1 | D0 |
MS31015V1
Figure 256. Right alignment (offset enabled, signed value)

12-bit data
| bit15 | bit7 | bit0 | ||||||||||||||||
| SEXT | SEXT | SEXT | SEXT | D11 | D10 | D9 | D8 | D7 | D6 | D5 | D4 | D3 | D2 | D1 | D0 | |||
10-bit data
| bit15 | bit7 | bit0 | |||||||||||||
| SEXT | SEXT | SEXT | SEXT | SEXT | SEXT | D9 | D8 | D7 | D6 | D5 | D4 | D3 | D2 | D1 | D0 |
8-bit data
| bit15 | bit7 | bit0 | |||||||||||||
| SEXT | SEXT | SEXT | SEXT | SEXT | SEXT | SEXT | SEXT | D7 | D6 | D5 | D4 | D3 | D2 | D1 | D0 |
6-bit data
| bit15 | bit7 | bit0 | |||||||||||||
| SEXT | SEXT | SEXT | SEXT | SEXT | SEXT | SEXT | SEXT | SEXT | SEXT | D5 | D4 | D3 | D2 | D1 | D0 |
MS31016V1
Figure 257. Left alignment (offset disabled, unsigned value)

12-bit data
| bit15 | bit7 | bit0 | ||||||||||||||||
| D11 | D10 | D9 | D8 | D7 | D6 | D5 | D4 | D3 | D2 | D1 | D0 | 0 | 0 | 0 | 0 | |||
10-bit data
| bit15 | bit7 | bit0 | |||||||||||||
| D9 | D8 | D7 | D6 | D5 | D4 | D3 | D2 | D1 | D0 | 0 | 0 | 0 | 0 | 0 | 0 |
8-bit data
| bit15 | bit7 | bit0 | |||||||||||||
| D7 | D6 | D5 | D4 | D3 | D2 | D1 | D0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
6-bit data
| bit15 | bit7 | bit0 | |||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | D5 | D4 | D3 | D2 | D1 | D0 | 0 | 0 |
MS31017V1
Figure 258. Left alignment (offset enabled, signed value)

12-bit data
| bit15 | bit7 | bit0 | ||||||||||||||
| SEXT | D11 | D10 | D9 | D8 | D7 | D6 | D5 | D4 | D3 | D2 | D1 | D0 | 0 | 0 | 0 | |
10-bit data
| bit15 | bit7 | bit0 | ||||||||||||||
| SEXT | D9 | D8 | D7 | D6 | D5 | D4 | D3 | D2 | D1 | D0 | 0 | 0 | 0 | 0 | 0 | |
8-bit data
| bit15 | bit7 | bit0 | ||||||||||||||
| SEXT | D7 | D6 | D5 | D4 | D3 | D2 | D1 | D0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
6-bit data
| bit15 | bit7 | bit0 | ||||||||||||||
| SEXT | SEXT | SEXT | SEXT | SEXT | SEXT | SEXT | SEXT | SEXT | D5 | D4 | D3 | D2 | D1 | D0 | 0 | |
MS31018V1
Offset compensation
When SATEN bit is set in ADC_OFRy register during offset operation, data are unsigned. All the offset data saturate at 0x000 (in 12-bit mode). When OFFSETPOS bit is set, the offset direction is positive and the data saturate at 0xFFF (in 12-bit mode). In 8-bit mode, data saturate at 0x00 and 0xFF, respectively.
The analog watchdog comparison is performed before the offset compensation.
ADC overrun (OVR, OVRMOD)
The overrun flag (OVR) notifies when the regular converted data has not been read (by the CPU or the DMA) before ADC_DR FIFO (three stages) is overflowed.
The OVR flag is set when a new conversion completes while ADC_CR register FIFO was full. An interrupt is generated if OVRIE bit is set to 1.
When an overrun condition occurs, the ADC is still operating and can continue converting unless the software decides to stop and reset the sequence by setting ADSTP to 1. Since ADC_DR FIFO features three stages, up to three data are stored in the FIFO.
OVR flag is cleared by software by writing 1 to it.
It is possible to configure if data is preserved or overwritten when an overrun event occurs by programming the control bit OVRMOD:
- • OVRMOD = 0: The overrun event preserves the data register from being overwritten: the old data is maintained up to ADC_DR FIFO depth (three stages) and the new conversion is discarded and lost. In this mode, ADC_DR FIFO is disabled. If the FIFO is full, any further conversion is performed but the resulting data is also discarded. EOC
| special error flag defined in Note: management described i n OTP block | Table 3 Section 5.5.3 AHB address | 0 . An entire OT irreversible . | can be used to Lock bit |
|---|---|---|---|
| SEXT D11 D10 D 9 10-bit data | D8 D7 D6 D5 D | 4 D 3 D2 D1 | D0 0 0 0 |
| bit15 | bit | 7 | bit0 |
| SEXT D9 D8 D 7 8-bit data | D6 D5 D4 D3 D | 2 D 1 D0 0 | 0 0 0 0 |
| bit15 | bit | 7 | bit0 |
| SEXT D7 D6 D 5 6-bit data | D4 D3 D2 D1 D | 0 0 0 0 | 0 0 0 0 |
| bit15 | bit | 7 | bit0 |
| SEXT SEXT SEXT SEXT SEXT SEXT SEX | T SEXT SEXT | D 5 D4 D3 | D2 D1 D0 0 MS31018V1 |
| When an overrun condition occurs, the AD When an overrun condition occurs, the AD OVR flag is cleared by software by writing 1 to it. | C is still operating and can continue converting | ||
| by programming the control bit OVRMOD: • OVRMOD = 0: The overrun event preserves the data register from being overwritten: | |||
| the old data is maintained up to ADC_DR FIF | O depth (three stages) and the new |
- is cleared by reading ADC_DR register. However, the FIFO can still contain previously converted data.
- • OVRMOD = 1: The data register is overwritten with the last conversion result and the previous unread data is lost. In this mode, ADC_DR FIFO is disabled. If OVR remains at 1, any further conversions is performed normally and the ADC_DR register always contains the latest converted data.
Figure 259. Example of overrun (OVRMOD = 0)

The diagram illustrates the timing of an ADC overrun event when OVRMOD is set to 0. It shows the following signals and states over time:
- ADSTART: A high pulse initiates the conversion sequence.
- EOC: End of Conversion signals for each channel (CH1 to CH8).
- OVR: Overrun flag. It transitions high after the ADC_DR register is read for CH7, indicating that the FIFO is full and a new conversion result cannot be stored.
- ADSTP: Stop conversion signal, which becomes high after the overrun occurs.
- TRGx: Trigger signal that initiates the sequence.
- ADC state: A sequence of states: RDY, CH1, CH2, CH3, CH4, CH5, CH6, CH7, CH8, STOP, and back to RDY.
- ADC_DR read access: Pulses indicating when the ADC_DR register is accessed. In this example, it occurs during CH2, CH3, and CH7.
- ADC_DR: The main data register. It holds D1, D2, and D3. After the overrun, it is overwritten with D4.
- ADC_DR (FIFO_DATA): The FIFO buffer. It contains D4 and D5. D4 is the result of the conversion that caused the overrun, and D5 is the result of the next conversion.
At the bottom, there are three small diagrams showing how the ADC can be started: 'by s/w' (software), 'by h/w' (hardware), and 'triggered'. A box labeled 'Indicative timings' is also present.
MSv65305V1
Figure 260. Example of overrun (OVRMOD = 1)

The diagram illustrates the ADC operation with OVRMOD = 1. It shows the sequence of events from ADSTART to ADSTP. The ADC state transitions through RDY, CH1, CH2, CH3, CH4, CH5, CH6, CH7, STOP, and back to RDY. The ADC_DR register is read during the CH5 conversion, causing an overrun. The ADC_DR register then contains the latest data (D6). The diagram also shows the EOC, EOS, and OVR signals, and the TRGx hardware trigger.
by s/w by h/w triggered
Indicative timings
MSv31019V2
Note: There is no overrun detection on the injected channels since there is a dedicated data register for each of the four injected channels.
Managing a sequence of conversions without using the DMA
If the conversions are slow enough, the conversion sequence can be handled by the software. In this case the software must use the EOC flag and its associated interrupt to handle each data. Each time a conversion is complete, EOC is set and the ADC_DR register can be read. OVRMOD must be configured to 0 to manage overrun events or FIFO overflow as an error.
Managing conversions without using the DMA and without overrun
It may be useful to let the ADC convert one or more channels without reading the data each time (if there is an analog watchdog for instance). In this case, the OVRMOD bit must be configured to 1 and OVR flag should be ignored by the software. An overrun event does not prevent the ADC from continuing to convert and the ADC_DR register always contains the latest conversion.
Managing conversions using the DMA
Since converted channel values are stored into a unique data register, it is useful to use DMA for conversion of more than one channel. This avoids the loss of the data already stored in the ADC_DR register.
When the DMA mode is enabled (DMAEN bit set to 1 in the ADC_CFGR register in single ADC mode or MDMA different from 0b00 in dual ADC mode), a DMA request is generated after each conversion of a channel. This allows the transfer of the converted data from the ADC_DR register to the destination location selected by the software.
Despite this, if an overrun occurs (OVR = 1) because the DMA could not serve the DMA transfer request in time, the ADC stops generating DMA requests and the data corresponding to the new conversion is not transferred by the DMA. Which means that all the data transferred to the RAM can be considered as valid.
Depending on the configuration of OVRMOD bit, the data is either preserved or overwritten (refer to Section : ADC overrun (OVR, OVRMOD)).
The DMA transfer requests are blocked until the software clears the OVR bit.
Two different DMA modes are proposed depending on the application use and are configured with bit DMACFG of the ADC_CFGR register in single ADC mode, or with bit DMACFG of the ADC_CCR register in dual ADC mode:
- • DMA one shot mode (DMACFG = 0).
This mode is suitable when the DMA is programmed to transfer a fixed number of data. - • DMA circular mode (DMACFG = 1)
This mode is suitable when programming the DMA in circular mode.
DMA one shot mode (DMACFG = 0)
In this mode, the ADC generates a DMA transfer request each time a new conversion data is available and stops generating DMA requests once the DMA has reached the last DMA transfer (when a transfer complete interrupt occurs - refer to DMA section) even if a conversion has been started again.
When the DMA transfer is complete (all the transfers configured in the DMA controller have been done):
- • The content of the ADC data register is frozen.
- • Any ongoing conversion is aborted with partial result discarded.
- • No new DMA request is issued to the DMA controller. This avoids generating an overrun error if there are still conversions which are started.
- • Scan sequence is stopped and reset.
- • The DMA is stopped.
DMA circular mode (DMACFG = 1)
In this mode, the ADC generates a DMA transfer request each time a new conversion data is available in the data register, even if the DMA has reached the last DMA transfer. This allows configuring the DMA in circular mode to handle a continuous analog input data stream.
27.4.27 Managing conversions using the ADF
The ADC conversion results can be transferred directly to the audio digital filter (ADF).
In this case, the ADFCFG bit must be set to 1 and DMAEN bit must be cleared to 0.
The ADC transfers all the 16 bits of the regular data register to the ADF and resets the EOC flag once the transfer is complete.
The data format must be 16-bit signed:
ADC_DR[15:12] = sign extended
ADC_DR[11] = sign
ADC_DR[11:0] = data
To obtain 16-bit signed format in 12-bit ADC mode, the software needs to configure the OFFSET[11:0] to 0x800 after having set OFFSET_EN to 1.
Only right aligned data format is available for the ADF interface (see Figure 256: Right alignment (offset enabled, signed value)).
27.4.28 Dynamic low-power features
Auto-delayed conversion mode (AUTDLY)
The ADC implements an auto-delayed conversion mode controlled by the AUTDLY configuration bit. Auto-delayed conversions are useful to simplify the software as well as to optimize performance of an application clocked at low frequency where there would be risk of encountering an ADC overrun.
When AUTDLY = 1, a new conversion can start only if all the previous data of the same group has been treated:
- • For a regular conversion: once the ADC_DR register has been read or if the EOC bit has been cleared (see Figure 261).
- • For an injected conversion: when the JEOS bit has been cleared (see Figure 262).
This is a way to automatically adapt the speed of the ADC to the speed of the system which reads the data.
The delay is inserted after each regular conversion (whatever DISCEN = 0 or 1) and after each sequence of injected conversions (whatever JDISCEN = 0 or 1).
Note: There is no delay inserted between each conversions of the injected sequence, except after the last one.
During a conversion, a hardware trigger event (for the same group of conversions) occurring during this delay is ignored.
Note: This is not true for software triggers where it remains possible during this delay to set the bits ADSTART or JADSTART to restart a conversion: it is up to the software to read the data before launching a new conversion.
No delay is inserted between conversions of different groups (a regular conversion followed by an injected conversion or conversely):
- • If an injected trigger occurs during the automatic delay of a regular conversion, the injected conversion starts immediately (see Figure 262).
- • Once the injected sequence is complete, the ADC waits for the delay (if not ended) of the previous regular conversion before launching a new regular conversion (see Figure 264).
The behavior is slightly different in auto-injected mode (JAUTO = 1) where a new regular conversion can start only when the automatic delay of the previous injected sequence of conversion has ended (when JEOS has been cleared). This is to ensure that the software can read all the data of a given sequence before starting a new sequence (see Figure 265).
To stop a conversion in continuous auto-injection mode combined with autodelay mode (JAUTO = 1, CONT = 1 and AUTDLY = 1), follow the following procedure:
- 1. Wait until JEOS = 1 (no more conversions are restarted)
- 2. Clear JEOS,
- 3. Set ADSTP = 1
- 4. Read the regular data.
If this procedure is not respected, a new regular sequence can restart if JEOS is cleared after ADSTP has been set.
In AUTDLY mode, a hardware regular trigger event is ignored if it occurs during an already ongoing regular sequence or during the delay that follows the last regular conversion of the sequence. It is however considered pending if it occurs after this delay, even if it occurs during an injected sequence of the delay that follows it. The conversion then starts at the end of the delay of the injected sequence.
In AUTDLY mode, a hardware injected trigger event is ignored if it occurs during an already ongoing injected sequence or during the delay that follows the last injected conversion of the sequence.
Figure 261. AUTODLY = 1, regular conversion in continuous mode, software trigger

- 1. AUTDLY = 1
- 2. Regular configuration: EXTEN=0x0 (SW trigger), CONT = 1, CHANNELS = 1,2,3
- 3. Injected configuration DISABLED
Figure 262. AUTODLY = 1, regular HW conversions interrupted by injected conversions
(DISCEN = 0; JDISCEN = 0)

The diagram shows the following signals and their timing:
- Regular trigger: A series of pulses. The first is ignored, the second is not ignored (occurs during injected sequence), and the third is ignored.
- ADC state: Shows the sequence of states: RDY, CH1 (regular), DLY (CH1), CH2 (regular), DLY (CH2), CH5 (regular), CH6 (injected), CH3 (regular), DLY (CH3), CH1 (regular), DLY (CH1), and CH2 (regular).
- EOC: End of Conversion signal, indicating the end of each conversion.
- EOS: End of Sequence signal, indicating the end of the regular sequence.
- ADC_DR read access: Shows the timing for reading the ADC data register.
- ADC_DR: The ADC data register output, showing data D1, D2, D3, and D1.
- Injected trigger: A series of pulses. The first is ignored, the second is not ignored (occurs during injected sequence), and the third is ignored.
- JEOS: End of Injected Sequence signal, indicating the end of the injected sequence.
- ADC_JDR1: The ADC injected data register 1 output, showing data D5.
- ADC_JDR2: The ADC injected data register 2 output, showing data D6.
Legend:
- by s/w: Software trigger
- by h/w: Hardware trigger
- Indicative timings
MS31021V2
- AUTDLY = 1
- Regular configuration: EXTEN=0x1 (HW trigger), CONT = 0, DISCEN = 0, CHANNELS = 1, 2, 3
- Injected configuration: JEXTEN = 0x1 (HW Trigger), JDISCEN = 0, CHANNELS = 5,6
Figure 263. AUTODLY = 1, regular HW conversions interrupted by injected conversions (DISCEN = 1, JDISCEN = 1)

The diagram illustrates the interaction between regular and injected conversion sequences. The 'Regular trigger' signal shows several triggers, some of which are 'Ignored' and others 'Not ignored (occurs during injected sequence)'. The 'ADC state' signal shows the progression through various channels (CH1, CH2, CH3, CH5, CH6) and states (RDY, DLY, regular, injected). The 'EOC' (End of Conversion) and 'EOS' (End of Sequence) signals indicate the completion of conversions. The 'ADC_DR' signal shows read access to the data register, with data words D1, D2, D3, D5, and D6 being written. The 'ADC_DR' signal also shows the data being read from the register. The 'Injected trigger' signal shows triggers for the injected sequence. The 'JEOS' signal indicates the end of the injected sequence. The 'ADC_JDR1' and 'ADC_JDR2' signals show the data being written to the injected data registers. A legend at the bottom left shows 'by SW' and 'by HW' triggers. A box labeled 'Indicative timings' is at the bottom right.
MS31022V1
- 1. AUTDLY = 1
- 2. Regular configuration: EXTEN = 0x1 (HW trigger), CONT = 0, DISCEN = 1, DISCNUM = 1, CHANNELS = 1, 2, 3.
- 3. Injected configuration: JEXTEN = 0x1 (HW Trigger), JDISCEN = 1, CHANNELS = 5,6

by s/w ↑ by h/w ↑ Indicative timings
MS31023V3
- 1. AUTDLY = 1
- 2. Regular configuration: EXTEN = 0x0 (SW trigger), CONT = 1, DISCEN = 0, CHANNELS = 1, 2, 3
- 3. Injected configuration: JEXTEN = 0x1 (HW Trigger), JDISCEN = 0, CHANNELS = 5,6

by s/w ↑ by h/w ↑ Indicative timings
MS31024V4
- 1. AUTDLY = 1
- 2. Regular configuration: EXTEN = 0x0 (SW trigger), CONT = 1, DISCEN = 0, CHANNELS = 1, 2
- 3. Injected configuration: JAUTO = 1, CHANNELS = 5,6
27.4.29 Analog window watchdog (AWD1EN, JAWD1EN, AWD1SGL, AWD1CH, AWD2CH, AWD3CH, AWD_HTx, AWD_LTx, AWDx)
The three AWD analog watchdogs monitor whether some channels remain within a configured voltage range (window).
Figure 266. Analog watchdog guarded area

AWDx flag and interrupt
An interrupt can be enabled for each of the 3 analog watchdogs by setting AWDxIE in the ADC_IER register (x = 1,2,3).
AWDx (x = 1,2,3) flag is cleared by software by writing 1 to it.
The ADC conversion result is compared to the lower and higher thresholds before alignment.
Description of analog watchdog 1
The AWD analog watchdog 1 is enabled by setting the AWD1EN bit in the ADC_CFGR register. This watchdog monitors whether either one selected channel or all enabled channels(1) remain within a configured voltage range (window).
Table 234 shows how the ADC_CFGR registers should be configured to enable the analog watchdog on one or more channels.
Table 234. Analog watchdog channel selection
| Channels guarded by the analog watchdog | AWD1SGL bit | AWD1EN bit | JAWD1EN bit |
|---|---|---|---|
| None | x | 0 | 0 |
| All injected channels | 0 | 0 | 1 |
| All regular channels | 0 | 1 | 0 |
| All regular and injected channels | 0 | 1 | 1 |
| Single(1) injected channel | 1 | 0 | 1 |
| Single(1) regular channel | 1 | 1 | 0 |
| Single(1) regular or injected channel | 1 | 1 | 1 |
1. Selected by the AWD1CH[4:0] bits. The channels must also be programmed to be converted in the appropriate regular or injected sequence.
The AWD1 analog watchdog status bit is set if the analog voltage converted by the ADC is below a lower threshold or above a higher threshold.
These thresholds are programmed in bits HT1[11:0] and LT1[11:0] of the ADC_TR1 register for the analog watchdog 1. When converting data with a resolution of less than 12 bits (according to bits RES[1:0]), the LSB of the programmed thresholds must be kept cleared because the internal comparison is always performed on the full 12-bit raw converted data (left aligned) before the offset compensation stage.
Table 235 describes how the comparison is performed for all the possible resolutions for analog watchdog 1.
Table 235. Analog watchdog 1 comparison
| Resolution( bit RES[1:0]) | Analog watchdog comparison between: | Comments | |
|---|---|---|---|
| Raw converted data, left aligned | Thresholds | ||
| 00: 12-bit | DATA[11:0] | LT1[11:0] and HT1[11:0] | - |
| 01: 10-bit | DATA[11:2],00 | LT1[11:0] and HT1[11:0] | User must configure LT1[1:0] and HT1[1:0] to 00 |
| 10: 8-bit | DATA[11:4],0000 | LT1[11:0] and HT1[11:0] | User must configure LT1[3:0] and HT1[3:0] to 0000 |
| 11: 6-bit | DATA[11:6],000000 | LT1[11:0] and HT1[11:0] | User must configure LT1[5:0] and HT1[5:0] to 000000 |
Analog watchdog filter for watchdog 1
When an ADC is configured with only one input channel (selecting several channels in scan mode not allowed), a valid ADC conversion data filter can be configured:
- • When the converted data belong to the interval defined in ADC_TR1, the AWD1 flag remains cleared.
- • If data are out-of-range a number of times higher than the value specified in AWDFILTR bit of ADC_TR1, the AWD1 flag is set and the corresponding interrupt is issued.
Description of analog watchdog 2 and 3
The second and third analog watchdogs are more flexible and can guard several selected channels by programming the corresponding bits in AWDxCH[18:0] (x = 2,3).
The corresponding watchdog is enabled when any bit of AWDxCH[18:0] (x = 2,3) is set.
They are limited to a resolution of 8 bits and only the 8 MSBs of the thresholds can be programmed into HTx[7:0] and LTx[7:0]. Table 236 describes how the comparison is performed for all the possible resolutions.
Table 236. Analog watchdog 2 and 3 comparison
| Resolution (bits RES[1:0]) | Analog watchdog comparison between: | Comments | |
|---|---|---|---|
| Raw converted data, left aligned | Thresholds | ||
| 00: 12-bit | DATA[11:4] | LTx[7:0] and HTx[7:0] | DATA[3:0] are not relevant for the comparison |
| 01: 10-bit | DATA[11:4] | LTx[7:0] and HTx[7:0] | DATA[3:2] are not relevant for the comparison |
Table 236. Analog watchdog 2 and 3 comparison
| Resolution (bits RES[1:0]) | Analog watchdog comparison between: | Comments | |
|---|---|---|---|
| Raw converted data, left aligned | Thresholds | ||
| 10: 8-bit | DATA[11:4] | LTx[7:0] and HTx[7:0] | - |
| 11: 6-bit | DATA[11:6],00 | LTx[7:0] and HTx[7:0] | User must configure LTx[1:0] and HTx[1:0] to 00 |
ADCy_AWDx_OUT signal output generation
Each analog watchdog is associated to an internal hardware signal ADCy_AWDx_OUT (y = ADC number, x = watchdog number) which is directly connected to the ETR input (external trigger) of some on-chip timers. Refer to the on-chip timers section to understand how to select the ADCy_AWDx_OUT signal as ETR.
ADCy_AWDx_OUT is activated when the associated analog watchdog is enabled:
- • ADCy_AWDx_OUT is set when a guarded conversion is outside the programmed thresholds.
- • ADCy_AWDx_OUT is reset after the end of the next guarded conversion which is inside the programmed thresholds (It remains at 1 if the next guarded conversions are still outside the programmed thresholds).
- • ADCy_AWDx_OUT is also reset when disabling the ADC (when setting ADDIS = 1). Note that stopping regular or injected conversions (setting ADSTP = 1 or JADSTP = 1) has no influence on the generation of ADCy_AWDx_OUT.
Note: AWDx flag is set by hardware and reset by software: AWDx flag has no influence on the generation of ADCy_AWDx_OUT (ex: ADCy_AWDx_OUT can toggle while AWDx flag remains at 1 if the software did not clear the flag).
Figure 267. ADCy_AWDx_OUT signal generation (on all regular channels)

- Converting regular channels 1,2,3,4,5,6,7
- Regular channels 1,2,3,4,5,6,7 are all guarded
MS31025V1
Figure 268. ADCy_AWDx_OUT signal generation (AWDx flag not cleared by software)

ADC STATE: RDY, Conversion1 (inside), Conversion2 (outside), Conversion3 (inside), Conversion4 (outside), Conversion5 (outside), Conversion6 (outside), Conversion7 (inside)
EOC FLAG: Pulses at the end of each conversion.
AWDx FLAG: High from the end of Conversion2 until cleared by software after Conversion7.
ADCy_AWDx_OUT: High when AWDx FLAG is high, low otherwise.
- Converting regular channels 1,2,3,4,5,6,7
- Regular channels 1,2,3,4,5,6,7 are all guarded
MS31026V1
Figure 269. ADCy_AWDx_OUT signal generation (on a single regular channel)

ADC STATE: Conversion1 (outside), Conversion2, Conversion1 (inside), Conversion2, Conversion1 (outside), Conversion2, Conversion1 (outside), Conversion2
EOC FLAG: Pulses at the end of each conversion.
EOS FLAG: Pulse at the end of Conversion2 of each pair.
AWDx FLAG: High during Conversion1 of each pair, cleared by software after each Conversion1.
ADCy_AWDx_OUT: High during the first Conversion1 of each pair, low otherwise.
- Converting regular channels 1 and 2
- Only channel 1 is guarded
MS31027V1
Figure 270. ADCy_AWDx_OUT signal generation (on all injected channels)

ADC STATE: RDY, Conversion1 (inside), Conversion2 (outside), Conversion3 (inside), Conversion4 (outside), Conversion (outside), Conversion (outside), Conversion (inside)
JEOS FLAG: Pulse at the end of the last injected channel conversion.
AWDx FLAG: High during each injected channel conversion, cleared by software after each.
ADCy_AWDx_OUT: High during each injected channel conversion, low otherwise.
- Converting the injected channels 1, 2, 3, 4
- All injected channels 1, 2, 3, 4 are guarded
MS31028V1
Analog watchdog threshold control
LTx[11:0] and HTx[11:0] can be changed when an analog-to-digital conversion is ongoing (that is between the start of conversion and the end of conversion of the ADC internal state). If LTx[11:0] and HTx[11:0] are updated during the ADC conversion of the ADC guarded channel, the watchdog function is masked for this conversion. This masking is removed at the next start of conversion, resulting in analog watchdog thresholds to be applied from the next ADC conversion. The analog watchdog comparison is performed at each end of conversion. If the current ADC data is out of the new interval, no interrupt and AWDx_OUT signal are issued. The interrupt and the AWD generation only happen at the end of the conversion which started after the threshold update. If AWD_xOUT is already asserted, programming the new thresholds does not deassert the AWDx_OUT signal.
To update both LTx[11:0] and HTx[11:0] during an ADC conversion, a unique write access to the ADC_TRx register be performed.
Analog watchdog with offset compensation
When the offset compensation is enabled, the analog watchdog compares the threshold before the data compensation.
27.4.30 Oversampler
The oversampling unit performs data pre-processing to offload the CPU. It is able to handle multiple conversions and average them into a single data with increased data width, up to 16-bit.
It provides a result with the following form, where N and M can be adjusted:
It allows to perform by hardware the following functions: averaging, data rate reduction, SNR improvement, basic filtering.
The oversampling ratio N is defined using the OVFS[2:0] bits in the ADC_CFGR2 register, and can range from 2x to 256x. The division coefficient M consists of a right bit shift up to 8 bits, and is defined using the OVSS[3:0] bits in the ADC_CFGR2 register.
The summation unit can yield a result up to 20 bits (256x 12-bit results), which is first shifted right. It is then truncated to the 16 least significant bits, rounded to the nearest value using the least significant bits left apart by the shifting, before being finally transferred into the ADC_DR data register.
Note: If the intermediary result after the shifting exceeds 16-bit, the result is truncated as is, without saturation.
Figure 271. 20-bit to 16-bit result truncation

Figure 272 gives a numerical example of the processing, from a raw 20-bit accumulated data to the final 16-bit result.
Figure 272. Numerical example with 5-bit shift and rounding

Table 237 gives the data format for the various N and M combinations, for a raw conversion data equal to 0xFFFF.
Table 237. Maximum output results versus N and M (gray cells indicate truncation)
| Over sampling ratio | Max Raw data | No-shift OVSS = 0000 | 1-bit shift OVSS = 0001 | 2-bit shift OVSS = 0010 | 3-bit shift OVSS = 0011 | 4-bit shift OVSS = 0100 | 5-bit shift OVSS = 0101 | 6-bit shift OVSS = 0110 | 7-bit shift OVSS = 0111 | 8-bit shift OVSS = 1000 |
|---|---|---|---|---|---|---|---|---|---|---|
| 2x | 0x1FFE | 0x1FFE | 0x0FFF | 0x0800 | 0x0400 | 0x0200 | 0x0100 | 0x0080 | 0x0040 | 0x020 |
| 4x | 0x3FFC | 0x3FFC | 0x1FFE | 0x0FFF | 0x0800 | 0x0400 | 0x0200 | 0x0100 | 0x0080 | 0x0040 |
| 8x | 0x7FF8 | 0x7FF8 | 0x3FFC | 0x1FFE | 0x0FFF | 0x0800 | 0x0400 | 0x0200 | 0x0100 | 0x0080 |
| 16x | 0xFFF0 | 0xFFF0 | 0x7FF8 | 0x3FFC | 0x1FFE | 0x0FFF | 0x0800 | 0x0400 | 0x0200 | 0x0100 |
| 32x | 0x1FFE0 | 0xFFE0 | 0xFFF0 | 0x7FF8 | 0x3FFC | 0x1FFE | 0x0FFF | 0x0800 | 0x0400 | 0x0200 |
| 64x | 0x3FFC0 | 0xFFC0 | 0xFFE0 | 0xFFF0 | 0x7FF8 | 0x3FFC | 0x1FFE | 0x0FFF | 0x0800 | 0x0400 |
| 128x | 0x7FF80 | 0xFF80 | 0xFFC0 | 0xFFE0 | 0xFFF0 | 0x7FF8 | 0x3FFC | 0x1FFE | 0x0FFF | 0x0800 |
| 256x | 0xFFF00 | 0xFF00 | 0xFF80 | 0xFFC0 | 0xFFE0 | 0xFFF0 | 0x7FF8 | 0x3FFC | 0x1FFE | 0x0FFF |
There are no changes for conversion timings in oversampled mode: the sample time is maintained equal during the whole oversampling sequence. A new data is provided every N
conversions, with an equivalent delay equal to \(N \times T_{\text{CONV}} = N \times (t_{\text{SMPL}} + t_{\text{SAR}})\). The flags are set as follow:
- • The end of the sampling phase (EOSMP) is set after each sampling phase
- • The end of conversion (EOC) occurs once every N conversions, when the oversampled result is available
- • The end of sequence (EOS) occurs once the sequence of oversampled data is completed (that is after N × sequence length conversions total)
ADC operating modes supported when oversampling (single ADC mode)
In oversampling mode, most of the ADC operating modes are maintained:
- • Single or continuous conversion modes
- • ADC conversions start either by software or with triggers
- • ADC stop during a conversion (abort)
- • Data read via CPU or DMA with overrun detection
- • Low-power modes (AUTDLY)
- • Programmable resolution: in this case, the reduced conversion values (as per RES[1:0] bits in ADC_CFGR register) are accumulated, truncated, rounded and shifted in the same way as 12-bit conversions are
Note: The alignment mode is not available when working with oversampled data. The ALIGN bit in ADC_CFGR is ignored and the data are always provided right-aligned.
Offset correction is not supported in oversampling mode. When ROVSE and/or JOVSE bit is set, the value of the OFFSET_EN bit in ADC_OFRy register is ignored (considered as reset).
Analog watchdog
The analog watchdog functionality is maintained, with the following difference:
- • The RES[1:0] bits are ignored, the comparison is always done by using the full 12-bit values HT1[11:0] and LT1[11:0] for AWD1, and the 8-MSB value of HT2/HT3[7:0] and LT2/LT3[7:0] for AWD2 and AWD3.
- • The comparison is done on the most significant 12-bit of the 16-bit oversampled results ADC_DR[15:4] for AWD1, and ADC_DR[15:8] for AWD2 and AWD3
Note: Care must be taken when using high shifting values, this reduces the comparison range. For instance, if the oversampled result is shifted by 4 bits, thus yielding a 12-bit data right-aligned, the effective analog watchdog comparison can only be performed on 8 bits. The comparison is done between ADC_DR[11:4] and HTx[7:0] / LTx[7:0] (AWD1/2/3), with HT1[11:8] and LT1[11:8] kept reset (AWD1 only).
Triggered mode
The averager can also be used for basic filtering purpose. Although not a very powerful filter (slow roll-off and limited stop band attenuation), it can be used as a notch filter to reject constant parasitic frequencies (typically coming from the mains or from a switched mode power supply). For this purpose, a specific discontinuous mode can be enabled with TROVS bit in ADC_CFGR2, to be able to have an oversampling frequency defined by a user and independent from the conversion time itself.
The Figure 273 below shows how conversions are started in response to triggers during discontinuous mode.
If the TROVS bit is set, the content of the DISCEN bit is ignored and considered as 1.
Figure 273. Triggered regular oversampling mode (TROVS bit = 1)

Diagram showing two scenarios: 1) CONT=0, DISCEN = 1, TROVS = 0: Single 'Trigger' initiates 4 consecutive regular conversions: Ch(N)0, Ch(N)1, Ch(N)2, Ch(N)3, after which EOC flag is set. Then a second 'Trigger' initiates another sequence Ch(N)0, Ch(N)1, Ch(N)2, Ch(N)3. 2) CONT=0, DISCEN = 1, TROVS = 1: Each individual conversion step requires its own Trigger: Trigger -> Ch(N)0, Trigger -> Ch(N)1, Trigger -> Ch(N)2, Trigger -> Ch(N)3 (at which point EOC flag is set), followed by subsequent triggers for Ch(N)0, Ch(N)1, Ch(N)2.
MS34455V2
Injected and regular sequencer management when oversampling
In oversampling mode, it is possible to have differentiated behavior for injected and regular sequencers. The oversampling can be enabled for both sequencers with some limitations if they have to be used simultaneously (this is related to a unique accumulation unit).
Oversampling regular channels only
The regular oversampling mode bit ROVSM defines how the regular oversampling sequence is resumed if it is interrupted by injected conversion:
- • In continued mode, the accumulation restarts from the last valid data (prior to the conversion abort request due to the injected trigger). This ensures that oversampling is complete whatever the injection frequency (providing at least one regular conversion can be completed between triggers);
- • In resumed mode, the accumulation restarts from 0 (previous conversions results are ignored). This mode allows to guarantee that all data used for oversampling were converted back-to-back within a single timeslot. Care must be taken to have a injection trigger period above the oversampling period length. If this condition is not respected, the oversampling cannot be completed and the regular sequencer is blocked.
The Figure 274 gives examples for a 4x oversampling ratio.
Figure 274. Regular oversampling modes (4x ratio)

The diagram illustrates two regular oversampling modes for a 4x ratio. Both modes show a sequence of regular channels and injected channels, with a trigger and abort mechanism.
Continued mode: The regular channels sequence is \(Ch(N)_0, Ch(N)_1, Ch(N)_2, Ch(N)_3, Ch(M)_0, Ch(M)_1\). A trigger starts the sequence. An abort occurs at Ch(M)₁, leading to the injected channels Ch(J),Ch(K). After the injected channels, oversampling is continued with the sequence Ch(M)₁,Ch(M)₂,Ch(M)₃,Ch(O)₀. The mode is defined by \(ROVSE = 1, JOVSE = 0, ROVSM = 0, TROVS = X\).
Resumed mode: The regular channels sequence is \(Ch(N)_0, Ch(N)_1, Ch(N)_2, Ch(N)_3, Ch(M)_0, Ch(M)_1\). A trigger starts the sequence. An abort occurs at Ch(M)₁, leading to the injected channels Ch(J),Ch(K). After the injected channels, oversampling is resumed with the sequence Ch(M)₀,Ch(M)₁,Ch(M)₂,Ch(M)₃. The mode is defined by \(ROVSE = 1, JOVSE = 0, ROVSM = 1, TROVS = X\).
MS34456V1
Oversampling Injected channels only
The Injected oversampling mode bit JOVSE enables oversampling solely for conversions in the injected sequencer.
Oversampling regular and Injected channels
It is possible to have both ROVSE and JOVSE bits set. In this case, the regular oversampling mode is forced to resumed mode (ROVSM bit ignored), as represented on Figure 275 below.
Figure 275. Regular and injected oversampling modes used simultaneously

Regular channels: Ch(N)0, Ch(N)1, Ch(N)2, Ch(N)3, Ch(M)0, Ch(M)1
Injected channels: Ch(J)0, Ch(J)1, Ch(J)2, Ch(J)3
Labels: Oversampling aborted, Oversampling resumed, Trigger, Abort, JEOC
Parameters: ROVSE = 1, JOVSE = 1, ROVSM = 1, TROVS = 0
Reference: MS34457V2
Triggered regular oversampling with injected conversions
It is possible to have triggered regular mode with injected conversions. In this case, the injected mode oversampling mode must be disabled, and the ROVSM bit is ignored (resumed mode is forced). The JOVSE bit must be reset. The behavior is represented on Figure 276 below.
Figure 276. Triggered regular oversampling with injection

Regular channels: Ch(N)0, Ch(N)1, Ch(N)2, Ch(N)0, Ch(N)1
Injected channels: Ch(J), Ch(K)
Labels: Trigger, Oversampling resumed, Abort, Triggered, Resumed
Parameters: ROVSE = 1, JOVSE = 0, ROVSM = 1, TROVS = 1
Reference: MS34458V4
Auto-injected mode
It is possible to oversample auto-injected sequences and have all conversions results stored in registers to save a DMA resource. This mode is available only with both regular and injected oversampling active: JAUTO = 1, ROVSE = 1 and JOVSE = 1, other combinations are not supported. The ROVSM bit is ignored in auto-injected mode. The Figure 277 below shows how the conversions are sequenced.
Figure 277. Oversampling in auto-injected mode

Regular channels N₀N₁N₂N₃
Injected channels \(I_0 I_1 I_2 I_3 J_0 J_1 J_2 J_3 K_0 K_1 K_2 K_3 L_0 L_1 L_2 L_3\)
JAUTO = 1, ROVSE = 1, JOVSE = 1, ROVSM = X, TROVS = 0
MS34459V1
It is possible to have also the triggered mode enabled, using the TROVS bit. In this case, the ADC must be configured as following: JAUTO = 1, DISCEN = 0, JDISCEN = 0, ROVSE = 1, JOVSE = 1 and TROVSE = 1.
Dual ADC modes supported when oversampling
It is possible to have oversampling enabled when working in dual ADC configuration, for the injected simultaneous mode and regular simultaneous mode. In this case, the two ADCs must be programmed with the very same settings (including oversampling).
All other dual ADC modes are not supported when either regular or injected oversampling is enabled (ROVSE = 1 or JOVSE = 1).
Combined modes summary
The Table 238 below summarizes all combinations, including modes not supported.
Table 238. Oversampler operating modes summary
| Regular Oversampling ROVSE | Injected Oversampling JOVSE | Oversampler mode ROVSM 0 = continued 1 = resumed | Triggered Regular mode TROVS | Comment |
|---|---|---|---|---|
| 1 | 0 | 0 | 0 | Regular continued mode |
| 1 | 0 | 0 | 1 | Not supported |
| 1 | 0 | 1 | 0 | Regular resumed mode |
| 1 | 0 | 1 | 1 | Triggered regular resumed mode |
| 1 | 1 | 0 | X | Not supported |
| 1 | 1 | 1 | 0 | Injected and regular resumed mode |
| 1 | 1 | 1 | 1 | Not supported |
| 0 | 1 | X | X | Injected oversampling |
27.4.31 Dual ADC modes
Dual ADC modes can be used in devices with two ADCs or more (see Figure 278).
In dual ADC mode the start of conversion is triggered alternately or simultaneously by the ADCx master to the ADC slave, depending on the mode selected by the bits DUAL[4:0] in the ADC_CCR register.
Four possible modes are implemented:
- • Injected simultaneous mode
- • Regular simultaneous mode
- • Interleaved mode
- • Alternate trigger mode
It is also possible to use these modes combined in the following ways:
- • Injected simultaneous mode + regular simultaneous mode
- • Regular simultaneous mode + alternate trigger mode
- • Injected simultaneous mode + interleaved mode
In dual ADC mode (when bits DUAL[4:0] in ADC_CCR register are not equal to zero), the bits CONT, AUTDLY, DISCEN, DISCNUM[2:0], JDISCEN, JQM, JAUTO of the ADC_CFGR register are shared between the master and slave ADC: the bits in the slave ADC are always equal to the corresponding bits of the master ADC.
To start a conversion in dual mode, the user must program the bits EXTEN, EXTSEL, JEXTEN, JEXTSEL of the master ADC only, to configure a software or hardware trigger, and a regular or injected trigger. (the bits EXTEN[1:0] and JEXTEN[1:0] of the slave ADC are don't care).
In regular simultaneous or interleaved modes: once the user sets bit ADSTART or bit ADSTP of the master ADC, the corresponding bit of the slave ADC is also automatically set. However, bit ADSTART or bit ADSTP of the slave ADC is not necessary cleared at the same time as the master ADC bit.
In injected simultaneous or alternate trigger modes: once the user sets bit JADSTART or bit JADSTP of the master ADC, the corresponding bit of the slave ADC is also automatically set. However, bit JADSTART or bit JADSTP of the slave ADC is not necessary cleared at the same time as the master ADC bit.
In dual ADC mode, the converted data of the master and slave ADC can be read in parallel, by reading the ADC common data register (ADC_CDR). The status bits can be also read in parallel by reading the dual-mode status register (ADC_CSR).
Figure 278. Dual ADC block diagram(1)
The diagram illustrates the Dual ADC block diagram, showing the interaction between the Master ADC and the Slave ADC.
Slave ADC:
- Inputs: Internal analog inputs (ADCx_INN1, ADCx_INP1, ADCx_INN2, ADCx_INP2, ..., ADCx_INN16, ADCx_INP16).
- Internal components: Regular channels, Injected channels, Regular data register (16-bits), and Injected data registers (4 x16-bits).
- Outputs: Data is sent to the Address/data bus via the Regular data register and Injected data registers.
Master ADC:
- Inputs: Internal analog inputs (ADCx_INN16, ADCx_INP16) and Internal triggers.
- Internal components: Regular channels, Injected channels, Regular data register (16-bits), Injected data registers (4 x16-bits), and Dual mode control.
- Triggering: Start trigger mux. (regular group) and Start trigger mux. (injected group) provide triggers to the ADC.
- Outputs: Data is sent to the Address/data bus via the Regular data register and Injected data registers.
Address/data bus: Connects the data registers of both ADCs to the system bus.
MSv36025V2
- 1. External triggers also exist on slave ADC but are not shown for the purposes of this diagram.
- 2. The ADC common data register (ADC_CDR) contains both the master and slave ADC regular converted data.
Injected simultaneous mode
This mode is selected by programming bits DUAL[4:0] = 00101
This mode converts an injected group of channels. The external trigger source comes from the injected group multiplexer of the master ADC (selected by the JEXTSEL bits in the ADC_JSQR register).
Note: Do not convert the same channel on the two ADCs (no overlapping sampling times for the two ADCs when converting the same channel).
In simultaneous mode, one must convert sequences with the same length or ensure that the interval between triggers is longer than the longer of the 2 sequences. Otherwise, the ADC with the shortest sequence may restart while the ADC with the longest sequence is completing the previous conversions.
Regular conversions can be performed on one or all ADCs. In that case, they are independent of each other and are interrupted when an injected event occurs. They are resumed at the end of the injected conversion group.
- • At the end of injected sequence of conversion event (JEOS) on the master ADC, the converted data is stored into the master ADC_JDRy registers and a JEOS interrupt is generated (if enabled)
- • At the end of injected sequence of conversion event (JEOS) on the slave ADC, the converted data is stored into the slave ADC_JDRy registers and a JEOS interrupt is generated (if enabled)
- • If the duration of the master injected sequence is equal to the duration of the slave injected one (like in Figure 279), it is possible for the software to enable only one of the two JEOS interrupt (ex: master JEOS) and read both converted data (from master ADC_JDRy and slave ADC_JDRy registers).
Figure 279. Injected simultaneous mode on 4 channels: dual ADC mode

MS31900V1
If JDISCEN = 1, each simultaneous conversion of the injected sequence requires an injected trigger event to occur.
This mode can be combined with AUTDLY mode:
- • Once a simultaneous injected sequence of conversions has ended, a new injected trigger event is accepted only if both JEOS bits of the master and the slave ADC have been cleared (delay phase). Any new injected trigger events occurring during the ongoing injected sequence and the associated delay phase are ignored.
- • Once a regular sequence of conversions of the master ADC has ended, a new regular trigger event of the master ADC is accepted only if the master data register (ADC_DR) has been read. Any new regular trigger events occurring for the master ADC during the
ongoing regular sequence and the associated delay phases are ignored.
There is the same behavior for regular sequences occurring on the slave ADC.
Regular simultaneous mode with independent injected
This mode is selected by programming bits DUAL[4:0] = 00110.
This mode is performed on a regular group of channels. The external trigger source comes from the regular group multiplexer of the master ADC (selected by the EXTSEL bits in the ADC_CFGR register). A simultaneous trigger is provided to the slave ADC.
In this mode, independent injected conversions are supported. An injection request (either on master or on the slave) aborts the current simultaneous conversions, which are restarted once the injected conversion is completed.
Note: Do not convert the same channel on the two ADCs (no overlapping sampling times for the two ADCs when converting the same channel).
In regular simultaneous mode, one must convert sequences with the same length or ensure that the interval between triggers is longer than the longer conversion time of the 2 sequences. Otherwise, the ADC with the shortest sequence may restart while the ADC with the longest sequence is completing the previous conversions.
Software is notified by interrupts when it can read the data:
- • At the end of each conversion event (EOC) on the master ADC, a master EOC interrupt is generated (if EOCIE is enabled) and software can read the ADC_DR of the master ADC.
- • At the end of each conversion event (EOC) on the slave ADC, a slave EOC interrupt is generated (if EOCIE is enabled) and software can read the ADC_DR of the slave ADC.
- • If the duration of the master regular sequence is equal to the duration of the slave one (like in Figure 280), it is possible for the software to enable only one of the two EOC interrupt (ex: master EOC) and read both converted data from the Common Data register (ADC_CDR).
It is also possible to read the regular data using the DMA. Two methods are possible:
- • Using two DMA channels (one for the master and one for the slave). In this case bits MDMA[1:0] must be kept cleared.
- – Configure the DMA master ADC channel to read ADC_DR from the master. DMA requests are generated at each EOC event of the master ADC.
- – Configure the DMA slave ADC channel to read ADC_DR from the slave. DMA requests are generated at each EOC event of the slave ADC.
- • Using MDMA mode, which leaves one DMA channel free for other uses:
- – Configure MDMA[1:0] = 0b10 or 0b11 (depending on resolution).
- – A single DMA channel is used (the one of the master). Configure the DMA master ADC channel to read the common ADC register (ADC_CDR)
- – A single DMA request is generated each time both master and slave EOC events have occurred. At that time, the slave ADC converted data is available in the upper half-word of the ADC_CDR 32-bit register and the master ADC converted data is available in the lower half-word of ADC_CDR register.
- – Both EOC flags are cleared when the DMA reads the ADC_CDR register.
Note: In MDMA mode (MDMA[1:0] = 0b10 or 0b11), the user must program the same number of conversions in the master's sequence as in the slave's sequence. Otherwise, the remaining conversions does not generate a DMA request.
Figure 280. Regular simultaneous mode on 16 channels: dual ADC mode

If DISCEN = 1 then each “n” simultaneous conversions of the regular sequence require a regular trigger event to occur (“n” is defined by DISCNUM).
This mode can be combined with AUTDLY mode:
- Once a simultaneous conversion of the sequence has ended, the next conversion in the sequence is started only if the common data register, ADC_CDR (or the regular data register of the master ADC) has been read (delay phase).
- Once a simultaneous regular sequence of conversions has ended, a new regular trigger event is accepted only if the common data register (ADC_CDR) has been read (delay phase). Any new regular trigger events occurring during the ongoing regular sequence and the associated delay phases are ignored.
It is possible to use the DMA to handle data in regular simultaneous mode combined with AUTDLY mode, assuming that multiple-DMA mode is used: bits MDMA must be set to 0b10 or 0b11.
When regular simultaneous mode is combined with AUTDLY mode, it is mandatory for the user to ensure that:
- The number of conversions in the master’s sequence is equal to the number of conversions in the slave’s.
- For each simultaneous conversions of the sequence, the length of the conversion of the slave ADC is inferior to the length of the conversion of the master ADC. Note that the length of the sequence depends on the number of channels to convert and the sampling time and the resolution of each channels.
Note: This combination of regular simultaneous mode and AUTDLY mode is restricted to the use case when only regular channels are programmed: it is forbidden to program injected channels in this combined mode.
Interleaved mode with independent injected
This mode is selected by programming bits DUAL[4:0] = 00111.
This mode can be started only on a regular group (usually one channel). The external trigger source comes from the regular channel multiplexer of the master ADC.
After an external trigger occurs:
- The master ADC starts immediately.
- The slave ADC starts after a delay of several-ADC clock cycles after the sampling phase of the master ADC has complete.
The minimum delay which separates two conversions in interleaved mode is configured in the DELAY bits in the ADC_CCR register. This delay starts counting one half cycle after the end of the sampling phase of the master conversion. This way, an ADC cannot start a
conversion if the complementary ADC is still sampling its input (only one ADC can sample the input signal at a given time).
- • The minimum possible DELAY is 1 to ensure that there is at least one cycle time between the opening of the analog switch of the master ADC sampling phase and the closing of the analog switch of the slave ADC sampling phase.
- • The maximum DELAY is equal to the number of cycles corresponding to the selected resolution. However the user must properly calculate this delay to ensure that an ADC does not start a conversion while the other ADC is still sampling its input.
If the CONT bit is set on both master and slave ADCs, the selected regular channels of both ADCs are continuously converted.
The software is notified by interrupts when it can read the data at the end of each conversion event (EOC) on the slave ADC. A slave and master EOC interrupts are generated (if EOCIE is enabled) and the software can read the ADC_DR of the slave/master ADC.
Note: It is possible to enable only the EOC interrupt of the slave and read the common data register (ADC_CDR). But in this case, the user must ensure that the duration of the conversions are compatible to ensure that inside the sequence, a master conversion is always followed by a slave conversion before a new master conversion restarts. It is recommended to use the MDMA mode.
It is also possible to have the regular data transferred by DMA. In this case, individual DMA requests on each ADC cannot be used and it is mandatory to use the MDMA mode, as following:
- • Configure MDMA[1:0] = 0b10 or 0b11 (depending on resolution).
- • A single DMA channel is used (the one of the master). Configure the DMA master ADC channel to read the common ADC register (ADC_CDR).
- • A single DMA request is generated each time both master and slave EOC events have occurred. At that time, the slave ADC converted data is available in the upper half-word of the ADC_CDR 32-bit register and the master ADC converted data is available in the lower half-word of ADC_CCR register.
- • Both EOC flags are cleared when the DMA reads the ADC_CCR register.
Figure 281. Interleaved mode on one channel in continuous conversion mode: dual ADC mode

MSv31030V5
Figure 282. Interleaved mode on 1 channel in single conversion mode: dual ADC mode

0.5 ADCCLK cycle
0.5 ADCCLK cycle
MASTER ADC
CH1
CH1
SLAVE ADC
Trigger
CH1
CH1
4 ADCCLK cycles
End of conversion on master and slave ADC
4 ADCCLK cycles
End of conversion on master and slave ADC
Sampling
Conversion
MSv31031V3
If DISCEN = 1, each “n” simultaneous conversions (“n” is defined by DISCNUM) of the regular sequence require a regular trigger event to occur.
In this mode, injected conversions are supported. When injection is done (either on master or on slave), both the master and the slave regular conversions are aborted and the sequence is restarted from the master (see Figure 283 below).
Figure 283. Interleaved conversion with injection

Injected trigger
Resume (always on master)
CH11
ADC1 (master)
CH1
CH1
CH1
CH1
CH1
CH1
ADC2 (slave)
CH2
CH2
CH2
CH2
CH2
CH0
read CDR
read CDR
conversions aborted
read CDR
read CDR
Legend:
Sampling
Conversion
MS34460V1
Alternate trigger mode
This mode is selected by programming bits DUAL[4:0] = 01001.
This mode can be started only on an injected group. The source of external trigger comes from the injected group multiplexer of the master ADC.
This mode is only possible when selecting hardware triggers: JEXTEN must not be 0x0.
Injected discontinuous mode disabled (JDISCEN = 0 for both ADC)
- 1. When the 1st trigger occurs, all injected master ADC channels in the group are converted.
- 2. When the 2nd trigger occurs, all injected slave ADC channels in the group are converted.
- 3. And so on.
A JEOS interrupt, if enabled, is generated after all injected channels of the master ADC in the group have been converted.
A JEOS interrupt, if enabled, is generated after all injected channels of the slave ADC in the group have been converted.
JEOC interrupts, if enabled, can also be generated after each injected conversion.
If another external trigger occurs after all injected channels in the group have been converted then the alternate trigger process restarts by converting the injected channels of the master ADC in the group.
Figure 284. Alternate trigger: injected group of each ADC
Note: Regular conversions can be enabled on one or all ADCs. In this case the regular conversions are independent of each other. A regular conversion is interrupted when the ADC has to perform an injected conversion. It is resumed when the injected conversion is finished.
The time interval between 2 trigger events must be greater than or equal to 1 ADC clock period. The minimum time interval between 2 trigger events that start conversions on the same ADC is the same as in the single ADC mode.
Injected discontinuous mode enabled (JDISCEN = 1 for both ADC)
If the injected discontinuous mode is enabled for both master and slave ADCs:
- • When the 1st trigger occurs, the first injected channel of the master ADC is converted.
- • When the 2nd trigger occurs, the first injected channel of the slave ADC is converted.
- • And so on.
A JEOS interrupt, if enabled, is generated after all injected channels of the master ADC in the group have been converted.
A JEOS interrupt, if enabled, is generated after all injected channels of the slave ADC in the group have been converted.
JEOC interrupts, if enabled, can also be generated after each injected conversions.
If another external trigger occurs after all injected channels in the group have been converted then the alternate trigger process restarts.
Figure 285. Alternate trigger: 4 injected channels (each ADC) in discontinuous mode

Figure 285 illustrates the timing sequence for alternate trigger mode with 4 injected channels per ADC. The diagram shows two rows of boxes representing the Master ADC and Slave ADC. Each box is divided into a sampling phase (shaded) and a conversion phase (white). Triggers are indicated by arrows pointing to the start of the sampling phase. The sequence is as follows:
- 1st trigger: Master ADC sampling starts.
- 2nd trigger: Slave ADC sampling starts.
- 3rd trigger: Master ADC sampling starts.
- 4th trigger: Slave ADC sampling starts.
- 5th trigger: Master ADC sampling starts.
- 6th trigger: Slave ADC sampling starts.
- 7th trigger: Master ADC sampling starts.
- 8th trigger: Slave ADC sampling starts.
Interrupts are generated at the end of each conversion phase:
- After 1st trigger: JEOC on master ADC
- After 2nd trigger: JEOC on slave ADC
- After 3rd trigger: JEOC on master ADC
- After 4th trigger: JEOC on slave ADC
- After 5th trigger: JEOC on master ADC
- After 6th trigger: JEOC on slave ADC
- After 7th trigger: JEOC on master ADC
- After 8th trigger: JEOC, JEOS on slave ADC
Legend:
Sampling
Conversion
ai16060V3
Combined regular/injected simultaneous mode
This mode is selected by programming bits DUAL[4:0] = 00001.
It is possible to interrupt the simultaneous conversion of a regular group to start the simultaneous conversion of an injected group.
Note: In combined regular/injected simultaneous mode, one must convert sequences with the same length or ensure that the interval between triggers is longer than the long conversion time of the 2 sequences. Otherwise, the ADC with the shortest sequence may restart while the ADC with the longest sequence is completing the previous conversions.
Combined regular simultaneous + alternate trigger mode
This mode is selected by programming bits DUAL[4:0] = 00010.
It is possible to interrupt the simultaneous conversion of a regular group to start the alternate trigger conversion of an injected group. Figure 286 shows the behavior of an alternate trigger interrupting a simultaneous regular conversion.
The injected alternate conversion is immediately started after the injected event. If a regular conversion is already running, in order to ensure synchronization after the injected conversion, the regular conversion of all (master/slave) ADCs is stopped and resumed synchronously at the end of the injected conversion.
Note: In combined regular simultaneous + alternate trigger mode, one must convert sequences with the same length or ensure that the interval between triggers is longer than the long conversion time of the 2 sequences. Otherwise, the ADC with the shortest sequence may restart while the ADC with the longest sequence is completing the previous conversions.
Figure 286. Alternate + regular simultaneous

If a trigger occurs during an injected conversion that has interrupted a regular conversion, the alternate trigger is served. Figure 287 shows the behavior in this case (note that the 6th trigger is ignored because the associated alternate conversion is not complete).
Figure 287. Case of trigger occurring during injected conversion

Combined injected simultaneous plus interleaved
This mode is selected by programming bits DUAL[4:0] = 00011
It is possible to interrupt an interleaved conversion with a simultaneous injected event.
In this case the interleaved conversion is interrupted immediately and the simultaneous injected conversion starts. At the end of the injected sequence the interleaved conversion is resumed. When the interleaved regular conversion resumes, the first regular conversion which is performed is alway the master's one. Figure 288, Figure 289 and Figure 290 show the behavior using an example.
Caution: In this mode, it is mandatory to use the Common Data Register to read the regular data with a single read access. On the contrary, master-slave data coherency is not guaranteed.
Figure 288. Interleaved single channel CH0 with injected sequence CH11, CH12

ADC1 (master) CH0 CH0 CH0 CH0 CH0 CH0
ADC2 (slave) CH0 CH0 CH0 CH0 CH0 CH0
read CDR read CDR read CDR read CDR
CH11 CH11
CH12 CH12
Injected trigger
Resume (always restart with the master)
Conversions aborted
Legend:
Sampling Conversion
MS34461V1
Figure 289. Two Interleaved channels (CH1, CH2) with injected sequence CH11, CH12 - case 1: Master interrupted first

ADC1 (master) CH1 CH1 CH1 CH1 CH1 CH1
ADC2 (slave) CH2 CH2 CH2 CH2 CH2 CH2
read CDR read CDR read CDR read CDR
CH11 CH11
CH12 CH12
Injected trigger
Resume (always restart with the master)
Conversions aborted
Legend:
Sampling Conversion
MS34462V1
Figure 290. Two Interleaved channels (CH1, CH2) with injected sequence CH11, CH12 - case 2: Slave interrupted first

ADC1 (master) CH1 CH1 CH1 CH1 CH1 CH1
ADC2 (slave) CH2 CH2 CH2 CH2 CH2 CH2
read CDR read CDR read CDR read CDR
CH11 CH11
CH12 CH12
Injected trigger
Resume (always restart with the master)
Conversions aborted
Legend:
Sampling Conversion
MS34463V2
DMA requests in dual ADC mode
In all dual ADC modes, it is possible to use two DMA channels (one for the master, one for the slave) to transfer the data, like in single mode (refer to Figure 291: DMA Requests in regular simultaneous mode when MDMA = 0b00).
Figure 291. DMA Requests in regular simultaneous mode when MDMA = 0b00

Configuration where each sequence contains only one conversion
MSv31032V2
In simultaneous regular and interleaved modes, it is also possible to save one DMA channel and transfer both data using a single DMA channel. For this MDMA bits must be configured in the ADC_CCR register:
- • MDMA = 0b10: A single DMA request is generated each time both master and slave EOC events have occurred. At that time, two data items are available and the 32-bit register ADC_CDR contains the two half-words representing two ADC-converted data items. The slave ADC data take the upper half-word and the master ADC data take the lower half-word.
This mode is used in interleaved mode and in regular simultaneous mode when resolution is 10-bit or 12-bit.
Example:
Interleaved dual mode: a DMA request is generated each time 2 data items are available:
1st DMA request: ADC_CDR[31:0] = SLV_ADC_DR[15:0] | MST_ADC_DR[15:0]
2nd DMA request: ADC_CDR[31:0] = SLV_ADC_DR[15:0] | MST_ADC_DR[15:0]
Figure 292. DMA requests in regular simultaneous mode when MDMA = 0b10

The diagram illustrates the timing of DMA requests in regular simultaneous mode. It is divided into two parts by a vertical line. In the left part, two triggers are shown. The first trigger starts an ADC Master regular conversion for CH1, which ends with an ADC Master EOC signal. Simultaneously, the ADC Slave regular conversion for CH2 starts and ends with an ADC Slave EOC signal. A DMA request from the ADC Master occurs at the end of the CH1 conversion, and a DMA request from the ADC Slave occurs at the end of the CH2 conversion. The right part shows a similar sequence for a second trigger. The text 'Configuration where each sequence contains only one conversion' is at the bottom, and the code 'MSv31033V3' is in the bottom right corner.
Figure 293. DMA requests in interleaved mode when MDMA = 0b10

The diagram illustrates the timing of DMA requests in interleaved mode. It is divided into two parts by a vertical line. In the left part, three triggers are shown. The first trigger starts an ADC Master regular conversion for CH1. After a delay, the ADC Slave regular conversion for CH2 starts. The second trigger starts another CH1 conversion, followed by a delay and then a CH2 conversion. The third trigger starts a third CH1 conversion, followed by a delay and then a third CH2 conversion. ADC Master EOC signals occur at the end of each CH1 conversion, and ADC Slave EOC signals occur at the end of each CH2 conversion. DMA requests from the ADC Master occur at the end of each CH1 conversion, and DMA requests from the ADC Slave occur at the end of each CH2 conversion. The right part shows a similar sequence for a second trigger. The text 'Configuration where each sequence contains only one conversion' is at the bottom, and the code 'MSv31034V2' is in the bottom right corner.
Note: When using MDMA mode, the user must take care to configure properly the duration of the master and slave conversions so that a DMA request is generated and served for reading both data (master + slave) before a new conversion is available.
- • MDMA = 0b11: This mode is similar to the MDMA = 0b10. The only differences are that on each DMA request (two data items are available), two bytes representing two ADC converted data items are transferred as a half-word.
This mode is used in interleaved and regular simultaneous mode when resolution is 6-bit or when resolution is 8-bit and data is not signed (offsets must be disabled for all the involved channels).
Example:
Interleaved dual mode: a DMA request is generated each time 2 data items are available:
1st DMA request: ADC_CDR[15:0] = SLV_ADC_DR[7:0] | MST_ADC_DR[7:0]
2nd DMA request: ADC_CDR[15:0] = SLV_ADC_DR[7:0] | MST_ADC_DR[7:0]
Overrun detection
In dual ADC mode (when DUAL[4:0] is not equal to b00000), if an overrun is detected on one of the ADCs, the DMA requests are no longer issued to ensure that all the data transferred to the RAM are valid (this behavior occurs whatever the MDMA configuration). It may happen that the EOC bit corresponding to one ADC remains set because the data register of this ADC contains valid data.
DMA one shot mode/ DMA circular mode when MDMA mode is selected
When MDMA mode is selected (0b10 or 0b11), bit DMACFG of the ADC_CCR register must also be configured to select between DMA one shot mode and circular mode, as explained in section Section : Managing conversions using the DMA (bits DMACFG of master and slave ADC_CFGR are not relevant).
Stopping the conversions in dual ADC modes
The user must set the control bits ADSTP/JADSTP of the master ADC to stop the conversions of both ADC in dual ADC mode. The other ADSTP control bit of the slave ADC has no effect in dual ADC mode.
Once both ADC are effectively stopped, the bits ADSTART/JADSTART of the master and slave ADCs are both cleared by hardware.
27.4.32 Temperature sensor
The temperature sensor can be used to measure the junction temperature (Tj) of the device.
The temperature sensor is internally connected to the ADC input channels which are used to convert the sensor output voltage to a digital value (see Table: ADC interconnection in Section 27.4.2: ADC pins and internal signals for more details). When not in use, the sensor can be put in power down mode. It support the temperature range -40 to 125 °C.
Figure 294 shows the block diagram of connections between the temperature sensor and the ADC.
The temperature sensor output voltage changes linearly with temperature. The offset of this line varies from chip to chip due to process variation (up to 45 °C from one chip to another).
The uncalibrated internal temperature sensor is more suited for applications that detect temperature variations instead of absolute temperatures. To improve the accuracy of the temperature sensor measurement, calibration values are stored in system memory for each device by ST during production.
During the manufacturing process, the calibration data of the temperature sensor and the internal voltage reference are stored in the system memory area. The user application can then read them and use them to improve the accuracy of the temperature sensor or the internal reference (refer to the datasheet for additional information).
The temperature sensor is internally connected to the ADC input channel which is used to convert the sensor's output voltage to a digital value. Refer to the electrical characteristics section of the device datasheet for the sampling time value to be applied when converting the internal temperature sensor.
When not in use, the sensor can be put in power-down mode.
Figure 294 shows the block diagram of the temperature sensor.
Figure 294. Temperature sensor channel block diagram

graph LR
TS[Temperature sensor] --> MUX{MUX}
TSEN[TSEN control bit] --> MUX
MUX -- "VSENSE" --> ADC[ADCx]
ADC --> AD[Address/data bus]
ADC -- "Converted data" --> AD
MSv62477V1
Reading the temperature
To use the sensor:
- 1. Select the ADC input channels that is connected to \(V_{SENSE}\).
- 2. Program with the appropriate sampling time (refer to electrical characteristics section of the device datasheet).
- 3. Set the bit in the ADC_CCR register to wake up the temperature sensor from power-down mode.
- 4. Start the ADC conversion.
- 5. Read the resulting \(V_{SENSE}\) data in the ADC data register.
- 6. Calculate the actual temperature using the following formula:
where:
- • TS_CAL2 is the temperature sensor calibration value acquired at TS_CAL2_TEMP.
- • TS_CAL1 is the temperature sensor calibration value acquired at TS_CAL1_TEMP.
- • TS_DATA is the actual temperature sensor output value converted by ADC.
Refer to the device datasheet for more information about TS_CAL1 and TS_CAL2 calibration points.
Note: The sensor has a startup time after waking from power-down mode before it can output \(V_{\text{SENSE}}\) at the correct level. The ADC also has a startup time after power-on, so to minimize the delay, the ADEN and bits should be set at the same time.
27.4.33 \(V_{\text{BAT}}\) supply monitoring
The VBATEN bit in the ADC_CCR register is used to switch to the battery voltage. As the \(V_{\text{BAT}}\) voltage could be higher than \(V_{\text{DDA}}\), to ensure the correct operation of the ADC, the \(V_{\text{BAT}}\) pin is internally connected to a bridge divider by 4. This bridge is automatically enabled when VBATEN is set, to connect \(V_{\text{BAT}}/4\) to the ADC input channels (see Table: ADC interconnection in Section 27.4.2: ADC pins and internal signals for more details). As a consequence, the converted digital value is one third of the \(V_{\text{BAT}}\) voltage. To prevent any unwanted consumption on the battery, it is recommended to enable the bridge divider only when needed, for ADC conversion.
Refer to the electrical characteristics of the device datasheet for the sampling time value to be applied when converting the \(V_{\text{BAT}}/4\) voltage.
Figure 295 shows the block diagram of the \(V_{\text{BAT}}\) sensing feature.
Figure 295.\(V_{BAT}\) channel block diagram
- 1. The VBATEN bit must be set to enable the conversion of internal channel for \(V_{BAT}/4\).
27.4.34 Monitoring the internal voltage reference
It is possible to monitor the internal voltage reference (\(V_{REFINT}\)) to have a reference point for evaluating the ADC \(V_{REF+}\) voltage level.
Refer to Table: ADC interconnection in Section 27.4.2: ADC pins and internal signals for details on the ADC input channels to which the internal voltage reference is internally connected.
Refer to the electrical characteristics section of the product datasheet for the sampling time value to be applied when converting the internal voltage reference voltage.
Figure 296 shows the block diagram of the \(V_{REFINT}\) sensing feature.
Figure 296.\(V_{REFINT}\) channel block diagram
- 1. The VREFEN bit into ADC_CCR register must be set to enable the conversion of internal channels (\(V_{REFINT}\)).
Calculating the actual \(V_{REF+}\) voltage using the internal reference voltage
\(V_{REF+}\) voltage may be subject to variations or not precisely known. The embedded internal reference voltage \(V_{REFINT}\) and its calibration data acquired by the ADC during the manufacturing process at \(V_{REF+\_charac}\) can be used to evaluate the actual \(V_{REF+}\) voltage level.
The following formula gives the actual \(V_{REF+}\) voltage supplying the device:
Where:
- • \(V_{REF+\_Charac}\) is the value of \(V_{REF+}\) voltage characterized at \(V_{REFINT}\) during the manufacturing process. It is specified in the device datasheet.
- • VREFINT_CAL is the VREFINT calibration value
- • VREFINT_DATA is the actual VREFINT output value converted by ADC
Converting a supply-relative ADC measurement to an absolute voltage value
The ADC is designed to deliver a digital value corresponding to the ratio between \(V_{REF+}\) and the voltage applied on the converted channel.
For applications where \(V_{REF+}\) value is unknown and ADC converted values are right-aligned. In this case, it is necessary to convert this ratio into a voltage independent from \(V_{REF+}\):
By replacing \(V_{REF+}\) by the formula provided above, the absolute voltage value is given by the following formula
Where:
- – \(V_{REF+\_Charac}\) is the value of \(V_{REF+}\) voltage characterized at \(V_{REFINT}\) during the manufacturing process.
- – VREFINT_CAL is the VREFINT calibration value
- – ADC_DATA is the value measured by the ADC on channel x (right-aligned)
- – VREFINT_DATA is the actual VREFINT output value converted by the ADC
- – FULL_SCALE is the maximum digital value of the ADC output. For example with 12-bit resolution, it is 2¹²-1 = 4095 or with 8-bit resolution, 2⁸-1 = 255.
Note: If ADC measurements are done using an output format other than 12-bit right-aligned, all the parameters must first be converted to a compatible format before the calculation is done.
27.4.35 Monitoring the supply voltage
ADC2 is connected to the internal supply voltage. To use the ADC to measure this voltage, enable the connection through ADC option register.
27.5 ADC in low-power modes
Table 239. Effect of low-power modes on the ADC
| Mode | Description |
|---|---|
| Sleep | No effect. DMA requests are functional. ADC interrupts cause the device to exit from Sleep mode. |
| Stop | The ADC peripheral is not operational. Prior to entering this mode, it is recommended to disable the ADC. |
| Standby | The ADC peripheral is powered down and must be reinitialized after exiting from Standby mode. |
27.6 ADC interrupts
For each ADC, an interrupt can be generated:
- • After ADC power-up, when the ADC is ready (flag ADRDY)
- • On the end of any conversion for regular groups (flag EOC)
- • On the end of a sequence of conversion for regular groups (flag EOS)
- • On the end of any conversion for injected groups (flag JEOC)
- • On the end of a sequence of conversion for injected groups (flag JEOS)
- • When an analog watchdog detection occurs (flag AWD1, AWD2 and AWD3)
- • When the end of sampling phase occurs (flag EOSMP)
- • When the data overrun occurs (flag OVR)
- • When the injected sequence context queue overflows (flag JQOVF)
Separate interrupt enable bits are available for flexibility.
Table 240. ADC interrupts
| Interrupt vector | Interrupt event | Event flag | Enable Control bit | Interrupt clear method | Exit from Sleep mode | Exit from Stop, Standby mode |
|---|---|---|---|---|---|---|
| ADC | ADC ready | ADRDY | ADRDYIE | Set by hardware and cleared by software | Yes | No |
| End of conversion of a regular group | EOC | EOCIE | ||||
| End of conversion sequence of a regular group | EOS | EOSIE | ||||
| End of conversion of an injected group | JEOC | JEOCIE | ||||
| End of conversion sequence of an injected group | JEOS | JEOSIE | ||||
| Analog watchdog 1 status bit is set | AWD1 | AWD1IE | ||||
| Analog watchdog 2 status bit is set | AWD2 | AWD2IE | ||||
| Analog watchdog 3 status bit is set | AWD3 | AWD3IE | ||||
| End of sampling phase | EOSMP | EOSMPIE | ||||
| Overrun | OVR | OVRIE | ||||
| Injected context queue overflows | JQOVF | JQOVFIE |
27.7 ADC registers (for each ADC)
Refer to Section 1.2 on page 120 for a list of abbreviations used in register descriptions.
27.7.1 ADC interrupt and status register (ADC_ISR)
Address offset: 0x00
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. |
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| Res. | Res. | Res. | Res. | Res. | JQOVF | AWD3 | AWD2 | AWD1 | JEOS | JEOC | OVR | EOS | EOC | EOSMP | ADRDY |
| rc_w1 | rc_w1 | rc_w1 | rc_w1 | rc_w1 | rc_w1 | rc_w1 | rc_w1 | rc_w1 | rc_w1 | rc_w1 |
Bits 31:11 Reserved, must be kept at reset value.
Bit 10 JQOVF: Injected context queue overflow
This bit is set by hardware when an Overflow of the Injected Queue of Context occurs. It is cleared by software writing 1 to it. Refer to Section 27.4.21: Queue of context for injected conversions for more information.
0: No injected context queue overflow occurred (or the flag event was already acknowledged and cleared by software)
1: Injected context queue overflow has occurred
Bit 9 AWD3: Analog watchdog 3 flag
This bit is set by hardware when the converted voltage crosses the values programmed in the fields LT3[7:0] and HT3[7:0] of ADC_TR3 register. It is cleared by software writing 1 to it.
0: No analog watchdog 3 event occurred (or the flag event was already acknowledged and cleared by software)
1: Analog watchdog 3 event occurred
Bit 8 AWD2: Analog watchdog 2 flag
This bit is set by hardware when the converted voltage crosses the values programmed in the fields LT2[7:0] and HT2[7:0] of ADC_TR2 register. It is cleared by software writing 1 to it.
0: No analog watchdog 2 event occurred (or the flag event was already acknowledged and cleared by software)
1: Analog watchdog 2 event occurred
Bit 7 AWD1: Analog watchdog 1 flag
This bit is set by hardware when the converted voltage crosses the values programmed in the fields LT1[11:0] and HT1[11:0] of ADC_TR1 register. It is cleared by software writing 1 to it.
0: No analog watchdog 1 event occurred (or the flag event was already acknowledged and cleared by software)
1: Analog watchdog 1 event occurred
Bit 6 JEOS: Injected channel end of sequence flag
This bit is set by hardware at the end of the conversions of all injected channels in the group. It is cleared by software writing 1 to it.
0: Injected conversion sequence not complete (or the flag event was already acknowledged and cleared by software)
1: Injected conversions complete
Bit 5 JEOC: Injected channel end of conversion flag
This bit is set by hardware at the end of each injected conversion of a channel when a new data is available in the corresponding ADC_JDRy register. It is cleared by software writing 1 to it or by reading the corresponding ADC_JDRy register
0: Injected channel conversion not complete (or the flag event was already acknowledged and cleared by software)
1: Injected channel conversion complete
Bit 4 OVR: ADC overrun
This bit is set by hardware when an overrun occurs on a regular channel, meaning that a new conversion has completed while the EOC flag was already set. It is cleared by software writing 1 to it.
0: No overrun occurred (or the flag event was already acknowledged and cleared by software)
1: Overrun has occurred
Bit 3 EOS: End of regular sequence flag
This bit is set by hardware at the end of the conversions of a regular sequence of channels. It is cleared by software writing 1 to it.
0: Regular Conversions sequence not complete (or the flag event was already acknowledged and cleared by software)
1: Regular Conversions sequence complete
Bit 2 EOC: End of conversion flag
This bit is set by hardware at the end of each regular conversion of a channel when a new data is available in the ADC_DR register. It is cleared by software writing 1 to it or by reading the ADC_DR register
0: Regular channel conversion not complete (or the flag event was already acknowledged and cleared by software)
1: Regular channel conversion complete
Bit 1 EOSMP: End of sampling flag
This bit is set by hardware during the conversion of any channel (only for regular channels), at the end of the sampling phase.
0: not at the end of the sampling phase (or the flag event was already acknowledged and cleared by software)
1: End of sampling phase reached
Bit 0 ADRDY: ADC ready
This bit is set by hardware after the ADC has been enabled (ADEN = 1) and when the ADC reaches a state where it is ready to accept conversion requests.
It is cleared by software writing 1 to it.
0: ADC not yet ready to start conversion (or the flag event was already acknowledged and cleared by software)
1: ADC is ready to start conversion
27.7.2 ADC interrupt enable register (ADC_IER)
Address offset: 0x04
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. |
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| Res. | Res. | Res. | Res. | Res. | JQOVFIE | AWD3IE | AWD2IE | AWD1IE | JEOSIE | JEOCIE | OVRIE | EOSIE | EOCIE | EOSMPIE | ADRDYIE |
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw |
Bits 31:11 Reserved, must be kept at reset value.
Bit 10 JQOVFIE: Injected context queue overflow interrupt enable
This bit is set and cleared by software to enable/disable the Injected Context Queue Overflow interrupt.
0: Injected Context Queue Overflow interrupt disabled
1: Injected Context Queue Overflow interrupt enabled. An interrupt is generated when the JQOVF bit is set.
Note: The software is allowed to write this bit only when JADSTART = 0 (which ensures that no injected conversion is ongoing).
Bit 9 AWD3IE: Analog watchdog 3 interrupt enable
This bit is set and cleared by software to enable/disable the analog watchdog 2 interrupt.
0: Analog watchdog 3 interrupt disabled
1: Analog watchdog 3 interrupt enabled
Note: The software is allowed to write this bit only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Bit 8 AWD2IE: Analog watchdog 2 interrupt enable
This bit is set and cleared by software to enable/disable the analog watchdog 2 interrupt.
0: Analog watchdog 2 interrupt disabled
1: Analog watchdog 2 interrupt enabled
Note: The software is allowed to write this bit only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Bit 7 AWD1IE: Analog watchdog 1 interrupt enable
This bit is set and cleared by software to enable/disable the analog watchdog 1 interrupt.
0: Analog watchdog 1 interrupt disabled
1: Analog watchdog 1 interrupt enabled
Note: The software is allowed to write this bit only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Bit 6 JEOSIE: End of injected sequence of conversions interrupt enable
This bit is set and cleared by software to enable/disable the end of injected sequence of conversions interrupt.
0: JEOS interrupt disabled
1: JEOS interrupt enabled. An interrupt is generated when the JEOS bit is set.
Note: The software is allowed to write this bit only when JADSTART = 0 (which ensures that no injected conversion is ongoing).
Bit 5 JEOCIE: End of injected conversion interrupt enable
This bit is set and cleared by software to enable/disable the end of an injected conversion interrupt.
0: JEOC interrupt disabled.
1: JEOC interrupt enabled. An interrupt is generated when the JEOC bit is set.
Note: The software is allowed to write this bit only when JADSTART = 0 (which ensures that no injected conversion is ongoing).
Bit 4 OVRIE: Overrun interrupt enable
This bit is set and cleared by software to enable/disable the Overrun interrupt of a regular conversion.
0: Overrun interrupt disabled
1: Overrun interrupt enabled. An interrupt is generated when the OVR bit is set.
Note: The software is allowed to write this bit only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 3 EOSIE: End of regular sequence of conversions interrupt enable
This bit is set and cleared by software to enable/disable the end of regular sequence of conversions interrupt.
0: EOS interrupt disabled
1: EOS interrupt enabled. An interrupt is generated when the EOS bit is set.
Note: The software is allowed to write this bit only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 2 EOCIE: End of regular conversion interrupt enable
This bit is set and cleared by software to enable/disable the end of a regular conversion interrupt.
0: EOC interrupt disabled.
1: EOC interrupt enabled. An interrupt is generated when the EOC bit is set.
Note: The software is allowed to write this bit only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 1 EOSMPIE: End of sampling flag interrupt enable for regular conversions
This bit is set and cleared by software to enable/disable the end of the sampling phase interrupt for regular conversions.
0: EOSMP interrupt disabled.
1: EOSMP interrupt enabled. An interrupt is generated when the EOSMP bit is set.
Note: The software is allowed to write this bit only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 0 ADRDYIE: ADC ready interrupt enable
This bit is set and cleared by software to enable/disable the ADC Ready interrupt.
0: ADRDY interrupt disabled
1: ADRDY interrupt enabled. An interrupt is generated when the ADRDY bit is set.
Note: The software is allowed to write this bit only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
27.7.3 ADC control register (ADC_CR)
Address offset: 0x08
Reset value: 0x2000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ADCAL | ADCALDIF | DEEPPWD | ADVREGEN | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. |
| rs | rw | rw | rw | ||||||||||||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | JADSTP | ADSTP | JADSTART | ADSTART | ADDIS | ADEN |
| rs | rs | rs | rs | rs | rs |
Bit 31 ADCAL: ADC calibration
This bit is set by software to start the calibration of the ADC. Program first the bit ADCALDIF to determine if this calibration applies for single-ended or Differential inputs mode. It is cleared by hardware after calibration is complete.
0: Calibration complete
1: Write 1 to calibrate the ADC. Read at 1 means that a calibration in progress.
Note: The software is allowed to launch a calibration by setting ADCAL only when ADEN = 0.
The software is allowed to update the calibration factor by writing ADC_CALFACT only when ADEN = 1 and ADSTART = 0 and JADSTART = 0 (ADC enabled and no conversion is ongoing)
Bit 30 ADCALDIF: Differential mode for calibration
This bit is set and cleared by software to configure the single-ended or Differential inputs mode for the calibration.
0: Writing ADCAL launches a calibration in single-ended inputs mode.
1: Writing ADCAL launches a calibration in Differential inputs mode.
Note: The software is allowed to write this bit only when the ADC is disabled and is not calibrating (ADCAL = 0, JADSTART = 0, JADSTP = 0, ADSTART = 0, ADSTP = 0, ADDIS = 0 and ADEN = 0).
Bit 29 DEEPPWD: Deep-power-down enable
This bit is set and cleared by software to put the ADC in Deep-power-down mode.
0: ADC not in Deep-power down
1: ADC in Deep-power-down (default reset state)
Note: The software is allowed to write this bit only when the ADC is disabled (ADCAL = 0, JADSTART = 0, JADSTP = 0, ADSTART = 0, ADSTP = 0, ADDIS = 0 and ADEN = 0).
Bit 28 ADVREGEN: ADC voltage regulator enable
This bits is set by software to enable the ADC voltage regulator.
Before performing any operation such as launching a calibration or enabling the ADC, the ADC voltage regulator must first be enabled and the software must wait for the regulator start-up time.
0: ADC Voltage regulator disabled
1: ADC Voltage regulator enabled.
For more details about the ADC voltage regulator enable and disable sequences, refer to Section 27.4.6: ADC Deep-power-down mode (DEEPPWD) and ADC voltage regulator (ADVREGEN).
The software can program this bit field only when the ADC is disabled (ADCAL = 0, JADSTART = 0, ADSTART = 0, ADSTP = 0, ADDIS = 0 and ADEN = 0).
Bits 27:6 Reserved, must be kept at reset value.
Bit 5 JADSTP: ADC stop of injected conversion command
This bit is set by software to stop and discard an ongoing injected conversion (JADSTP Command).
It is cleared by hardware when the conversion is effectively discarded and the ADC injected sequence and triggers can be re-configured. The ADC is then ready to accept a new start of injected conversions (JADSTART command).
0: No ADC stop injected conversion command ongoing
1: Write 1 to stop injected conversions ongoing. Read 1 means that an ADSTP command is in progress.
Note: The software is allowed to set JADSTP only when JADSTART = 1 and ADDIS = 0 (ADC is enabled and eventually converting an injected conversion and there is no pending request to disable the ADC)
In auto-injection mode (JAUTO = 1), setting ADSTP bit aborts both regular and injected conversions (do not use JADSTP)
Bit 4 ADSTP: ADC stop of regular conversion command
This bit is set by software to stop and discard an ongoing regular conversion (ADSTP Command).
It is cleared by hardware when the conversion is effectively discarded and the ADC regular sequence and triggers can be re-configured. The ADC is then ready to accept a new start of regular conversions (ADSTART command).
0: No ADC stop regular conversion command ongoing
1: Write 1 to stop regular conversions ongoing. Read 1 means that an ADSTP command is in progress.
Note: The software is allowed to set ADSTP only when ADSTART = 1 and ADDIS = 0 (ADC is enabled and eventually converting a regular conversion and there is no pending request to disable the ADC).
In auto-injection mode (JAUTO = 1), setting ADSTP bit aborts both regular and injected conversions (do not use JADSTP).
Bit 3 JADSTART: ADC start of injected conversion
This bit is set by software to start ADC conversion of injected channels. Depending on the configuration bits JEXTEN, a conversion immediately starts (software trigger configuration) or once an injected hardware trigger event occurs (hardware trigger configuration).
It is cleared by hardware:
- – in single conversion mode when software trigger is selected (JEXTSEL = 0x0): at the assertion of the End of Injected Conversion Sequence (JEOS) flag.
- – in all cases: after the execution of the JADSTP command, at the same time that JADSTP is cleared by hardware.
0: No ADC injected conversion is ongoing.
1: Write 1 to start injected conversions. Read 1 means that the ADC is operating and eventually converting an injected channel.
Note: The software is allowed to set JADSTART only when ADEN = 1 and ADDIS = 0 (ADC is enabled and there is no pending request to disable the ADC).
In auto-injection mode (JAUTO = 1), regular and auto-injected conversions are started by setting bit ADSTART (JADSTART must be kept cleared)
Bit 2 ADSTART: ADC start of regular conversion
This bit is set by software to start ADC conversion of regular channels. Depending on the configuration bits EXTEN, a conversion immediately starts (software trigger configuration) or once a regular hardware trigger event occurs (hardware trigger configuration).
It is cleared by hardware:
- – in single conversion mode when software trigger is selected (EXTSEL = 0x0): at the assertion of the End of Regular Conversion Sequence (EOS) flag.
- – in all cases: after the execution of the ADSTP command, at the same time that ADSTP is cleared by hardware.
0: No ADC regular conversion is ongoing.
1: Write 1 to start regular conversions. Read 1 means that the ADC is operating and eventually converting a regular channel.
Note: The software is allowed to set ADSTART only when ADEN = 1 and ADDIS = 0 (ADC is enabled and there is no pending request to disable the ADC)
In auto-injection mode (JAUTO = 1), regular and auto-injected conversions are started by setting bit ADSTART (JADSTART must be kept cleared)
Bit 1 ADDIS: ADC disable command
This bit is set by software to disable the ADC (ADDIS command) and put it into power-down state (OFF state).
It is cleared by hardware once the ADC is effectively disabled (ADEN is also cleared by hardware at this time).
0: no ADDIS command ongoing
1: Write 1 to disable the ADC. Read 1 means that an ADDIS command is in progress.
Note: The software is allowed to set ADDIS only when ADEN = 1 and both ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing)
Bit 0 ADEN: ADC enable control
This bit is set by software to enable the ADC. The ADC is effectively ready to operate once the flag ADRDY has been set.
It is cleared by hardware when the ADC is disabled, after the execution of the ADDIS command.
0: ADC is disabled (OFF state)
1: Write 1 to enable the ADC.
Note: The software is allowed to set ADEN only when all bits of ADC_CR registers are 0 (ADCAL = 0, JADSTART = 0, ADSTART = 0, ADSTP = 0, ADDIS = 0 and ADEN = 0) except for bit ADVREGEN which must be 1 (and the software must have wait for the startup time of the voltage regulator)
27.7.4 ADC configuration register (ADC_CFGR)
Address offset: 0x0C
Reset value: 0x8000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| JQDIS | AWD1CH[4:0] | JAUTO | JAWD1EN | AWD1EN | AWD1SGL | JQM | JDISCEN | DISCNUM[2:0] | DISCEN | ||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw |
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| ALIGN | AUTDLY | CONT | OVRMOD | EXTEN[1:0] | EXTSEL4 | EXTSEL3 | EXTSEL2 | EXTSEL1 | EXTSEL0 | RES[1:0] | ADFCFG | DMACFG | DMAEN | ||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw |
Bit 31 JQDIS: Injected queue disable
This bit is set and cleared by software to disable the injected queue mechanism:
0: Injected queue enabled
1: Injected queue disabled
Note: The software is allowed to write this bit only when ADSTART = 0 and JADSTART = 0 (which ensures that no regular nor injected conversion is ongoing).
A set or reset of JQDIS bit causes the injected queue to be flushed and the ADC_JSQR register is cleared.
Bits 30:26 AWD1CH[4:0]: Analog watchdog 1 channel selection
These bits are set and cleared by software. They select the input channel to be guarded by the analog watchdog.
00000: ADC analog input channel 0 monitored by AWD1
00001: ADC analog input channel 1 monitored by AWD1
.....
10010: ADC analog input channel 18 monitored by AWD1
others: reserved, must not be used
Note: Some channels are not connected physically. Keep the corresponding AWD1CH[4:0] setting to the reset value.
The channel selected by AWD1CH must be also selected into the SQi or JSQi bits.
The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Bit 25 JAUTO: Automatic injected group conversion
This bit is set and cleared by software to enable/disable automatic injected group conversion after regular group conversion.
0: Automatic injected group conversion disabled
1: Automatic injected group conversion enabled
Note: The software is allowed to write this bit only when ADSTART = 0 and JADSTART = 0 (which ensures that no regular nor injected conversion is ongoing).
When dual mode is enabled (DUAL bits in ADC_CCR register are not equal to zero), the bit JAUTO of the slave ADC is no more writable and its content is equal to the bit JAUTO of the master ADC.
Bit 24 JAWD1EN: Analog watchdog 1 enable on injected channels
This bit is set and cleared by software
0: Analog watchdog 1 disabled on injected channels
1: Analog watchdog 1 enabled on injected channels
Note: The software is allowed to write this bit only when JADSTART = 0 (which ensures that no injected conversion is ongoing).
Bit 23 AWD1EN: Analog watchdog 1 enable on regular channels
This bit is set and cleared by software
0: Analog watchdog 1 disabled on regular channels
1: Analog watchdog 1 enabled on regular channels
Note: The software is allowed to write this bit only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 22 AWD1SGL: Enable the watchdog 1 on a single channel or on all channels
This bit is set and cleared by software to enable the analog watchdog on the channel identified by the AWD1CH[4:0] bits or on all the channels
0: Analog watchdog 1 enabled on all channels
1: Analog watchdog 1 enabled on a single channel
Note: The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Bit 21 JQM: ADC_JSQR queue mode
This bit is set and cleared by software.
It defines how an empty Queue is managed.
0: ADC_JSQR mode 0: The Queue is never empty and maintains the last written configuration into ADC_JSQR.
1: ADC_JSQR mode 1: The Queue can be empty and when this occurs, the software and hardware triggers of the injected sequence are both internally disabled just after the completion of the last valid injected sequence.
Refer to Section 27.4.21: Queue of context for injected conversions for more information.
Note: The software is allowed to write this bit only when JADSTART = 0 (which ensures that no injected conversion is ongoing).
When dual mode is enabled (DUAL bits in ADC_CCR register are not equal to zero), the bit JQM of the slave ADC is no more writable and its content is equal to the bit JQM of the master ADC.
Bit 20 JDISCEN: Discontinuous mode on injected channels
This bit is set and cleared by software to enable/disable discontinuous mode on the injected channels of a group.
0: Discontinuous mode on injected channels disabled
1: Discontinuous mode on injected channels enabled
Note: The software is allowed to write this bit only when JADSTART = 0 (which ensures that no injected conversion is ongoing).
It is not possible to use both auto-injected mode and discontinuous mode simultaneously: the bits DISCEN and JDISCEN must be kept cleared by software when JAUTO is set.
When dual mode is enabled (bits DUAL of ADC_CCR register are not equal to zero), the bit JDISCEN of the slave ADC is no more writable and its content is equal to the bit JDISCEN of the master ADC.
Bits 19:17 DISCNUM[2:0]: Discontinuous mode channel count
These bits are written by software to define the number of regular channels to be converted in discontinuous mode, after receiving an external trigger.
000: 1 channel
001: 2 channels
...
111: 8 channels
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
When dual mode is enabled (DUAL bits in ADC_CCR register are not equal to zero), the bits DISCNUM[2:0] of the slave ADC are no more writable and their content is equal to the bits DISCNUM[2:0] of the master ADC.
Bit 16 DISCEN: Discontinuous mode for regular channels
This bit is set and cleared by software to enable/disable discontinuous mode for regular channels.
0: Discontinuous mode for regular channels disabled
1: Discontinuous mode for regular channels enabled
Note: It is not possible to have both discontinuous mode and continuous mode enabled: it is forbidden to set both DISCEN = 1 and CONT = 1.
It is not possible to use both auto-injected mode and discontinuous mode simultaneously: the bits DISCEN and JDISCEN must be kept cleared by software when JAUTO is set.
The software is allowed to write this bit only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
When dual mode is enabled (DUAL bits in ADC_CCR register are not equal to zero), the bit DISCEN of the slave ADC is no more writable and its content is equal to the bit DISCEN of the master ADC.
- Bit 15 ALIGN: Data alignment
- This bit is set and cleared by software to select right or left alignment. Refer to Section : Data register, data alignment and offset (ADC_DR, OFFSET, OFFSET_CH, ALIGN).
- 0: Right alignment
- 1: Left alignment
- Note: The software is allowed to write this bit only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
- Bit 14 AUTDLY: Delayed conversion mode
- This bit is set and cleared by software to enable/disable the Auto Delayed Conversion mode.:
- 0: Auto-delayed conversion mode off
- 1: Auto-delayed conversion mode on
- Note: The software is allowed to write this bit only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
- When dual mode is enabled (DUAL bits in ADC_CCR register are not equal to zero), the bit AUTDLY of the slave ADC is no more writable and its content is equal to the bit AUTDLY of the master ADC.
- Bit 13 CONT: Single / continuous conversion mode for regular conversions
- This bit is set and cleared by software. If it is set, regular conversion takes place continuously until it is cleared.
- 0: Single conversion mode
- 1: Continuous conversion mode
- Note: It is not possible to have both discontinuous mode and continuous mode enabled: it is forbidden to set both DISCEN = 1 and CONT = 1.
- The software is allowed to write this bit only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
- When dual mode is enabled (DUAL bits in ADC_CCR register are not equal to zero), the bit CONT of the slave ADC is no more writable and its content is equal to the bit CONT of the master ADC.
- Bit 12 OVRMOD: Overrun mode
- This bit is set and cleared by software and configure the way data overrun is managed.
- 0: ADC_DR register is preserved with the old data when an overrun is detected.
- 1: ADC_DR register is overwritten with the last conversion result when an overrun is detected.
- Note: The software is allowed to write this bit only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
- Bits 11:10 EXTEN[1:0]: External trigger enable and polarity selection for regular channels
- These bits are set and cleared by software to select the external trigger polarity and enable the trigger of a regular group.
- 00: Hardware trigger detection disabled (conversions can be launched by software)
- 01: Hardware trigger detection on the rising edge
- 10: Hardware trigger detection on the falling edge
- 11: Hardware trigger detection on both the rising and falling edges
- Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bits 9:5 EXTSEL[4:0]: External trigger selection for regular group
These bits select the external event used to trigger the start of conversion of a regular group:
00000: adc_ext_trg0
00001: adc_ext_trg1
00010: adc_ext_trg2
00011: adc_ext_trg3
00100: adc_ext_trg4
00101: adc_ext_trg5
00110: adc_ext_trg6
00111: adc_ext_trg7
...
11111: adc_ext_trg31
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bits 4:3 RES[1:0]: Data resolution
These bits are written by software to select the resolution of the conversion.
00: 12-bit
01: 10-bit
10: 8-bit
11: 6-bit
Note: The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Bit 2 ADFCFG: ADF mode configuration
This bit is set and cleared by software to enable the ADF mode. It is effective only when DMAEN = 0.
0: ADF mode disabled
1: ADF mode enabled
Note: To make sure no conversion is ongoing, the software is allowed to write this bit only when ADSTART = 0 and JADSTART = 0.
Bit 1 DMACFG: Direct memory access configuration
This bit is set and cleared by software to select between two DMA modes of operation and is effective only when DMAEN = 1.
0: DMA One Shot mode selected
1: DMA Circular mode selected
For more details, refer to Section : Managing conversions using the DMA
Note: The software is allowed to write this bit only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
In dual-ADC modes, this bit is not relevant and replaced by control bit DMACFG of the ADC_CCR register.
Bit 0 DMAEN: Direct memory access enable
This bit is set and cleared by software to enable the generation of DMA requests. This allows to use the DMA to manage automatically the converted data. For more details, refer to Section : Managing conversions using the DMA.
0: DMA disabled
1: DMA enabled
Note: The software is allowed to write this bit only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
In dual-ADC modes, this bit is not relevant and replaced by control bits MDMA[1:0] of the ADC_CCR register.
27.7.5 ADC configuration register 2 (ADC_CFGR2)
Address offset: 0x10
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Res. | Res. | Res. | Res. | SMPTRIG | BULB | SWTRIG | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. |
| rw | rw | rw | |||||||||||||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| Res. | Res. | Res. | Res. | Res. | ROVSM | TROVS | OVSS[3:0] | OVSR[2:0] | JOVSE | ROVSE | |||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | |||||
Bits 31:28 Reserved, must be kept at reset value.
Bit 27 SMPTRIG: Sampling time control trigger mode
This bit is set and cleared by software to enable the sampling time control trigger mode.
0: Sampling time control trigger mode disabled
1: Sampling time control trigger mode enabled
The sampling time starts on the trigger rising edge, and the conversion on the trigger falling edge.
EXTEN bit should be set to 01. BULB bit must not be set when the SMPTRIG bit is set.
When EXTEN bit is set to 00, set SWTRIG to start the sampling and clear SWTRIG bit to start the conversion.
Note: The software is allowed to write this bit only when ADSTART = 0 (which ensures that no conversion is ongoing).
Bit 26 BULB: Bulb sampling mode
This bit is set and cleared by software to enable the bulb sampling mode.
0: Bulb sampling mode disabled
1: Bulb sampling mode enabled. The sampling period starts just after the previous end of conversion.
SAMPTRIG bit must not be set when the BULB bit is set.
The very first ADC conversion is performed with the sampling time specified in SMPx bits.
Note: The software is allowed to write this bit only when ADSTART = 0 (which ensures that no conversion is ongoing).
Bit 25 SWTRIG: Software trigger bit for sampling time control trigger mode
This bit is set and cleared by software to enable the bulb sampling mode.
0: Software trigger starts the conversion for sampling time control trigger mode
1: Software trigger starts the sampling for sampling time control trigger mode
Note: The software is allowed to write this bit only when ADSTART = 0 (which ensures that no conversion is ongoing).
Bits 24:17 Reserved, must be kept at reset value.
Bits 16:11 Reserved, must be kept at reset value.
Bit 10 ROVSM: Regular oversampling mode
This bit is set and cleared by software to select the regular oversampling mode.
0: Continued mode: When injected conversions are triggered, the oversampling is temporary stopped and continued after the injection sequence (oversampling buffer is maintained during injected sequence)
1: Resumed mode: When injected conversions are triggered, the current oversampling is aborted and resumed from start after the injection sequence (oversampling buffer is zeroed by injected sequence start)
Note: The software is allowed to write this bit only when ADSTART = 0 (which ensures that no conversion is ongoing).
Bit 9 TROVS: Triggered Regular oversampling
This bit is set and cleared by software to enable triggered oversampling
0: All oversampled conversions for a channel are done consecutively following a trigger
1: Each oversampled conversion for a channel needs a new trigger
Note: The software is allowed to write this bit only when ADSTART = 0 (which ensures that no conversion is ongoing).
Bits 8:5 OVSS[3:0]: Oversampling shift
This bitfield is set and cleared by software to define the right shifting applied to the raw oversampling result.
0000: No shift
0001: Shift 1-bit
0010: Shift 2-bits
0011: Shift 3-bits
0100: Shift 4-bits
0101: Shift 5-bits
0110: Shift 6-bits
0111: Shift 7-bits
1000: Shift 8-bits
Other codes reserved
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no conversion is ongoing).
Bits 4:2 OVSR[2:0]: Oversampling ratio
This bitfield is set and cleared by software to define the oversampling ratio.
000: 2x
001: 4x
010: 8x
011: 16x
100: 32x
101: 64x
110: 128x
111: 256x
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no conversion is ongoing).
Bit 1 JOVSE: Injected oversampling Enable
This bit is set and cleared by software to enable injected oversampling.
0: Injected oversampling disabled
1: Injected oversampling enabled
Note: The software is allowed to write this bit only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing)
Bit 0 ROVSE: Regular oversampling Enable
This bit is set and cleared by software to enable regular oversampling.
0: Regular oversampling disabled
1: Regular oversampling enabled
Note: The software is allowed to write this bit only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing)
27.7.6 ADC sample time register 1 (ADC_SMPR1)
Address offset: 0x14
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| SMPPL US | Res. | SMP9[2:0] | SMP8[2:0] | SMP7[2:0] | SMP6[2:0] | SMP5[2:1] | |||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | |
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| SMP5[ 0] | SMP4[2:0] | SMP3[2:0] | SMP2[2:0] | SMP1[2:0] | SMP0[2:0] | ||||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw |
Bit 31 SMPPLUS: Addition of one clock cycle to the sampling time.
1: 2.5 ADC clock cycle sampling time becomes 3.5 ADC clock cycles for the ADC_SMPR1 and ADC_SMPR2 registers.
0: The sampling time remains set to 2.5 ADC clock cycles remains
To make sure no conversion is ongoing, the software is allowed to write this bit only when ADSTART = 0 and JADSTART = 0.
Bit 30 Reserved, must be kept at reset value.
Bits 29:0 SMPx[2:0]: Channel x sampling time selection (x = 9 to 0)
These bits are written by software to select the sampling time individually for each channel. During sample cycles, the channel selection bits must remain unchanged.
000: 2.5 ADC clock cycles
001: 6.5 ADC clock cycles
010: 12.5 ADC clock cycles
011: 24.5 ADC clock cycles
100: 47.5 ADC clock cycles
101: 92.5 ADC clock cycles
110: 247.5 ADC clock cycles
111: 640.5 ADC clock cycles
Note: The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Some channels are not connected physically. Keep the corresponding SMPx[2:0] setting to the reset value.
27.7.7 ADC sample time register 2 (ADC_SMPR2)
Address offset: 0x18
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Res | Res | Res | Res | Res | SMP18[2:0] | SMP17[2:0] | SMP16[2:0] | SMP15[2:1] | |||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | |||||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| SMP15[0] | SMP14[2:0] | SMP13[2:0] | SMP12[2:0] | SMP11[2:0] | SMP10[2:0] | ||||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw |
Bits 31:27 Reserved, must be kept at reset value.
Bits 26:0 SMPx[2:0]: Channel x sampling time selection (x = 18 to 10)
These bits are written by software to select the sampling time individually for each channel. During sampling cycles, the channel selection bits must remain unchanged.
- 000: 2.5 ADC clock cycles
- 001: 6.5 ADC clock cycles
- 010: 12.5 ADC clock cycles
- 011: 24.5 ADC clock cycles
- 100: 47.5 ADC clock cycles
- 101: 92.5 ADC clock cycles
- 110: 247.5 ADC clock cycles
- 111: 640.5 ADC clock cycles
Note: The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Some channels are not connected physically. Keep the corresponding SMPx[2:0] setting to the reset value.
27.7.8 ADC watchdog threshold register 1 (ADC_TR1)
Address offset: 0x20
Reset value: 0x0FFF 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Res. | Res. | Res. | Res. | HT1[11:0] | |||||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | ||||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| Res. | AWDFILT[2:0] | LT1[11:0] | |||||||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | |
Bits 31:28 Reserved, must be kept at reset value.
Bits 27:16 HT1[11:0]: Analog watchdog 1 higher threshold
These bits are written by software to define the higher threshold for the analog watchdog 1.
Note: The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Bit 15 Reserved, must be kept at reset value.
Bits 14:12 AWDFILT[2:0]: Analog watchdog filtering parameter
This bit is set and cleared by software.
000: No filtering
001: two consecutive detection generates an AWDx flag or an interrupt
...
111: Eight consecutive detection generates an AWDx flag or an interrupt
Note: The software is allowed to write this bit only when ADSTART = 0 (which ensures that no conversion is ongoing).
Bits 11:0 LT1[11:0]: Analog watchdog 1 lower threshold
These bits are written by software to define the lower threshold for the analog watchdog 1.
Note: The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
27.7.9 ADC watchdog threshold register 2 (ADC_TR2)
Address offset: 0x24
Reset value: 0x00FF 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | HT2[7:0] | |||||||
| rw | rw | rw | rw | rw | rw | rw | rw | ||||||||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | LT2[7:0] | |||||||
| rw | rw | rw | rw | rw | rw | rw | rw | ||||||||
Bits 31:24 Reserved, must be kept at reset value.
Bits 23:16 HT2[7:0]: Analog watchdog 2 higher threshold
These bits are written by software to define the higher threshold for the analog watchdog 2.
Note: The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Bits 15:8 Reserved, must be kept at reset value.
Bits 7:0 LT2[7:0]: Analog watchdog 2 lower threshold
These bits are written by software to define the lower threshold for the analog watchdog 2.
Note: The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
27.7.10 ADC watchdog threshold register 3 (ADC_TR3)
Address offset: 0x28
Reset value: 0x00FF 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | HT3[7:0] | |||||||
| rw | rw | rw | rw | rw | rw | rw | rw | ||||||||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | LT3[7:0] | |||||||
| rw | rw | rw | rw | rw | rw | rw | rw | ||||||||
Bits 31:24 Reserved, must be kept at reset value.
Bits 23:16 HT3[7:0]: Analog watchdog 3 higher threshold
These bits are written by software to define the higher threshold for the analog watchdog 3.
Note: The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Bits 15:8 Reserved, must be kept at reset value.
Bits 7:0 LT3[7:0]: Analog watchdog 3 lower threshold
These bits are written by software to define the lower threshold for the analog watchdog 3.
This watchdog compares the 8-bit of LT3 with the 8 MSB of the converted data.
Note: The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
27.7.11 ADC regular sequence register 1 (ADC_SQR1)
Address offset: 0x30
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Res. | Res. | Res. | SQ4[4:0] | Res. | SQ3[4:0] | Res. | SQ2[4] | ||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | |||||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| SQ2[3:0] | Res. | SQ1[4:0] | Res. | Res. | L[3:0] | ||||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | |||
Bits 31:29 Reserved, must be kept at reset value.
Bits 28:24 SQ4[4:0]: 4th conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 4th in the regular conversion sequence.
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 23 Reserved, must be kept at reset value.
Bits 22:18 SQ3[4:0]: 3rd conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 3rd in the regular conversion sequence.
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 17 Reserved, must be kept at reset value.
Bits 16:12 SQ2[4:0]: 2nd conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 2nd in the regular conversion sequence.
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 11 Reserved, must be kept at reset value.
Bits 10:6 SQ1[4:0]: 1st conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 1st in the regular conversion sequence.
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bits 5:4 Reserved, must be kept at reset value.
Bits 3:0 L[3:0]: Regular channel sequence length
These bits are written by software to define the total number of conversions in the regular channel conversion sequence.
0000: 1 conversion
0001: 2 conversions
...
1111: 16 conversions
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Note: Some channels are not connected physically and must not be selected for conversion.
27.7.12 ADC regular sequence register 2 (ADC_SQR2)
Address offset: 0x34
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Res. | Res. | Res. | SQ9[4:0] | Res. | SQ8[4:0] | Res. | SQ7[4] | ||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | |||||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| SQ7[3:0] | Res. | SQ6[4:0] | Res. | SQ5[4:0] | |||||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | ||
Bits 31:29 Reserved, must be kept at reset value.
Bits 28:24 SQ9[4:0]: 9th conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 9th in the regular conversion sequence.
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 23 Reserved, must be kept at reset value.
Bits 22:18 SQ8[4:0]: 8th conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 8th in the regular conversion sequence
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 17 Reserved, must be kept at reset value.
Bits 16:12 SQ7[4:0]: 7th conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 7th in the regular conversion sequence.
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 11 Reserved, must be kept at reset value.
Bits 10:6 SQ6[4:0]: 6th conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 6th in the regular conversion sequence.
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 5 Reserved, must be kept at reset value.
Bits 4:0 SQ5[4:0]: 5th conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 5th in the regular conversion sequence.
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Note: Some channels are not connected physically and must not be selected for conversion.
27.7.13 ADC regular sequence register 3 (ADC_SQR3)
Address offset: 0x38
Reset value: 0x0000 0000
| column_1 | column_2 | column_3 | column_4 | column_5 | column_6 | column_7 | column_8 | column_9 | column_10 | column_11 | column_12 | column_13 | column_14 | column_15 | column_16 | column_17 | column_18 | column_19 | column_20 | column_21 | column_22 | column_23 | column_24 | column_25 | column_26 | column_27 | column_28 | column_29 | column_30 | column_31 | column_32 | column_33 | column_34 | column_35 | column_36 | column_37 | column_38 | column_39 | column_40 | column_41 | column_42 | column_43 | column_44 | column_45 | . . . | column_47 | column_48 | column_49 | column_50 | column_51 | column_52 | column_53 | column_54 | column_55 | column_56 | column_57 | column_58 | column_59 | column_60 | column_61 | column_62 | column_63 | column_64 | column_65 | column_66 | column_67 | column_68 | column_69 | column_70 | column_71 | column_72 | column_73 | column_74 | = = = | column_76 | column_77 | column_78 | column_79 | column_80 | column_81 | column_82 | column_83 | column_84 | column_85 | column_86 | column_87 | column_88 | column_89 | column_90 | column_91 | column_92 | column_93 | column_94 | column_95 | column_96 | column_97 | column_98 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Bits 10:6 | SQ6[4:0]: | 6th conversion in regular sequence | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Note: The software is allowed to write these bits only when ADSTART | = | 0 (which ensures | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Bits 4:0 | SQ5[4:0]: | 5th conversion in regular sequence | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Note: The software is allowed to write these bits only when ADSTART | = | 0 (which ensures | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 27.7.13 ADC regular sequenc | e register 3 (AD | C_SQR3) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Reset value: 0x0000 0 | 00 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 31 | 30 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Res. | Res. Res. | SQ14[4: | 0] | Res. | SQ13[4:0] | Res. | SQ12[4] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 15 | 14 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| SQ12[3:0] | Res. | SQ11[4:0] | Res. | SQ10[4:0] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| rw | rw rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw |
Bits 31:29 Reserved, must be kept at reset value.
Bits 28:24 SQ14[4:0]: 14th conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 14th in the regular conversion sequence.
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 23 Reserved, must be kept at reset value.
Bits 22:18 SQ13[4:0]: 13th conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 13th in the regular conversion sequence.
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 17 Reserved, must be kept at reset value.
Bits 16:12 SQ12[4:0]: 12th conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 12th in the regular conversion sequence.
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 11 Reserved, must be kept at reset value.
Bits 10:6 SQ11[4:0]: 11th conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 11th in the regular conversion sequence.
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 5 Reserved, must be kept at reset value.
Bits 4:0 SQ10[4:0]: 10th conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 10th in the regular conversion sequence.
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Note: Some channels are not connected physically and must not be selected for conversion.
27.7.14 ADC regular sequence register 4 (ADC_SQR4)
Address offset: 0x3C
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. |
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| Res. | Res. | Res. | Res. | Res. | SQ16[4:0] | Res. | SQ15[4:0] | ||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | ||||||
Bits 31:11 Reserved, must be kept at reset value.
Bits 10:6 SQ16[4:0]: 16th conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 16th in the regular conversion sequence.
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 5 Reserved, must be kept at reset value.
Bits 4:0 SQ15[4:0]: 15th conversion in regular sequence
These bits are written by software with the channel number (0 to 18) assigned as the 15th in the regular conversion sequence.
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Note: Some channels are not connected physically and must not be selected for conversion.
27.7.15 ADC regular data register (ADC_DR)
Address offset: 0x40
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. |
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| RDATA[15:0] | |||||||||||||||
| r | r | r | r | r | r | r | r | r | r | r | r | r | r | r | r |
Bits 31:16 Reserved, must be kept at reset value.
Bits 15:0 RDATA[15:0]: Regular data converted
These bits are read-only. They contain the conversion result from the last converted regular channel. The data are left- or right-aligned as described in Section 27.4.26: Data management.
27.7.16 ADC injected sequence register (ADC_JSQR)
Address offset: 0x4C
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
| JSQ4[4:0] | Res. | JSQ3[4:0] | Res. | JSQ2[4:1] | |||||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | ||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| JSQ2[0] | Res. | JSQ1[4:0] | JEXTEN[1:0] | JEXTSEL[4:0] | JL[1:0] | ||||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | |
Bits 31:27 JSQ4[4:0]: 4th conversion in the injected sequence
These bits are written by software with the channel number (0 to 18) assigned as the 4th in the injected conversion sequence.
Note: The software is allowed to write these bits only when JADSTART = 0 (which ensures that no injected conversion is ongoing).
Bit 26 Reserved, must be kept at reset value.
Bits 25:21 JSQ3[4:0]: 3rd conversion in the injected sequence
These bits are written by software with the channel number (0 to 18) assigned as the 3rd in the injected conversion sequence.
Note: The software is allowed to write these bits only when JADSTART = 0 (which ensures that no injected conversion is ongoing).
Bit 20 Reserved, must be kept at reset value.
Bits 19:15 JSQ2[4:0]: 2nd conversion in the injected sequence
These bits are written by software with the channel number (0 to 18) assigned as the 2nd in the injected conversion sequence.
Note: The software is allowed to write these bits only when JADSTART = 0 (which ensures that no injected conversion is ongoing).
Bit 14 Reserved, must be kept at reset value.
Bits 13:9 JSQ1[4:0]: 1st conversion in the injected sequence
These bits are written by software with the channel number (0 to 18) assigned as the 1st in the injected conversion sequence.
Note: The software is allowed to write these bits only when JADSTART = 0 (which ensures that no injected conversion is ongoing).
- Bits 8:7 JEXTEN[1:0]: External trigger enable and polarity selection for injected channels
These bits are set and cleared by software to select the external trigger polarity and enable the trigger of an injected group.
00: If JQDIS = 0 (queue enabled), hardware and software trigger detection disabled.
Otherwise, the queue is disabled as well as hardware trigger detection (conversions can be launched by software)
01: Hardware trigger detection on the rising edge
10: Hardware trigger detection on the falling edge
11: Hardware trigger detection on both the rising and falling edges
Note: The software is allowed to write these bits only when JADSTART = 0 (which ensures that no injected conversion is ongoing).
If JQM = 1 and if the Queue of Context becomes empty, the software and hardware triggers of the injected sequence are both internally disabled (refer to Section 27.4.21: Queue of context for injected conversions) - Bits 6:2 JEXTSEL[4:0]: External Trigger Selection for injected group
These bits select the external event used to trigger the start of conversion of an injected group:
00000: adc_jext_trg0
00001: adc_jext_trg1
00010: adc_jext_trg2
00011: adc_jext_trg3
00100: adc_jext_trg4
00101: adc_jext_trg5
00110: adc_jext_trg6
00111: adc_jext_trg7
...
11111: adc_jext_trg31
Note: The software is allowed to write these bits only when JADSTART = 0 (which ensures that no injected conversion is ongoing). - Bits 1:0 JL[1:0]: Injected channel sequence length
These bits are written by software to define the total number of conversions in the injected channel conversion sequence.
00: 1 conversion
01: 2 conversions
10: 3 conversions
11: 4 conversions
Note: The software is allowed to write these bits only when JADSTART = 0 (which ensures that no injected conversion is ongoing).
Note: Some channels are not connected physically and must not be selected for conversion.
27.7.17 ADC offset y register (ADC_OFRy)
Address offset: 0x60+0x04*(y-1), (y = 1 to 4)
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| OFFSET_EN | OFFSET_CH[4:0] | SATEN | OFFSE TPOS | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | ||||
| rw | rw | rw | rw | rw | rw | rw | rw | ||||||||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| Res. | Res. | Res. | Res. | OFFSET[11:0] | |||||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | ||||
Bit 31 OFFSET_EN: Offset y enable
This bit is written by software to enable or disable the offset programmed into bits OFFSET[11:0].
Note: The software is allowed to write this bit only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Bits 30:26 OFFSET_CH[4:0]: Channel selection for the data offset y
These bits are written by software to define the channel to which the offset programmed into bits OFFSET[11:0] applies.
Note: The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Some channels are not connected physically and must not be selected for the data offset y.
If OFFSET_EN is set, it is not allowed to select the same channel for different ADC_OFRy registers.
Bit 25 SATEN: Saturation enable
This bit is set and cleared by software to enable the saturation at 0x000 and 0xFFF for the offset function.
0: No saturation control, offset result can be signed
1: Saturation enabled, offset result unsigned and saturated at 0x000 and 0xFFF
Note: The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Bit 24 OFFSETPOS: Positive offset
This bit is set and cleared by software to enable the positive offset.
0: Negative offset
1: Positive offset
Note: The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Bits 23:12 Reserved, must be kept at reset value.
Bits 11:0 OFFSET[11:0]: Data offset y for the channel programmed into bits OFFSET_CH[4:0]
These bits are written by software to define the offset to be subtracted from the raw converted data when converting a channel (can be regular or injected). The channel to which applies the data offset must be programmed in the bits OFFSET_CH[4:0]. The conversion result can be read from in the ADC_DR (regular conversion) or from in the ADC_JDRy registers (injected conversion).
Note: The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
If several offset (OFFSET) point to the same channel, only the offset with the lowest x value is considered for the subtraction.
Ex: if OFFSET1_CH[4:0] = 4 and OFFSET2_CH[4:0] = 4, this is OFFSET1[11:0] which is subtracted when converting channel 4.
27.7.18 ADC injected channel y data register (ADC_JDRy)
Address offset: 0x80+0x04*(y-1), (y = 1 to 4)
Reset value: 0x0000 0000
| RM0477 | column_2 | Bit 24 Bits 11:0 | column_4 | OFFSETPOS 0: Negative offset 1: Positive offset OFFSET[11:0]: | JADSTART = JADSTART = | : Positive offset | = | column_9 | column_10 | column_11 | = | column_13 | = 0 and = 0 and | column_15 | column_16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. |
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 JDATA[15:0] | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| r | r | r | r | r | r | r | r | r | r | r | r | r | r | r | r |
| Bits 15:0 | JDATA[15:0]: | Injected data | |||||||||||||
| data are left -or right-aligned as described in | Section 27.4.26: Data management | . |
Bits 31:16 Reserved, must be kept at reset value.
Bits 15:0 JDATA[15:0]: Injected data
These bits are read-only. They contain the conversion result from injected channel y. The data are left -or right-aligned as described in Section 27.4.26: Data management.
27.7.19 ADC analog watchdog 2 configuration register (ADC_AWD2CR)
Address offset: 0xA0
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | AWD2CH[18:16] | ||
| rw | rw | rw | |||||||||||||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| AWD2CH[15:0] | |||||||||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw |
Bits 31:19 Reserved, must be kept at reset value.
Bits 18:0 AWD2CH[18:0]: Analog watchdog 2 channel selection
These bits are set and cleared by software. They enable and select the input channels to be guarded by the analog watchdog 2.
AWD2CH[i] = 0: ADC analog input channel i is not monitored by AWD2
AWD2CH[i] = 1: ADC analog input channel i is monitored by AWD2
When AWD2CH[18:0] = 000..0, the analog Watchdog 2 is disabled
Note: The channels selected by AWD2CH must be also selected into the SQi or JSQi bits.
The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Some channels are not connected physically and must not be selected for the analog watchdog.
27.7.20 ADC analog watchdog 3 configuration register (ADC_AWD3CR)
Address offset: 0xA4
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | AWD3CH[18:16] | ||
| rw | rw | rw | |||||||||||||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| AWD3CH[15:0] | |||||||||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw |
Bits 31:19 Reserved, must be kept at reset value.
Bits 18:0 AWD3CH[18:0]: Analog watchdog 3 channel selection
These bits are set and cleared by software. They enable and select the input channels to be guarded by the analog watchdog 3.
AWD3CH[i] = 0: ADC analog input channel i is not monitored by AWD3
AWD3CH[i] = 1: ADC analog input channel i is monitored by AWD3
When AWD3CH[18:0] = 000..0, the analog Watchdog 3 is disabled
Note: The channels selected by AWD3CH must be also selected into the SQi or JSQi bits.
The software is allowed to write these bits only when ADSTART = 0 and JADSTART = 0 (which ensures that no conversion is ongoing).
Some channels are not connected physically and must not be selected for the analog watchdog.
27.7.21 ADC Differential mode selection register (ADC_DIFSEL)
Address offset: 0xB0
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | DIFSEL[18:16] | ||
| rw | rw | rw | |||||||||||||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| DIFSEL[15:0] | |||||||||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | r |
Bits 31:19 Reserved, must be kept at reset value.
Bits 18:0 DIFSEL[18:0]: Differential mode for channels 18 to 0.
These bits are set and cleared by software. They allow to select if a channel is configured as single-ended or Differential mode.
DIFSEL[i] = 0: ADC analog input channel i is configured in single-ended mode
DIFSEL[i] = 1: ADC analog input channel i is configured in Differential mode
Note: The DIFSEL bits corresponding to channels that are either connected to a single-ended I/O port or to an internal channel must be kept their reset value (single-ended input mode).
The software is allowed to write these bits only when the ADC is disabled (ADCAL = 0, JADSTART = 0, JADSTP = 0, ADSTART = 0, ADSTP = 0, ADDIS = 0 and ADEN = 0).
27.7.22 ADC calibration factors (ADC_CALFACT)
Address offset: 0xB4
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | CALFACT_D[6:0] | ||||||
| rw | rw | rw | rw | rw | rw | rw | |||||||||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | CALFACT_S[6:0] | ||||||
| rw | rw | rw | rw | rw | rw | rw | |||||||||
Bits 31:23 Reserved, must be kept at reset value.
Bits 22:16 CALFACT_D[6:0]: Calibration Factors in differential mode
These bits are written by hardware or by software.
Once a differential inputs calibration is complete, they are updated by hardware with the calibration factors.
Software can write these bits with a new calibration factor. If the new calibration factor is different from the current one stored into the analog ADC, it is then applied once a new differential calibration is launched.
Note: The software is allowed to write these bits only when ADEN = 1, ADSTART = 0 and JADSTART = 0 (ADC is enabled and no calibration is ongoing and no conversion is ongoing).
Bits 15:7 Reserved, must be kept at reset value.
Bits 6:0 CALFACT_S[6:0]: Calibration Factors In single-ended mode
These bits are written by hardware or by software.
Once a single-ended inputs calibration is complete, they are updated by hardware with the calibration factors.
Software can write these bits with a new calibration factor. If the new calibration factor is different from the current one stored into the analog ADC, it is then applied once a new single-ended calibration is launched.
Note: The software is allowed to write these bits only when ADEN = 1, ADSTART = 0 and JADSTART = 0 (ADC is enabled and no calibration is ongoing and no conversion is ongoing).
27.7.23 ADC option register (ADC_OR)
Address offset: 0xC8
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. |
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | OP0 |
| rw |
Bits 31:1 Reserved, must be kept at reset value.
Bit 0 OP0: Option bit 0
0: VDDCORE channel disabled
1: VDDCORE channel enabled
Note: ADC_OR register might be reserved on some ADC instances. Refer to Section 27.3: ADC implementation.
27.8 ADC common registers
These registers define the control and status registers common to master and slave ADCs:
27.8.1 ADC common status register (ADC_CSR)
Address offset: 0x300
Reset value: 0x0000 0000
This register provides an image of the status bits of the different ADC. Nevertheless it is read-only and does not allow to clear the different status bits. Instead each status bit must be cleared by writing 0 to it in the corresponding ADC_ISR register.
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Res. | Res. | Res. | Res. | Res. | JQOVF_SLV | AWD3_SLV | AWD2_SLV | AWD1_SLV | JEOS_SLV | JEOC_SLV | OVR_SLV | EOS_SLV | EOC_SLV | EOSMP_SLV | ADRDY_SLV |
| r | r | r | r | r | r | r | r | r | r | r | |||||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| Res. | Res. | Res. | Res. | Res. | JQOVF_MST | AWD3_MST | AWD2_MST | AWD1_MST | JEOS_MST | JEOC_MST | OVR_MST | EOS_MST | EOC_MST | EOSMP_MST | ADRDY_MST |
| r | r | r | r | r | r | r | r | r | r | r |
Bits 31:27 Reserved, must be kept at reset value.
Bit 26 JQOVF_SLV: Injected Context Queue Overflow flag of the slave ADC
This bit is a copy of the JQOVF bit in the corresponding ADC_ISR register.
Bit 25 AWD3_SLV: Analog watchdog 3 flag of the slave ADC
This bit is a copy of the AWD3 bit in the corresponding ADC_ISR register.
Bit 24 AWD2_SLV: Analog watchdog 2 flag of the slave ADC
This bit is a copy of the AWD2 bit in the corresponding ADC_ISR register.
Bit 23 AWD1_SLV: Analog watchdog 1 flag of the slave ADC
This bit is a copy of the AWD1 bit in the corresponding ADC_ISR register.
Bit 22 JEOS_SLV: End of injected sequence flag of the slave ADC
This bit is a copy of the JEOS bit in the corresponding ADC_ISR register.
Bit 21 JEOC_SLV: End of injected conversion flag of the slave ADC
This bit is a copy of the JEOC bit in the corresponding ADC_ISR register.
Bit 20 OVR_SLV: Overrun flag of the slave ADC
This bit is a copy of the OVR bit in the corresponding ADC_ISR register.
- Bit 19 EOS_SLV: End of regular sequence flag of the slave ADC. This bit is a copy of the EOS bit in the corresponding ADC_ISR register.
- Bit 18 EOC_SLV: End of regular conversion of the slave ADC
This bit is a copy of the EOC bit in the corresponding ADC_ISR register. - Bit 17 EOSMP_SLV: End of Sampling phase flag of the slave ADC
This bit is a copy of the EOSMP2 bit in the corresponding ADC_ISR register. - Bit 16 ADRDY_SLV: Slave ADC ready
This bit is a copy of the ADRDY bit in the corresponding ADC_ISR register. - Bits 15:11 Reserved, must be kept at reset value.
- Bit 10 JQOVF_MST: Injected Context Queue Overflow flag of the master ADC
This bit is a copy of the JQOVF bit in the corresponding ADC_ISR register. - Bit 9 AWD3_MST: Analog watchdog 3 flag of the master ADC
This bit is a copy of the AWD3 bit in the corresponding ADC_ISR register. - Bit 8 AWD2_MST: Analog watchdog 2 flag of the master ADC
This bit is a copy of the AWD2 bit in the corresponding ADC_ISR register. - Bit 7 AWD1_MST: Analog watchdog 1 flag of the master ADC
This bit is a copy of the AWD1 bit in the corresponding ADC_ISR register. - Bit 6 JEOS_MST: End of injected sequence flag of the master ADC
This bit is a copy of the JEOS bit in the corresponding ADC_ISR register. - Bit 5 JEOC_MST: End of injected conversion flag of the master ADC
This bit is a copy of the JEOC bit in the corresponding ADC_ISR register. - Bit 4 OVR_MST: Overrun flag of the master ADC
This bit is a copy of the OVR bit in the corresponding ADC_ISR register. - Bit 3 EOS_MST: End of regular sequence flag of the master ADC
This bit is a copy of the EOS bit in the corresponding ADC_ISR register. - Bit 2 EOC_MST: End of regular conversion of the master ADC
This bit is a copy of the EOC bit in the corresponding ADC_ISR register. - Bit 1 EOSMP_MST: End of Sampling phase flag of the master ADC
This bit is a copy of the EOSMP bit in the corresponding ADC_ISR register. - Bit 0 ADRDY_MST: Master ADC ready
This bit is a copy of the ADRDY bit in the corresponding ADC_ISR register.
27.8.2 ADC common control register (ADC_CCR)
Address offset: 0x308
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Res. | Res. | Res. | Res. | Res. | Res. | Res. | VBATE N | TSEN | VREF EN | PRESC[3:0] | CKMODE[1:0] | ||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | |||||||
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| MDMA[1:0] | DMA CFG | Res. | DELAY[3:0] | Res. | Res. | Res. | DUAL[4:0] | ||||||||
| rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | rw | ||||
Bits 31:25 Reserved, must be kept at reset value.
Bit 24 VBATEN: VBAT enable
This bit is set and cleared by software to control.
0: VBAT channel disabled
1: VBAT channel enabled
Bit 23 TSEN: VSENSE enable
This bit is set and cleared by software to control VSENSE.
0: Temperature sensor channel disabled
1: Temperature sensor channel enabled
Bit 22 VREFEN: VREFINT enable
This bit is set and cleared by software to enable/disable the VREFINT channel.
0: VREFINT channel disabled
1: VREFINT channel enabled
Bits 21:18 PRESC[3:0]: ADC prescaler
These bits are set and cleared by software to select the frequency of the clock to the ADC.
The clock is common for all the ADCs.
0000: input ADC clock not divided
0001: input ADC clock divided by 2
0010: input ADC clock divided by 4
0011: input ADC clock divided by 6
0100: input ADC clock divided by 8
0101: input ADC clock divided by 10
0110: input ADC clock divided by 12
0111: input ADC clock divided by 16
1000: input ADC clock divided by 32
1001: input ADC clock divided by 64
1010: input ADC clock divided by 128
1011: input ADC clock divided by 256
other: reserved
Note: The software is allowed to write these bits only when the ADC is disabled (ADCAL = 0, JADSTART = 0, ADSTART = 0, ADSTP = 0, ADDIS = 0 and ADEN = 0). The ADC prescaler value is applied only when CKMODE[1:0] = 0b00.
Bits 17:16 CKMODE[1:0]: ADC clock mode
These bits are set and cleared by software to define the ADC clock scheme (which is common to both master and slave ADCs):
00: adc_ker_ck (x = 1/2) (Asynchronous clock mode), generated at product level (refer to Section 6: Reset and clock control (RCC))
01: adc_hclk/1 (Synchronous clock mode). This configuration must be enabled only if the AHB clock prescaler is set to 1 (BMPRE[3:0] = 0XXX in the RCC_BMCFGR register) and if the system clock has a 50% duty cycle.
10: adc_hclk/2 (Synchronous clock mode)
11: adc_hclk/4 (Synchronous clock mode)
In all synchronous clock modes, there is no jitter in the delay from a timer trigger to the start of a conversion.
Note: The software is allowed to write these bits only when the ADCs are disabled (ADCAL = 0, JADSTART = 0, ADSTART = 0, ADSTP = 0, ADDIS = 0 and ADEN = 0).
Bits 15:14 MDMA[1:0]: Direct memory access mode for dual ADC mode
This bitfield is set and cleared by software. Refer to the DMA controller section for more details.
00: MDMA mode disabled
01: Reserved
10: MDMA mode enabled for 12 and 10-bit resolution
11: MDMA mode enabled for 8 and 6-bit resolution
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 13 DMACFG: DMA configuration (for dual ADC mode)
This bit is set and cleared by software to select between two DMA modes of operation and is effective only when DMAEN = 1.
0: DMA One Shot mode selected
1: DMA Circular mode selected
For more details, refer to Section : Managing conversions using the DMA
Note: The software is allowed to write these bits only when ADSTART = 0 (which ensures that no regular conversion is ongoing).
Bit 12 Reserved, must be kept at reset value.
Bits 11:8 DELAY[3:0]: Delay between 2 sampling phases
These bits are set and cleared by software. These bits are used in dual interleaved modes. Refer to Table 241 for the value of ADC resolution versus DELAY bits values.
Note: The software is allowed to write these bits only when the ADCs are disabled (ADCAL = 0, JADSTART = 0, ADSTART = 0, ADSTP = 0, ADDIS = 0 and ADEN = 0).
Bits 7:5 Reserved, must be kept at reset value.
Bits 4:0 DUAL[4:0]: Dual ADC mode selection
These bits are written by software to select the operating mode. 00000 corresponds to Independent mode. Values 00001 to 01001 correspond to dual mode, master and slave ADCs working together.
00000: Independent mode
00001: Combined regular simultaneous + injected simultaneous mode
00010: Combined regular simultaneous + alternate trigger mode
00011: Combined interleaved mode + injected simultaneous mode
00100: Reserved
00101: Injected simultaneous mode only
00110: Regular simultaneous mode only
00111: Interleaved mode only
01001: Alternate trigger mode only
Others: Reserved, must not be used
Note: The software is allowed to write these bits only when the ADCs are disabled (ADCAL = 0, JADSTART = 0, ADSTART = 0, ADSTP = 0, ADDIS = 0 and ADEN = 0).
Table 241. DELAY bits versus ADC resolution
| DELAY bits | 12-bit resolution | 10-bit resolution | 8-bit resolution | 6-bit resolution |
|---|---|---|---|---|
| 0000 | 1 * Tadc_ker_ck | 1 * Tadc_ker_ck | 1 * Tadc_ker_ck | 1 * Tadc_ker_ck |
| 0001 | 2 * Tadc_ker_ck | 2 * Tadc_ker_ck | 2 * Tadc_ker_ck | 2 * Tadc_ker_ck |
| 0010 | 3 * Tadc_ker_ck | 3 * Tadc_ker_ck | 3 * Tadc_ker_ck | 3 * Tadc_ker_ck |
| 0011 | 4 * Tadc_ker_ck | 4 * Tadc_ker_ck | 4 * Tadc_ker_ck | 4 * Tadc_ker_ck |
| 0100 | 5 * Tadc_ker_ck | 5 * Tadc_ker_ck | 5 * Tadc_ker_ck | 5 * Tadc_ker_ck |
| 0101 | 6 * Tadc_ker_ck | 6 * Tadc_ker_ck | 6 * Tadc_ker_ck | 6 * Tadc_ker_ck |
| 0110 | 7 * Tadc_ker_ck | 7 * Tadc_ker_ck | 7 * Tadc_ker_ck | 6 * Tadc_ker_ck |
| 0111 | 8 * Tadc_ker_ck | 8 * Tadc_ker_ck | 8 * Tadc_ker_ck | 6 * Tadc_ker_ck |
| 1000 | 9 * Tadc_ker_ck | 9 * Tadc_ker_ck | 8 * Tadc_ker_ck | 6 * Tadc_ker_ck |
| 1001 | 10 * Tadc_ker_ck | 10 * Tadc_ker_ck | 8 * Tadc_ker_ck | 6 * Tadc_ker_ck |
| 1010 | 11 * Tadc_ker_ck | 10 * Tadc_ker_ck | 8 * Tadc_ker_ck | 6 * Tadc_ker_ck |
| 1011 | 12 * Tadc_ker_ck | 10 * Tadc_ker_ck | 8 * Tadc_ker_ck | 6 * Tadc_ker_ck |
| others | 12 * Tadc_ker_ck | 10 * Tadc_ker_ck | 8 * Tadc_ker_ck | 6 * Tadc_ker_ck |
27.8.3 ADC common regular data register for dual mode (ADC_CDR)
Address offset: 0x30C
Reset value: 0x0000 0000
| 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 |
| RDATA_SLV[15:0] | |||||||||||||||
| r | r | r | r | r | r | r | r | r | r | r | r | r | r | r | r |
| 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
| RDATA_MST[15:0] | |||||||||||||||
| r | r | r | r | r | r | r | r | r | r | r | r | r | r | r | r |
Bits 31:16 RDATA_SLV[15:0]: Regular data of the slave ADC
In dual mode, these bits contain the regular data of the slave ADC. Refer to Section 27.4.31: Dual ADC modes.
The data alignment is applied as described in Section : Data register, data alignment and offset (ADC_DR, OFFSET, OFFSET_CH, ALIGN)
Bits 15:0 RDATA_MST[15:0]: Regular data of the master ADC.
In dual mode, these bits contain the regular data of the master ADC. Refer to Section 27.4.31: Dual ADC modes.
The data alignment is applied as described in Section : Data register, data alignment and offset (ADC_DR, OFFSET, OFFSET_CH, ALIGN)
In MDMA = 0b11 mode, bits 15:8 contains SLV_ADC_DR[7:0], bits 7:0 contains MST_ADC_DR[7:0].

27.9 ADC register map
The following table summarizes the ADC registers.
Table 242. ADC global register map
| Offset | Register |
|---|---|
| 0x000 - 0x0B4 | Master ADC1 |
| 0x0B8 - 0x0FC | Reserved |
| 0x100 - 0x1B4 | Slave ADC2 |
| 0x1B8 - 0x2FC | Reserved |
| 0x300 - 0x30C | Master and slave ADCs common registers |
Table 243. ADC register map and reset values for each ADC (offset = 0x000 for master ADC, 0x100 for slave ADC)
| Offset | Register name | 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 | 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0x00 | ADC_ISR | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | JQOVF | JQOVF | AWD3 | AWD2 | AWD1 | JEOS | JEOC | OVR | EOS | EOC | EOSMP | ADRDY |
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||
| 0x04 | ADC_IER | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | JQOVFIE | JQOVFIE | AWD3IE | AWD2IE | AWD1IE | JEOSIE | JEOCIE | OVRIE | EOSIE | EOCIE | EOSMPIE | ADRDYIE |
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||
| 0x08 | ADC_CR | ADCAL | ADCALDIF | DEEPPWD | ADVREGEN | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | JADSTP | ADSTP | JADSTART | ADSTART | ADDIS | ADEN | |
| Reset value | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||
| 0x0C | ADC_CFGR | JQDIS | AWD1CH[4:0] | JAUTO | JAWD1EN | AWD1EN | AWD1SGL | JQM | JDISCEN | DISCNUM[2:0] | DISCEN | ALIGN | AUTDLY | CONT | OVRMOD | EXTEN[1:0] | EXTSEL4 | EXTSEL3 | EXTSEL2 | EXTSEL1 | EXTSEL0 | RES[1:0] | ADFCFG | DMACFG | DMAEN | |||||||||
| Reset value | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| 0x0C | ADC_CFGR2 | Res | Res | Res | Res | SMPTRIG | BULB | SWTRIG | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | ROVSM | TROVS | OVSS[3:0] | OVSR[2:0] | JOVSE | ROVSE | |||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||
| 0x14 | ADC_SMPR1 | SMPPLUS | Res | SMP9 [2:0] | SMP8 [2:0] | SMP7 [2:0] | SMP6 [2:0] | SMP5 [2:0] | SMP4 [2:0] | SMP3 [2:0] | SMP2 [2:0] | SMP1 [2:0] | SMP0 [2:0] | |||||||||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
| 0x18 | ADC_SMPR2 | Res | Res | Res | Res | Res | SMP18 [2:0] | SMP17 [2:0] | SMP16 [2:0] | SMP15 [2:0] | SMP14 [2:0] | SMP13 [2:0] | SMP12 [2:0] | SMP11 [2:0] | SMP10 [2:0] | |||||||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| 0x1C | Reserved | Res | ||||||||||||||||||||||||||||||||
| 0x20 | ADC_TR1 | Res | Res | Res | Res | HT1[11:0] | Res | AWDFILT [2:0] | LT1[11:0] | |||||||||||||||||||||||||
| Reset value | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
Table 243. ADC register map and reset values for each ADC (offset = 0x000 for master ADC, 0x100 for slave ADC) (continued)
| Offset | Register name | 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 | 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0x24 | ADC_TR2 | Res | Res | Res | Res | Res | Res | Res | Res | HT2[[7:0]] | Res | Res | Res | Res | Res | Res | Res | Res | Res | LT2[7:0] | |||||||||||||
| Reset value | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||
| 0x28 | ADC_TR3 | Res | Res | Res | Res | Res | Res | Res | Res | HT3[[7:0]] | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | LT3[7:0] | ||||||||||||
| Reset value | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||
| 0x2C | Reserved | Res. | |||||||||||||||||||||||||||||||
| 0x30 | ADC_SQR1 | Res | Res | Res | SQ4[4:0] | Res | SQ3[4:0] | Res | SQ2[4:0] | Res | SQ1[4:0] | Res | Res | L[3:0] | |||||||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||
| 0x34 | ADC_SQR2 | Res | Res | Res | SQ9[4:0] | Res | SQ8[4:0] | Res | SQ7[4:0] | Res | SQ6[4:0] | Res | Res | SQ5[4:0] | |||||||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||
| 0x38 | ADC_SQR3 | Res | Res | Res | SQ14[4:0] | Res | SQ13[4:0] | Res | SQ12[4:0] | Res | SQ11[4:0] | Res | Res | SQ10[4:0] | |||||||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||
| 0x3C | ADC_SQR4 | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | SQ16[4:0] | SQ15[4:0] | ||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||
| 0x40 | ADC_DR | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | regular RDATA[15:0] | |||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||
| 0x44-0x48 | Reserved | Res. | |||||||||||||||||||||||||||||||
| 0x4C | ADC_JSQR | JSQ4[4:0] | Res. | JSQ3[4:0] | Res. | JSQ2[4:0] | Res. | JSQ1[4:0] | JEXTEN[1:0] | JEXTSEL[4:0] | JL[1:0] | ||||||||||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| 0x50-0x5C | Reserved | Res. | |||||||||||||||||||||||||||||||
| 0x60 | ADC_OFR1 | OFFSET_EN | OFFSET_CH[4:0] | SATEN | OFFSETPOS | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | OFFSET[11:0] | ||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||
| 0x64 | ADC_OFR2 | OFFSET_EN | OFFSET_CH[4:0] | SATEN | OFFSETPOS | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | OFFSET[11:0] | ||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||
| 0x68 | ADC_OFR3 | OFFSET_EN | OFFSET_CH[4:0] | SATEN | OFFSETPOS | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | OFFSET[11:0] | ||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||
| 0x6C | ADC_OFR4 | OFFSET_EN | OFFSET_CH[4:0] | SATEN | OFFSETPOS | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | Res. | OFFSET[11:0] | ||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||
| 0x70-0x7C | Reserved | Res. | |||||||||||||||||||||||||||||||

Table 243. ADC register map and reset values for each ADC (offset = 0x000
for master ADC, 0x100 for slave ADC) (continued)
| Offset | Register name | 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 | 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0x80 | ADC_JDR1 | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | JDATA1[15:0] | |||||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||
| 0x84 | ADC_JDR2 | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | JDATA2[15:0] | |||||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||
| 0x88 | ADC_JDR3 | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | JDATA3[15:0] | |||||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||
| 0x8C | ADC_JDR4 | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | JDATA4[15:0] | |||||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||
| 0x90-0x9C | Reserved | Res. | |||||||||||||||||||||||||||||||||
| 0xA0 | ADC_AWD2CR | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | AWD2CH[18:0] | ||||||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||
| 0xA4 | ADC_AWD3CR | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | AWD3CH[18:0] | ||||||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||
| 0xA8-0xAC | Reserved | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | ||
| 0xB0 | ADC_DIFSEL | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | DIFSEL[18:0] | ||||||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||
| 0xB4 | ADC_CALFACT | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | CALFACT_D[6:0] | Res | Res | Res | Res | Res | Res | Res | CALFACT_S[6:0] | ||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||
| 0xB8-0xC4 | Reserved | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | ||
| 0xC8 | ADC_OR | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | OP0 | ||
| Reset value | 0 | ||||||||||||||||||||||||||||||||||
| 0xCC-0xFC | Reserved | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | ||
Table 244. ADC register map and reset values (master and slave ADC
common registers)
| Offset | Register name | 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 | 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0x300 | ADC_CSR | Res. | Res. | Res. | Res. | Res. | JQOVF_SLV | AWD3_SLV | AWD2_SLV | AWD1_SLV | JEOS_SLV | JEOC_SLV | OVR_SLV | EOS_SLV | EOC_SLV | EOSMP_SLV | ADRDY_SLV | Res. | Res. | Res. | Res. | Res. | JQOVF_MST | AWD3_MST | AWD2_MST | AWD1_MST | JEOS_MST | JEOC_MST | OVR_MST | EOS_MST | EOC_MST | EOSMP_MST | ADRDY_MST |
| slave ADC2 | master ADC1 | ||||||||||||||||||||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||
| 0x304 | Reserved | Res. | |||||||||||||||||||||||||||||||
| 0x308 | ADC_CCR | Res. | Res. | Res. | Res. | Res. | Res. | VBATEN | TSEN | VREFEN | PRESC[3:0] | CKMODE[1:0] | MDMA[1:0] | DMACFG | Res. | DELAY[3:0] | Res. | Res. | Res. | DUAL[4:0] | |||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||
| Offset | Register name | 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 | 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 | 0 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0x30C | ADC_CDR | RDATA_SLV[15:0] | RDATA_MST[15:0] | ||||||||||||||||||||||||||||||
| Reset value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0x310-0x3EC | Reserved | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res | Res |
Refer to Section 2.3: Memory organization for the register boundary addresses.